Power Generation Project up to 2016

Date:19.05.2011
Projects Completion Year 2010
Sl. No Name of the Power Plant
Public Sector 1 Shikalbaha 150 MW Siddhirganj 2X120 MW Peaking Power Plant 2 (2nd unit) EPC: BHEL Sub-Total ( Public) 150 105 BPDB EGCB

Capacity (MW)

Ownership

Expected Type of Fuel Commissioning Date


Gas Gas 18.08.2010 14.10.2010

Remarks

Under Commercial Operation Under Commercial Operation

255
55 55 50 45 100 55 50 110 Rental (BPDB) Rental (BPDB) Rental (BPDB) Rental (BPDB) Rental (BPDB) Rental (BPDB) Rental (BPDB) Rental (BPDB) FO Gas HSD HSD HSD HSD HSD HSD 06.05.2010 07.04.2010 02.08.2010 10.08.2010 23.08.2010 10.08.2010 24.11.2010 31.12.2010 Under Commercial Operation Under Commercial Operation Under Commercial Operation Under Commercial Operation Under Commercial Operation Under Commercial Operation Under Commercial Operation Under Commercial Operation

Private Sector
1 2 3 4 5 6 7 8 Shikalbaha 55 MW Rental Power Plant Ashugonj Rental Power Plant Thakurgaon 50 MW Rental
Ghorasal 3 Years Quick Rental Ghorasal 3 Years Quick Rental Khulna 3 Years Quick Rental Pagla 3 Years Quick Rental Bheramara 110 MW Rental

Sub-Total (Private) Total (December 2010)

520 775

Projects Completion by Year 2011


Public Sector 1 Fenchuganj 90 MW CCPP EPC: M/S Harbin Power Eng. Co. (HPE) 105 53 158 105 EGCB Gas July, 2011 First Unit Shut Down due to fault in the Generator since 18.06.2010. Finance: ADB Contract signed with JVCA Energypac Power Generation & Energypac Engineering on 26.04.2010. Contract effective from 25.05.2010 Target: 79.31% Achieved: 85.00% Contract signed with JVCA Energypac Power Generation & Energypac Engineering on 26.04.2010. Contract effective from 06.06.2010 Target: 80.67 % Achieved: 78.65% Contract signed with Guangdong Power Engineers Copr. China on 26.04.2010. Contract effective from 25.05.2010 Target: 65.76% Achieved: 65.93% Contract signed with Guangdong Power Engineers Copr. China on 26/04/2010. Contract effective from 15.06.2010 Target: 62.00% Achieved: 64.51% Contract signed with M/S Hyundai Heavy Industries, Korea on 26.04.2010. Contract effective from 30.05.2010 Target: 63.97% Achieved: 72.00% Contract signed with JVC Fujian Electric Power Engineering Co. on 13.05.2010. Contract effective from 12.06.2010 Target: 59.57% Achieved: 80.00% Contract signed with JVC Fujian Electric Power Engineering Co. on 13.05.2010. Contract effective from 12.06.2010 Target: 59.57% Achieved: 62.70% Contract signed on 24.08.2010. Target: 26% Achieved: 25.3% BPDB APSCL Gas Gas June, 2011 30.04.2011 GT-1 Under Test Run Expected commissioning by June2011. Finance: GOB Contract Signed on July 29, 2010. Under Commercial Operation

2 Ashuganj 50 MW Power Plant Sub-Total (Public)(Jan.-June/11) Siddhirganj 2X120 MW Peaking Power 3 Plant(1st unit) EPC: BHEL

4 Faridpur 50 MW Peaking Power Plant

54

BPDB

FO

July, 2011

5 Gopalganj 100 MW Peaking Power Plant

109

BPDB

FO

Aug, 2011

6 Dohazari 100 MW Peaking Power Plant

102

BPDB

Gas/ FO

Aug, 2011

7 Hathazari 100 MW Peaking Power Plant

98

BPDB

Gas/ FO

Sept, 2011

8 Bera 70 MW Peaking Power Plant

71

BPDB

FO

July, 2011

Doudkandi 50 MW Peaking Power Plant

52

BPDB

Gas/ FO

July, 2011

10 Baghabari 50 MW Peaking Power Plant

52

BPDB

FO

July, 2011

11 Gazipur Sub-Total (Public) (July-Dec/11) Sub-Total (Public)

50 693

RPCL

Gas/FO

November, 2011

851

Sl. No

Name of the Power Plant


PRIVATE SECTOR (Rental & Quick Rental)

