AC 1 1. 1 1%
EEM # 1 - Lighting Estimated contribution to gross savings 38.26% Proposed improvements are
Replace existing fluorescent tube lights with energy efficient T-5 fluorescent tube lights and electronic ballast Replace GLS lamps with CFL / T-5 FTL with electronic ballast Replace sodium vapour / metal halide street lights with T-5 FTL-based weatherproof street lights
EEM # 2 - Air-conditioning Estimated contribution to gross savings 37.51% Proposed improvements are
Install occupancy sensor above work-table, to ensure that AC operates only when the space is occupied. Integrate a wireless thermostat in the same sensor which helps in controlling the workplace temperature (instead of the regular AC thermostat which measures the return-air path temperature) Have hand-held field programming devices for
EEM # 3 - Canteen Heating Estimated contribution to gross savings 4.21% Proposed improvement is
Replace existing electrical storage geysers with energy-efficient LPG-fired on-line water heaters Cost of additional LPG expense to be borne by the ESCO
EEM # 4 - Winter Heating Estimated contribution to gross savings 18.54% Proposed improvements are
In air-conditioned space, use the occupancy sensor and wireless thermostat to regulate the usage of the heaters within a set temperature range and at the time of occupancy only In non-air-conditioned space, replace existing electrical blowers with more efficient (hence lower capacity) blowers / quartz heaters with rotary operation to ensure proper heat circulation
EEM # 5 - Water Pumping Estimated contribution to gross savings 1.48% Proposed improvement is
Replace one 10 HP water pump each in Shram Shakti Bhavan and Transport Bhavan premises, with efficient submersible pumps All other pumps have been installed after 2002, and hence, need not be replaced now.
A - Actual S - Scheduled
6-Nov 6 6-Nov 6 6 6-Nov 6 6 6 -Dec 6 6-Nov 6 6
6-Aug 6
6-Aug 6
We e k #
6 Receipt of approval from CPW D 6 Obtaining permissions 6 Submittals of plans & specifications 6 Equipment / material acquisition 6 Mobilization 6 Installation at site 6 Clean up 6 Start-up / testing 6 Final inspecition 1 1 Notice of substantial completion 6 6Post-installation submittals 6 6Training
A S A S A S A S A S A S A S A S A S A S A S A S
6 6-Nov 6 6
6-Aug 6
6-Sep 6
6-Sep 6
6 6-Sep 6 6
6 6-Oct 6 6
6 6-Oct 6 6
6 6-Oct 6 6
6 6-Oct 6 6
6 -Aug
6 -Aug
6 6 6 -Nov
6-Jul 6
6 -Sep
6 6 6 -Oct
Activity
Starts