16-Jan-12
35 36 39
33
34
REMARKS
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
I
NO
MILESTONES
CONTRACT AWARD
6,7
10,11
12
13
14,15
16
17
18
19
20,21,22
23
24
25.26.27
28,29,30
31,32 33,34
35
36
37
38
39
BASIC DESIGN
DETAIL DESIGN
FOLLOW UP
No 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39
Milestone Description 1M-Issue for Approval - Correspondence & Communication Procedure, Document Numbering Procedure, Review & Approval Procedure (1st Issue) 2M-Issue Inquiry for Soil Investigation 3M-Issue Inquiry for Soil Improvement 4M-Site Preparation Start (Land clearing, stripping, mud/bad soil disposing) 5M-Soil Improvement Work Start 6M-Issue Requisition - Tank 6M-Issue Inquiry - Desalination Package 8M-Issue PO to Vendor - Desalination Package 9M-Issue PO to Vendor - Demineralization Package 10M-Issue PO for Tank 10M-Issue PO to Vendor - Seawater Intake Pump 11M-Complete Soil Improvement Construction - Process Area 14M-Piling Work start - Utility Substation Building 15M-Issue for Construction - Foundation Drawing Control Building 15M-1st Tank Plate Delivery to Site - Tank 16M-Complete Soil Improvement - Offsite Area 17M-Tank Foundation Start 19M-Complete Piling for Sea Water Intake 20M-Complete Piling for Utility Area 24M-Complete Spherical Tank Foundation 24M-Delivery to Site - WWT Package 24M-Delivery to Site - Demineralization Package 25M-Delvery to Site - Seawater Intake Pump 26M-Delivery to Site - Switch Gear 27M-Complete Mechanical Erection - Demineralization Package 27M-Complete Mechanical Erection - WWT Package 27M-Control Building and Utility Substation Building Ready for Instrument & Electrical Panel 29M-Complete Mechanical Erection - Desalination Package 29M-Complete Mechanical Erection - Seawater Intake Pump 29M-Ready to Start-up - WWT Package 30M-Complete Mechanical Erection - Sea Water Intake Package 30M-Ready to Start-up - Demineralization Package 30M-Ready to Start-up - Seawater Intake Pump 30M-Ready to Start-up - WWT Package 31M-Ready for Start-up - Desalination Package 34M-Complete Mechanical Erection - Tank (excluding Hydro Test) 35M-Ready to Feed-in - Tank 36M-Mechanical Completion 39M-Operational Acceptance
Calendar Date Okt/2011 Nop/2011 Des/2011 Jan/2012 Feb/2012 Mar/2012 Mar/2012 Mei/2012 Jun/2012 Jul/2012 Jul/2012 Agust/2012 Nop/2012 Des/2012 Des/2012 Jan/2013 Feb/2013 Apr/2013 Mei/2013 Sep/2013 Sep/2013 Sep/2013 Okt/2013 Nop/2013 Des/2013 Des/2013 Des/2013 Feb/2014 Feb/2014 Feb/2014 Mar/2014 Mar/2014 Mar/2014 Mar/2014 Apr/2014 Jul/2014 Agust/2014 Sep/2014 Des/2014
II III
III.1
Soil Investigation
Mobilization
MOBILIZATION CONTINUE CONSTR. JETTY READY FOR OCCUPANCY ROAD & ACCESS FOR TEMPORARY FACILITY
Construction Jetty
CONSTRUCTION ACCESS
Soil Improvement / Site Preparation OFFSITE AREA Offshore Work Pile Material
PO
DELIVERY
S/C DREDGING
DREDGING
PILING
PILE CAP
DREDGING
Jetty (64)
PILING
PILE CAP
DECK
Jetty (68)
PO FABRICATION 1ST DELIVERY LABORATORY
DREDGING
PILING
PILE CAP
DECK
Piling (PC)
OTHERS FDN
TANK FOUNDATION
EQUIPMENT FOUNDATION
ROOF
PANEL READY
Process Substation
FOUNDATION
GROUND SLAB
ROOF
Utility Substation