Capacity (MW)

Ownership

Expected Type of Fuel Commissioning Date


Diesel FO FO FO Gas 17.02.2011 01.04.2011 27.05.2011 08.05.2011 25.05.2011

Remarks

Siddirganj Sponsor: Desh Energy Modanganj 2 Sponsor: Summit Power 1 3 4 5 Khulna KPCL Meghnagat Sponsor: IEL Ghorasal Sponsor: Max Power Ashugonj United Ashugonj Power Ltd. Nowapara Sponsor:Khan Jahan Ali B.Baria Aggreko 9 Ashugonj Sponsor: Aggreko Keranigonj Power Pack Amnura, Chapainawabgonj Sponsor: Sinha Power Siddirganj Sponsor: Dutch Bangla Power Sub-Total (Private) (Jan.-June/11) 13 Katakhali, Rajshahi Sponsor: NPSL Sponsor: Sponsor: Sponsor: Sponsor:

100 102 115 100 78

Rental (BPDB) Rental (BPDB) Rental (BPDB) Rental (BPDB) Rental (BPDB)

Under Commercial Operation Contract signed on 23.06.2010. Under Commercial Operation Contract signed on 23.06.2010. Target: 100% Achieved: 99% (Under Test Run) Contract signed on 30.06.2010. Under Commercial Operation Contract signed on 27.10.2010. 100 % Achieved: 90 % (Under Test Run) Contract signed on 23.12.2010. Target: 100% Achieved: 87% Contract signed on 25.07.2010. Target: 100% Achieved: 98% (Under Test Run) Under Commercial Operation Contract signed on 23.11.2010. 98% Achieved: 92 % Contract signed on 08.07.2010. Target: 100% Achieved: 75 % Contract signed on 15.07.2010. Target: 100% Achieved: 84 % Contract signed on 01.07.2010. Target: 100% Achieved: 79 % Contract signed on 27.07.2010. Target: 100% Achieved: 60% Contract signed with Quantum Power System Ltd. on 04.02.2010. Target: 100 % Achieved: 85 % Contract signed on 28.06.2010. Target: 100% Achieved: 47% Contract signed on 06.07.2010. Target: 100% Achieved: 64% Target:

Target:

53

Rental (BPDB)

Gas

30.05.2011

7 8

40 70 80

Rental (BPDB) Rental (BPDB) Rental (BPDB)

FO Gas Gas

30.05.2011 06.03.2011 05.06.2011

10

100

Rental (BPDB)

FO

10.06.2011

11

50

Rental (BPDB)

FO

07.06.2011

12

100

Rental (BPDB)

FO

06.06.2011

988
50 Rental (BPDB) FO 15.07.2011

14 Noapara, Jessore, 5 Years Rental

105

Rental (BPDB)

FO

15.07.2011

15

Meghnagat, Sponsor: HPGL Julda, Chittagong Sponsor: Acorn Infra. Service Ltd Sub-Total (Private) (July.-Dec./11) Sub-Total (Private) Total (2011)

100

Rental (BPDB)

FO

July, 2011

16

100

Rental (BPDB)

FO

22.08.2011

355 1343 2194

Projects Completion by Year 2012


Public Sector
Contract signed with M/S Shanghai Electric Group Co. Ltd on 08.02.2010. Target: 52% Achieved: 52% Finance: GOB Contract signed with M/S China Chengda Engineering Co. Ltd on 08.02.2010. Target: 56.00% Achieved: 55.00% Finance: GOB Contract signed with Dongfang ,China on 18.10.2010. Target: 27% Achieved: 25 % Contract signed with Dongfang ,China on 18.10.2010. Target: 27% Achieved: 23.75%

1 Sylhet 150 MW Power Plant

150

BPDB

Gas

January, 2012

2 Chandpur 150 MW CCPP

163

BPDB

Gas

March, 2012

3 Santahar 50 MW Peaking Power Plant

50

BPDB

FO/Gas

March, 2012

4 Katakhali 50 MW Peaking Power Plant

50 413

BPDB

FO/Gas

April, 2012

Sub-Total (Public)(Jan.-June/12)

