The TREND Master Click to editTeam: subtitle style Joe Pasquarello JC Howard
8/16/12
Presentation Structure
Recommendations Justification Stakeholders and Communications Key Variables and Controls Risk Assessment and Management Quality Assurance methods
8/16/12
Red team proposed TREND: Technology Revitalization and Efficiency at NewwDeal. TREND = Energy costs, Efficiency Achieves savings through
Virtualization Green IT
8/16/12
Average server CPU (firewalls, routers, switches) Network equipment usage only 5-15%
Power consumed converted directly to Source: US EPA report to Congress August 2, 2007 heat Lifetime power & cooling cost more than the machine!
8/16/12
Recommendations
Administrators supporting
Older systems
Slower
8/16/12
Recommendations
Reduce hardware size & complexity Lower power costs and carbon Integrate IT footprint services management
8/16/12
Justification
8/16/12
Lower power consumption Less heat for a/c to remove Less real estate for systems Green initiatives = good Public Relations Project pays for itself almost right away!
Justification
8/16/12
Stakeholder communications requirements. Information to be communicated, including format, content, and level of detail. Who will receive, produce the information. Suggested methods or technologies for conveying the information. Frequency of communication. Escalation procedures for resolving issues. Revision procedures for updating the communications management plan.
8/16/12
Key variables: Cost, Scope, and Schedule Key variable: COST Cost and Scope controlled through Earned Value Management EVM contributes to:
Improving communication and visibility with stakeholders Preventing scope creep Reducing risk Profitability analysis Project forecasting
8/16/12
Schedule Variable
Managed with Microsoft Project Easy to tie back to Earned Value Management Easy to assess actual vs expected progress
8/16/12
8/16/12
Identify wait times, wasted steps Pre-build, pre-test Focus on value to customer (Lean + ITIL)
In Summary
8/16/12
Next Steps
Firm Up Project Plan Assemble TREND Key Leads Project Kickoff Execute to Plan
8/16/12
Credits
Slide 5, Sherlock Holmes image: http://worldoffancydress.com/index.php?main_page=product_info&products_id=54 Slide 7, Green leaf @ sign: http://www.templates.com/ Slide 8, Worried woman: http://www.itsasmartdecision.com/2010/06/changeyourbottomline/
Slide 9, Handshake image http:// www.brighthub.com/office/project-management/articles/15148.aspx?image=74440 Slide 16, Value map: http://www.matthewlai.co.uk/tips_excelvsm.html Slide 17, Bullhorn guy: www.fotolia.com Slide 18, Leaning guy: www.fotolia.com
8/16/12
Slide 4, chart: Report to Congress on Server and Data Center Energy Efficiency by US EPA, August 2, 2007.