FOUNDATION
PANEL READY
FINISHING
PANEL READY
FOUNDATION
FINISHING
WWT Substation
FOUNDATION
FOUNDATION
PANEL READY
FINISHING
FOUNDATION
Laboratory Building
DEMOLISH EXISTING
PILE/FOUNDATION
FINISHING
Fire Shelter
FOUNDATION
FOUNDATION
FOUNDATION
Chemical Storage Shed Propylene & Propylene Vapour Return Metering Shelter Equip. Shelter (WWT Control Building)
FOUNDATION
FOUNDATION
FOUNDATION
FOUNDATION
FOUNDATION
FOUNDATION
PERMANENT ROAD
LOAD TEST
PILING
MAJOR FDN
MINOR FDN
PIPE RACK
Steel Structure
STEEL STRUCTURE
CONSTRUCTION ROAD
PERMANENT ROAD
CONSTRUCTION ROAD
PERMANENT ROAD
16-Jan-12
35 36 39
33
34
REMARKS
Oct
Nov
Dec
Jan
Feb
Mar
PILING
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
III.2
CONTRACT
FDN, PIPE RACK SUPPORT FDN, STRUCTURE & ARCHITECTURAL
31,32
PO INQUIRY FABRICATION
DELIVERY INSTALL
INQUIRY
PO
FABRICATION
DELIVERY
INSTALL
Desalination Package
INQUIRY
PO
FABRICATION
INSTALL DELIVERY
INQUIRY
PO
FABRICATION
DELIVERY
INSTALL
INQUIRY
PO
FABRICATION
DELIVERY
INSTALL
Hypochloride Generator
INQUIRY
PO
FABRICATION
DELIVERY
INSTALL
INQUIRY
PO
FABRICATION
DELIVERY
INSTALL
PO
FABRICATION
DELIVERY
INSTALL
Loading Arm
INQUIRY
PO
FABRICATION
DELIVERY
INSTALL
INQUIRY PO
FABRICATION
DELIVERY
FIELD ERECTION
TEST
Spherical Tank
INQUIRY
PO
FABRICATION
DELIVERY
FIELD ERECTION
TEST
TEST
III.3
PIPING
DELIVERY
Piping
INQUIRY
PO Pipe Material
INQUIRY FABRICATION U/G PIPE A/G
UTILITY COMPLETE
ALL COMPLETE
III.4
ELECTRICAL
DELIVERY
INQUIRY
PO
FABRICATION
INSTALL
DELIVERY
INQUIRY
PO
FABRICATION
INSTALL
AC - DC UPS
INQUIRY
PO
FABRICATION
DELIVERY
INSTALL
INQUIRY
PO
FABRICATION
DELIVERY
INSTALL
FABRICATION
DELIVERY
INSTALL
DELIVERY
Cable Tray
INQUIRY
PO
FABRICATION
INSTALL
Bus Duct
INQUIRY
PO
PO FABRICATION
DELIVERY INSTALL
INSTALL
Telecommunication System
INQUIRY
PO
FABRICATION
DELIVERY
INSTALL
INQUIRY
INQUIRY
PO
PO
FABRICATION
FABRICATION
DELIVERY
INSTALL
INSTALL
INQUIRY
PO
DELIVERY FABRICATION
INSTALL
Temperature Instrument
INQUIRY
PO
FABRICATION
DELIVERY
INSTALL
Flow Instrument
INQUIRY
PO
FABRICATION
DELIVERY
INSTALL
Tank Gauging
INSTALL
FABRICATION
Flow Metering
INQUIRY
PO
DELIVERY
INSTALL
Level Instrument
INQUIRY
INQUIRY
PO
FABRICATION
DELIVERY
INSTALL
INSTALL
Analyzer System
INQUIRY
PO
FABRICATION
DELIVERY
INSTALL
Bulk Material
INSTALL
Junction Box
INQUIRY
PO
FABRICATION
DELIVERY
INSTALL
Cable
INQUIRY
PO
FABRICATION
DELIVERY
INSTALL
Control Valve
INQUIRY
PO
FABRICATION
DELIVERY
INSTALL
INQUIRY
PO
INQUIRY
PO
FABRICATION
DELIVERY
INSTALL
On-Off Valve
INSTALL INQUIRY PO
FABRICATION
DELIVERY
INQUIRY
INQUIRY
PO FABRICATION
DELIVERY
INSTALL
INQUIRY
PO
FABRICATION
DELIVERY
INSTALL
16-Jan-12
35 36 39
33
34
REMARKS
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
III.6
CONTRACT
INQUIRY PO FABRICATION DELIVERY INSTALL
31,32
DELIVERY
INQUIRY
PO
FABRICATION
INSTALL
INQUIRY
PO
FABRICATION
DELIVERY
INSTALL
FABRICATION
INQUIRY
PO
DELIVERY
INSTALL
INQUIRY
PO
FABRICATION
DELIVERY
INSTALL
INQUIRY
INQUIRY
PO
PO
FABRICATION
FABRICATION
DELIVERY
INSTALL
INSTALL
INQUIRY
INQUIRY
PO
PO FABRICATION
FABRICATION
DELIVERY INSTALL
INSTALL
IV
PRECOMM
NO
DESCRIPTION