56 0.88 1.36 0.68 1.07 1.53 0.77 1.21 1.78 0.89 1.42 2.1 1.05 1.7 2.54 1.27 2.1 2.99 1.49 2.46 3.57 1.8 3 4.01 2 3.34
1 1.5 2 3 5 10 20 50 100
Static Initial Secondary Soil description settlement settlement mm mm Loose/M Dense Gravel 30 M Dense Sand/Gravel 2.66 V. Dense Silt Total Settlement = 32.66 Podium Course Gravel Loose / M Dense Gravel Boulder Clay Total Settlement = 4.8 26.4 4 35.2
South
4 3.4 1.4
34.94 34.94
settlement schedule
89.22 75.435
41.31 -6.583
North
89.22 84.625
62.67 38.776
For the underlain layer settlement, use Foundation Pressure & not Net Pressure (no pressure relief)
South