horizontal directional drilling

a specialist that successfully executes projects, no matter how complex

we have the knowledge to handle your project

no matter how complex we have the knowledge to handle your project

Nacap is an expert in the field of horizontal directional drilling (HDD). We have used this specialist technique all over the world, solving the most difficult challenges. Because of our expertise we always find the most efficient and economical solution for every drilling problem.

We have extensive knowledge of the industry and experience in the field, to be able to guarantee professionalism and high quality service. We use our own modern and well maintained equipment to handle your project.

Benefits of horizontal directional drilling


We have established ourselves as the leader in HDD industry. HDD constitutes an important component of many pipe line construction projects. For more than twenty years we have employed this drilling technique as an environmen tally friendly, safe, realiable and efficient alternative to conventional construction methods. Horizontal directional drilling is more efficient, often more economi cal, faster and, above all, has much less impact on the environment. It is also widely used in the oil and gas, power and telecommunications industries for bringing pipelines and cables ashore or taking them offshore. The characteristics of HDD make it the best solution for many customer needs; in some cases it provides the only prac tical solution. Nacap uses horizontal directional drilling for, among others:

Waterways Nature reserves Major roads and traffic junctions Railways Industrial sites Densely populated regions and urban areas Landfalls and outfalls Flood plains and bogs Unstable soil conditions For getting below contaminated ground.

ThaIL aND

sai noi-north/south Bangkok power plants gas pipeline project


Installation of 44 crossings by HDD technology. Total length of 45,000 m (up to 2 km per crossing). This required the use of three rigs one of 180, 275 and 300 tonnes. Major challenges of the project were the heavy traffic, difficult access and densely populated and congested areas.

environmentally friendly with minimal disturBance


The traditional method of constructing a pipeline, in which a trench is exca vated, can lead to major obstructions and objections amongst various autho rities and in different areas. Horizontal directional drilling avoids breaking open or causing damage to these areas and it minimises the impact to the surroun dings of the works.

we have the right tools for the job

no matter how complex we have the right tools for the job

our specialist equipment standard and custom Built


Nacaps success is partly attributable to the inhouse development and the use of specialist HDD equipment. Feed back from projects is integrated in the design and development of equipment on a continous basis. The resulting improvements in effici ency and safety contribute to environ mentally friendly and timely project completion, critical issues for Nacaps clients.

The rigs used by Nacap are purpose built for tropical and remote locations and feature computer controlled drilling. With 9 drilling rigs worldwide, we are able to meet all of our customers' requirements. We have developed several drilling machines ourselves. These machines have a pulling capa city of up to 400Te. To date we have completed more than 700 HDD crossings around the world in all types of ground conditions for cables & pipes up to 1,200 mm (48) in diameter and over 2,000 m.

hdd in steps
a pilot hole is drilled according to the pro file design. Directional control is achieved by using the survey steering tool system. The survey probe installed in the drilling assembly measures the survey data re quired for steering the drilling tool along the design profile The hole is then enlarged and conditioned in stages using a sequence of reamers/ flycutters/hole openers to the required diameter for receiving the product pipe The product pipe is then pulled into the hole by the rig

UNITeD KINgDoM

Barton stacey to lockerley pipeline project


In this project an HDD of 1,125 meter had to be constructed under a sensitive location, the river Test. This river harbours the famous trout fishing industry and therefore any chance that drilling mud would escape into the water had to be avoided. Thanks to excellent team work, the HDD crossing was completed with minimal disturbance to the environment.

we have the experience

no matter how complex we have the experience

our extensive track record


We give the highest priority to working safely, transparently and with respect for our environment. We have a con vincing track record of successfully completed projects. These projects were executed with a level of quality and professionalism that exceeded our clients expectations. Nacap always works with clients in order to devise the best solution. In 2008, for instance, Nacap successfully completed a horizontal directional dril ling shore approach in gresik, east

Java, Indonesia, as part of Kodecos offshore ePCI services for West Ma dura and Poleng fields. The hDD pipe string was a 2,000 m long DN400 (16) steel gas pipeline with 1 concrete coating for buoyancy purpose. This crossing was the longest shore ap proach that Nacap has completed to date. Complex logistics, community issues, security concerns and strict environ mental procedures were just some of the issues that confronted Nacap during the West african gas Pipeline project

(WagP) and the BP Tangguh project in Irian Jaya. Permafrost, marshland, rock, humidity, densely populated or remote areas are other conditions under which projects have been completed.

the landfall method


(onshore option) a pilot hole will be drilled from onshore entry point towards offshore exit point along a planned profile assisted by down hole steering tool system The drilled hole will be enlarged using a sequence of reamers/flycutters from onshore towards offshore Product pipestring fabricated onshore will be pulled through the reamed hole from onshore towards offshore by a HDD rig located onboard the drill barge

INDoNesIa

west madura and poleng field


Installation of a shore approach of a 16 submarine gas pipeline by horizontal directional drilling, measuring 2,000 m in length, as part of the West Madura and Poleng Field project in east Java for oil & gas operator, Kodeco energy Co Ltd.

visiting address Nacap b.v. Machlaan 5 9761 TK Eelde The Netherlands

mailing address Nacap b.v. P.O. Box 46 9750 AA Haren The Netherlands T +31 (0)50 599 12 00 F +31 (0)50 599 12 22 E info@nacap.com W www.nacap.com

w w w . n a c a p . co m

Anda mungkin juga menyukai