Sl. No

Name of the Power Plant

Capacity (MW)
150 20 100 5 150 425

Ownership

Expected Type of Fuel Commissioning Date


Gas/HSD Gas/FO FO Solar FO July, 2012 July, 2012 November, 2012 December, 2012 December, 2012

Remarks
Contract signed on 12.10.2010. 19.02% Achieved: 19.00 % Target:

5 Sirajganj 150 MW GT 6 Raujan 7 Chapai Nababganj 8 Kaptai Solar 9 Kodda, Gazipur 150 MW Power Plant Sub-Total (Public) (July-Dec./12) Sub-Total( Public)

NWPGC RPCL BPDB BPDB BPDB- RPCL Powergen Ltd.

Contract Signed with Concord Pragatee Consurtium Ltd. On 23.03.2011 Procurement Process will start soon. PDPP preparation completed and sent to Ministry for Financing. 2 Tender received on 03.05.2011 & under Evaluation.

838
7 20 15 30 72 50 100 100 50 100 100 50 100 50 100 50 100 50 147 100 1247 IPP (BPDB) IPP (REB) IPP (REB) IPP (REB) IPP (BPDB) IPP (BPDB) IPP (BPDB) IPP (BPDB) IPP (BPDB) IPP (BPDB) IPP (BPDB) IPP (BPDB) IPP (BPDB) IPP (BPDB) IPP (BPDB) IPP (BPDB) IPP (BPDB) IPP IPP Solar Gas/FO FO FO FO FO Gas/FO Gas/FO FO FO FO FO FO FO FO FO FO Gas Gas/FO June, 2012 June, 2012 June, 2012 June, 2012 PQ received found nonresponsive. Revised of PQ documents under way RFP Evaluation Complete. RFP Evaluation Complete. RFP Evaluation Complete.

Private Sector
1 Solar 2 Tangail 20 MW 3 Chandpur 15 MW 4 Narayangonj 30 MW Sub-Total (Private) (Jan.-June/12) 5 Shantahar Peaking Plant 6 Syedpur Peaking Plant 7 Jamalpur Peaking 8 Comilla (Jangalia) Peaking 9 Khulna Peaking 10 Dhaka(Aminbazar)100 MW Power Plant 11 Dhaka(Aminbazar) 50 MW Power Plant 12 Chittagong (Patenga)100 MW Power Plant 13 Chittagong(Mohora) 50 MW Power Plant 14 Rajshahi(Ishwardi)100 MW Power Plant 15 Rajshahi (Natore) 50 MW Power Plant 16 Khulna(Labonchora)100 MW Power Plant 17 Barisal 50 MW Power Plant Bhola 150-225 MW CCPP (2nd unit):SC GT 18 Unit 19 Kaliakair Peaking Plant, Gazipur Sub-Total (Private) (July-Dec./12) Sub-Total (Private) Total (2012)

LOI Issued on 01.02.2011 July, 2012 LOI Issued on 01.02.2011 July, 2012 September, 2012 LOI Issued on 07.04.2011 September, 2012 Financial Evaluation complete & send to Ministry for Approval September, 2012 LOI Issued on 06.04.2011 September, 2012 Evaluation complete & send to Ministry for Approval September, 2012 Evaluation complete & send to Ministry for Approval September, 2012 LOI Issued on 07.04.2011 September, 2012 Approved by Purchase committee on 24.04.2011 September, 2012 LOI Issued on 07.04.2011 September, 2012 Evaluation complete & send to Ministry for Approval September, 2012 LOI Issued on 07.04.2011 September, 2012 Evaluation complete & send to Ministry for Approval October, 2012 November, 2012 LOI Issued on 22.11.2011 Financial Evaluation under Process

1319 2157

Projects Completion by Year 2013


Public Sector
1 Ghorasal 200-300 MW Peaking 2 Khulna 150 MW GT Sub-Total (Public)(Jan.-June/13) 3 Siddirganj 450 MW CCPP 4 Bhola 150 MW CCPP Sub-Total (Public) (July-Dec./13) Sub-Total ( Public) 290 150 440 450 150 600 EGCB BPDB Gas Gas December, 2013 December, 2013 Tender Evaluation Report send to WB. Finance: WB Consultant submitted Final feasibility Report. Finance: IDB BPDB NWPGC Gas /Diesel Gas/HSD March, 2013 March, 2013 Approved by Purchase Committee Contract Signed with Isolux Spain on 12.05.2011 ADB Finance:

1040
100 100 IPP (BPDB) IPP IPP IPP IPP IPP IPP Wind Gas/FO Gas Gas Gas/FO January, 2013 March, 2013 March, 2013 April, 2013 April, 2013 June, 2013 June, 2013 PQ received found nonresponsive. Revised of PQ documents under way PQ documents under preparation. Contract Signed with Summit Power on 12.05.2011. Contract Signed with Summit Power on 12.05.2011. Contract Signed with Summit Power on 12.05.2011. Re-Tender Invited on: 28.04.2011 Submission:28.06.2011 Tender

Private Sector
1 Wind 2 Savar Peaking Plant, Dhaka 3 4 5 Bibiana 300-450 MW CCPP (1 Unit): SC GT Unit Bibiana 300-450 MW CCPP (2 Unit
nd st

222 222 220 100 100 1064 70 70

Unit): SC GT
nd

Meghnaghat 300-450 MW CCPP (2 Duel Fuel: SC GT Unit

Unit)

6 Keraniganj 150 MW CCPP :SC GT Unit 7 Madanganj 150-225 MW CCPP :SC GT Unit Sub-Total (Private) (Jan.-June/13) 8
nd Bhola 150-225 MW CCPP (2 unit): ST Unit

Gas/FO Gas/FO

Technical Evaluation complete & in the process of financial offer opening.

IPP

Gas

August, 2013

LOI Issued on 22.11.2011

Sub-Total (Private) (July-Dec./13) Sub-Total (Private) Total (2013)

1134 2174

Sl. No

Name of the Power Plant

Capacity (MW)

Ownership

Expected Type of Fuel Commissioning Date

Remarks

Projects Completion by Year 2014


Public Sector
1 Haripur 360 MW CCPP 2 Barapukuria 250-300 MW (3rd Unit) 3 Ashugonj 150 CCPP 4 Shikalbaha 150-225 MW CCPP Sub-Total (Public)(Jan.-June/14) 5 Bheramara 360 MW CCPP Sub-Total (Public) (Jul.-Dec./14) Sub-Total ( Public) 360 250 150 150 910 360 360 EGCB BPDB APSCL BPDB NWPGC Gas Coal Gas Gas/FO Gas January, 2014 June, 2014 June, 2014 June, 2014 December, 2014 Contract signed with Marubini Corporation, Japan on 09.02.2011 In house feasibility completed. Tender Invited on : 04.04.2011 Tender Submission:05.06.2011 Preliminary Study is going on. DPP is Approved. Consultancy Contract signed.

Finance: JICA

1270
119 119 115 50 50 300 753 150 150 300 IPP IPP Imp. Coal Imp. Coal Sept. 2014 Sept. 2014 Financial offer under Evaluation. Financial offer under Evaluation. IPP IPP IPP IPP IPP IPP Gas Gas Gas/FO Gas/FO Gas/FO Gas March, 2014 April, 2014 April, 2014 June, 2014 June, 2014 June, 2014 Contract Signed with Summit Power on 12.05.2011. Contract Signed with Summit Power on 12.05.2011. Contract Signed with Summit Power on 12.05.2011. Re-Tender Invited on: 28.04.2011 Submission:28.06.2011 Tender

Private Sector
1 2 3 Bibiana 300-450 MW CCPP (1 Unit): ST Unit Bibiana 300-450 MW CCPP (2 Unit
nd st

Unit): ST

Meghnaghat 300-450 MW CCPP (2nd Unit) : ST Unit

4 Keraniganj 150 MW CCPP : ST Unit 5

Madanganj 150-225 MW CCPP :ST Unit

Technical Evaluation complete & in the process of financial offer opening. RFP Received on 10.04.2011 & under evaluation.

