Introduction
Established in 1978
Marks and Spencer, Esprit, Armani, DKNY, Ann Taylor, United Colors of Benetton, LEVIS and Debenhams.
set
10. Preparing the cutting ticket in PPC and handing it over to Cutting department
Production
Sampling flow
Proto Tech pack The initial informative sheet which
accessories and then checked on the dress form. Further the quality checker checks the sample, and makes the necessary
changes pertaining to the fit, the drape, the style details etc.
requests and equivalent to the pre production sample except that it is done in all the sizes.
Top of Production (TOP) samples : done on the actual fabric
using the actual trims and the fit has to be perfect. It is simply a
2. Proto sample
2 samples
Starts after 1-2 days, takes 2-3 days for domestic buyers and 5-6 days for foreign buyers
3. Fit sample 1-2 samples