Anda di halaman 1dari 4

Presentation

The equipment for superheated water prepare hot water is achieved utilized the primary thermophore the steam eat ones fill to 18 bar, in the reservoirs T001, T002 and the heat exchanger H005 B. Initially is achieved the impletion complete the installation, again reservoirs T001 and T002 up to the adequate levels on functional scheme. The heating of the water from T002 is done recycle through the heat exchanger H 005( A- in operation, B- reserve). Tuning of the temperature of the water is done through the variation of flow primary agent is made through the valve pneumatic of tuning TV 136. For the thing to reduced task he foresaw supplementary against scheme the date a valve pneumatic of tuning DN 40 mounted the in parallel with pneumatic valve TV 136 and a valve pneumatic of shut mounted before tuning valves. The variation of the flow of steam is shall achieved depending on temperature of warm moderate water of the reservoir T002 so that temperature of the water to the level of the aspiration of the pumps of transfuse to is of 1600 C. The pressure in T002 you be maintained to 10 bar through introduction of steam to the part higher part of the reservoir above the level of the water. The flow of steam shall be regulatory with valve pneumatic of tuning PV 133 depending on the pressure from the reservoir T002. Also, supplementary against scheme, for the operation to reduced task he foresaw a valve pneumatic of tuning having DN 20 mounted the parallel with in PV133 and a valve pneumatic of shut mounted before valve of tuning. Circulation of the water in T002 through H005 is done inhaled the fluid to the downside reservoir and fill to the higher part. In inside reservoir below the level of the introduction and above the level of the water have bolt of dispersion. Enter the steam is done so that his minims arrive the in counter-current with the steam will be produced a supplementary heating. From this consideration in the moment which in reservoir is shall touched temperature prescribed the valve pneumatic of shut shall block the inlet of the steam of the interchanger, and agitator pump P009( B) is shall stopped after 30 from the shut feeding with steam. In T002 is connected the circuit of return hot water DN100 named" burglar water recovery". La diminish the temperature in T002 is shall started firstly agitator pump to temperature on 155 0 C measured to base reservoir opened the inlet of the steam in H005. If contiguous his temperature

diminishes up to 1520 C, H005 you enter into in operation. Open the valve pneumatic of shut (changeable steam) be due to is done slow, and the valves of tunings are due to is closed. Obviously, former them which valve shall open the inlet of the steam toward H005 you be one of the reduced diameter, all the same of temperature of the water from reservoir. Open the valve of tuning of big diameter. He can as his temperature breeds from 1550 C to 1600 C without the starting interchanger, just by reason of the direct heating with steam from the higher part of the reservoir. To first operate due to the temperature diminished the water exist the danger as the pressure of the steam in T002 to diminish below 8 bars. Is shall avoid this thing through the decrease of watery flow how is recycle, the agitator pumps P009 be with variable rev. Is shall command the decrease of the rev just if the phenomenon appears when the heat exchanger is in working. The feeding with water reservoir T002 is shall do through transfuse this from the reservoir T004 by dint of the pump P012 (B). Pump P012 is rigged with converter of frequency, the variation of the flow depending on the level of the water from the reservoir T002. Is shall the continuation the of a realization how much times the long maul of the operation of the pumps. Because, in temporally the heating appear the dilatations ale the water, in the moment of the touch of maximum level admissible, this is shall discharge the in the reservoir T004 through the valve pneumatic of close XV130. All this the valve is shall utilized for the heating of the water in T004, this be due to have 900 C with the condition as the you receive the statement of opening just if in T002 temperature is across 1550 C to the level of the aspiration of the pumps. In temporally operation, from T002 is shall secure the feeding reservoir T001 by dint of the pump P002 (B). Pump P002 is with variable rev, the variation of the flow is continuously depending on the level in T001, obviously with protection to minimum level in T002. Also is shall the continuation the of a realization long times of operate the pumps of transfuse. All drafty pumps from reservoirs shall have protection to minimum level. The reservoir T001 is build like his T002 having to the higher part barbecues for the dispersion of this water coming the in counter-current with the steam. To the higher part I have the return of hot plumbing of the feeder circuit from these T002 two circuits is connected also and to the down part reservoir T001, enter to his level to depending on temperature of the water in T001. For these they foresaw two pneumatic tuning TV102A and TV102B depending on temperature of hot water thus: When temperature of the water of the in the aspiration of the pumps P001 is else

little his coequal 1680 C is closed the valve TV102B and is opened TV102A concomitantly, the tuning is the geometrical drawing. When temperature of the water of the in the aspiration of the pumps arrives at 1720 C is shall command the shut of the valve TV102A concomitantly with the opening of the valve TV102B. Through the statement of 2 valves is followed the of a sustentation temperatures of 1700 C in the aspiration of the pumps, the one or two valves working continuously in modulo described previously( the heating of the water is produced when this is entered to the higher part and dispersal in counter-current with the steam). The assurance feeding with hot water of internal fittings is achieved through the pumps of circulation P001. The pumps am with variable rev, the statement be depending on the pressure on jumping-up and make to have a pressures of 28- 32 bars. Because temperature of the water in T001 presents big variations on height incite due to the way of how much heating the stratification, the aspiration is achieved from two levels (the down part reservoir and this half). Each from two aspirations is use valves of tunings commanded depending on temperature of the water of the in common pipeline of aspiration of the pumps, so that his temperature is how much the maul closer to 170 Oc. When exist a tendency of diminish the temperature commanded the opening of the valve TV109A concomitantly with the shut of the valve TV109B and vice, the tuning be contiguous the linear. Is shall displayed and registered the in permanently temperature and the pressure of the water in the pumps aspiration. The watery hot pumps P001 is with system of cooling utilizing water from the chimney coolers. Because in temporally the heating of the water appear the dilatations ale this, to overflow of maximum level admitted, T001 is shall discharge in T002 through pneumatic valves XV104 if the level of the water in T002 permits it and in T004 through pneumatic valves XV112. The feeding with his steam T001 is achieved to the highly part through the valve PV100 commanded depending on the pressure from T001 (16 bar). Supplementary against scheme for the operation to reduced task he foresaw a valve pneumatic of tuning DN25 mounted the parallel with in PV100 and a valve pneumatic of shut mounted before valve of tuning. In the case which in by reason of the heating of the water in T001 is produced a diminution of the a pressure of the steam hereinafter of 15 bar, although one valves of tunings are open complete, maintain the steam pressure of the parameters is shall done through the statement of the valves TV102A B all the same of temperature of the water in T001. In therefore, is shall achieved a double

curl of tuning for the valves TV102A B depending on temperature of the water of the in the aspiration of the pumps but with the condition enforced of the pressure of the steam of the reservoir.

Anda mungkin juga menyukai