Nacap is an expert in the field of horizontal directional drilling (HDD). We have used this specialist technique all over the world, solving the most difficult challenges. Because of our expertise we always find the most efficient and economical solution for every drilling problem.
We have extensive knowledge of the industry and experience in the field, to be able to guarantee professionalism and high quality service. We use our own modern and well maintained equipment to handle your project.
Waterways Nature reserves Major roads and traffic junctions Railways Industrial sites Densely populated regions and urban areas Landfalls and outfalls Flood plains and bogs Unstable soil conditions For getting below contaminated ground.
ThaIL aND
no matter how complex we have the right tools for the job
The rigs used by Nacap are purpose built for tropical and remote locations and feature computer controlled drilling. With 9 drilling rigs worldwide, we are able to meet all of our customers' requirements. We have developed several drilling machines ourselves. These machines have a pulling capa city of up to 400Te. To date we have completed more than 700 HDD crossings around the world in all types of ground conditions for cables & pipes up to 1,200 mm (48) in diameter and over 2,000 m.
hdd in steps
a pilot hole is drilled according to the pro file design. Directional control is achieved by using the survey steering tool system. The survey probe installed in the drilling assembly measures the survey data re quired for steering the drilling tool along the design profile The hole is then enlarged and conditioned in stages using a sequence of reamers/ flycutters/hole openers to the required diameter for receiving the product pipe The product pipe is then pulled into the hole by the rig
UNITeD KINgDoM
Java, Indonesia, as part of Kodecos offshore ePCI services for West Ma dura and Poleng fields. The hDD pipe string was a 2,000 m long DN400 (16) steel gas pipeline with 1 concrete coating for buoyancy purpose. This crossing was the longest shore ap proach that Nacap has completed to date. Complex logistics, community issues, security concerns and strict environ mental procedures were just some of the issues that confronted Nacap during the West african gas Pipeline project
(WagP) and the BP Tangguh project in Irian Jaya. Permafrost, marshland, rock, humidity, densely populated or remote areas are other conditions under which projects have been completed.
INDoNesIa
mailing address Nacap b.v. P.O. Box 46 9750 AA Haren The Netherlands T +31 (0)50 599 12 00 F +31 (0)50 599 12 22 E info@nacap.com W www.nacap.com
w w w . n a c a p . co m