PROJECT
(10.3 MW)
1. CORPORATE DETAILS
: :
Location
Implemented by Promoter Project Cost Source of Financing
:
: : : :
2. COMPANY BACKGROUND
Capital Structure
Authorized Capital
Issued Capital
:
:
3. INVESTMENT ORGANOGRAM
Clean Energy Development Bank
100%
LEDCO
88%
: : :
Feasibility Study of the project has been completed in August 2009. IEE of the project has been approved by Ministry of Energy, GoN on June, 2010; Interconnection for the power evacuation of the project shall be made at 132 kV bus bar of proposed Udipur Sub-station of NEA at Lamjung district, was signed with NEA on October 31, 2011, (14th Kartik, 2068) 5th Extension is done upto April 13,2013 (2069/12/31). PPA of the project with NEA Agreement is in process
5
Power Purchase
Generation License
Applied for generation license (Notice on National Daily Newspaper has been published on 7th Chaitra 2068 for obtaining the GL) Land Purchase for the project is in process. BPC Hydro Consult (P.) Ltd. has been selected as the Detailed Engineering Design consultancy for the project. Detailed Engineering Design is ongoing.
: :
Geo-Physical Investigation
Ongoing
6
5. PROJECT ACCESSIBILITY
Total Road Length From Kathmandu to PH 172 Km
Total Road Length From Narayanghat to PH 103 Km Total Road Length From Sunauli to PH 181 Km
6. HYDROLOGY
Catchment Area Dordi Average Precipitation 100 years Design Flood (HW) 100 years Design Flood (PH) Minimum Monthly flow Dordi Design Discharge Dordi Intake Design Discharge @ Plant Riparian Release Dordi Intake
: : : : : : : :
218.00 sq km 2500 mm/year 490 m3/sec 680 m3/sec 3.11 m3/sec 11.36 m3/sec 11.36 m3/sec 0.311 m3/sec
7. PROJECT COMPONENTS
Headworks
Diversion Structure
Length of Weir Weir Crest Elevation Height of Weir
:
: : :
Intake Type
Size of Opening Crest Elevation of Intake
:
: :
Side Intake
5.0x1.1 - 3 nos El 888.4 msl
8. PROJECT COMPONENTS
Gravel Trap & Desander Gravel Trap
Type
Particle Size to be settled Size of Gravel Trap Spillway Length Bed Slope
:
: : : :
Rectangular
2mm 16.0m 10.5m 1:30
Desander
: : : :
Dufour Double Chamber Continuous Flushing Type 0.02mm 4 Chamber each of 5.75 m; 59 m length 1:40
10
9. PROJECT COMPONENTS
Penstock Pipe Type Length Pipe Material Size of Pipe Power House
: : : :
Surface cum buried 649m High Tensile Steel (IS 2062-B) 2.30m dia, 8-18mm (thickness)
: : : : : :
Surface 21 m x 12.5 m x 11.7 m EL. 774.78 m EL. 770.00 m Rectangular RCC 3.3 m x 2.2m 125 m
11
PH dimension (l x b x h) :
Tail Race
9. PROJECT COMPONENTS
EM Components Turbine Number of Units Type of Turbine Shaft Arrangement Rated discharge for each turbine Rated Net Head Rated Output for each unit Generators No of units Generator Type Excitation Rated Voltage Power Factor Layout Rated Frequency Rated Output
: : : : : :
: : : : : : : :
12
9. PROJECT COMPONENTS
Transmission & Interconnection
: 6 km : Single Circuit Line : 132 kV : NEA 132 kV, Substation at Udipur : 1*12,500 3.3/132kV
13
14
WITH
15
16
Thank You.
17