6 Sirajganj 300-450 MW CCPP Sub-Total(Private)(Jan.-June/14) Chittagong 150-300 MW Coal Fired Power 7 Project 8 Khulna 150-300 MW Coal Fired Power Project Sub-Total (Private) (July-Dec.14) Sub-Total (Private) Total (2014)

1053 2323

Projects Completion by Year 2015


Public Sector
1 Ashuganj 450 MW CCPP Sub-Total (Public)(Jan.-June/15) Sub-Total ( Public) 450 450 APSCL Gas March, 2015 Preliminary Works

450
PPP (Joint Vent.) / IPP NTPC submited Draft Feasibility Report. Formation of shell company approved on 25/04/2011 by Cabinet

Private Sector
1 Khulna South Sub-Total (Private) (Jan.-June/15) Maowa, Munshiganj 300-650 MW Coal Fired 2 Power Project 3 Chittagong 300-650 MW Coal Fired Power Project Sub-Total (Private) (July-Dec.15) Sub-Total (Private) 1300 1300 300 300 600 IPP IPP Imp. Coal Imp. Coal Sept. 2015 Sept. 2015 RFP Issued : 04.04.2011 RFP Submission: 02.06.2011 RFP Issued : 04.04.2011 RFP Submission: 02.06.2011 Imp. Coal March, 2015

Total (2015)

1900 2350

Projects Completion by Year 2016


Public Sector
1 Meghnagat 750 MW (3rd Unit) 2 Dhaka North Sub-Total (Public)(Jan.-June/16) Sub-Total ( Public) 750 750 1500 BPDB RPCL Gas Gas March, 2016 March, 2016 Preliminary Works Preliminary Works

1500
1300 1300 PPP (Joint Vent.) / IPP Imp. Coal June, 2016 Feasibility Study will start soon. 3188 Acres Land acquisition under process./ Land dispute

Private Sector
1 Chittagong Sub-Total (Private) (Jan.-June/16) Sub-Total (Private)

Total (2016)

1300 2800

Sl. No Calender Year

Name of the Power Plant

Capacity (MW)

Ownership

Expected Type of Fuel Commissioning Date 2014 (MW) 1270 1053 2323 2015 (MW) 450 1900 2350 2016 (MW) 1500 1300 2800

Remarks

Summary:
2010 (MW) 255 270 250 775 2011 (MW) 851 105 1238 2194 2012 (MW) 838 1319 2157 2013 (MW) 1040 1134 2174
Total (MW)

Public Private Quick Rental Total

6204 7081 1488 14773

Generation Addition in 2011 (Up To March, 11) : 272 MW Public Sector: 6204 MW (Comm: 308, U/C:1741 MW, Tender:1040 MW);(42%) Private Sector: 8569 MW (Comm: 892, U/C:1071 MW, Tender:4006 MW);(58%)
Fiscal Year Public Private Quick Rental Total 2011 (MW) 413 265 1488 2166 1178 3176 2333 2410 3400 2012 (MW) 1106 72 2013 (MW) 865 2311 2014 (MW) 1510 823 2015 (MW) 810 1600 2016 (MW) 1500 1900 2017 (MW)
Total (MW)

6204 6971 1488 14663

Sl. No

Name of the Power Plant Private Sector

Capacity (MW)

Ownership

Expected Type of Fuel Commissioning Date

Remarks

Fenchuganj 3 Years Rental 1 Sponsor: Energy Prima Ltd. Bogra Years Rental Sponsor: Energy Prima Ltd.

50

Rental (BPDB)

Gas

----

U/C: all 8 units are in place. Some problems are created in control system during pre-commissioning testing and delayed of COD. Expected COD Uncertain. U/C: 5 out of 6 units are in place; Control panel, Switch Gear is not still installed. Expected COD Uncertain. PQ & RFP Received on 04.05.2011 & under evaluation. PQ & RFP Received on 04.05.2011 & under evaluation. PQ & RFP Issued : 13.04.2011 PQ & RFP Submission: 30.05.2011 PQ & RFP Issued : 13.04.2011 PQ & RFP Submission: 30.05.2011 PQ & RFP Issued : 21.04.2011 PQ & RFP Submission: 21.06.2011 PQ & RFP Issued : 28.04.2011 PQ & RFP Submission: 28.06.2011

20

Rental (BPDB)

Gas

---December,2012 December,2012 December,2012 December,2012 December,2012 December,2012

3 Bhairab, Kishorgonj 50 MW PP 4 Satkhira 50 MW PP 5 Ghorashal, Narsingdi 100 MW PP 6 Ashugonj 50 MW PP 7 Fenchuganj 100-150 MW CCPP 8 Keranigonj 150 MW D/F PP

50 50 100 50 100 150

IPP IPP IPP IPP IPP IPP

HFO HFO Gas Gas Gas Gas/HFO