1. Good Examples 2. Bad Examples 3. Solution for Installation 4. Antennas of RFS and Andrew 5. Examples of Antennas Installed 6. Orientation of Antenna
1/6.
MN
ODU
Do not angle the SIDE STRUT pipe more than 25o in any direction for tower installation
25o Zone
25o SIDE STRUT Fixing Zone o ( within 25 ) Far end from mount pole.
The possible running of the antenna by the strong wind is mainly in horizontal direction. There is little possibility of the vertical direction.
2/6.
MN
Inconveniency
1) The antenna leaves far from Tower.
2) The Side strut fixation becomes difficult or impossible to setting within the range. 3) The wind pressure of whole Tower increases. The possibility that Tower moves and leg twist increases. 4) The possibility that the ANT runs becomes high. 5) The damage of the thunderclap increases on ANT and ODU. 6) The work with ODU becomes difficult. 7) The cable and/or the feeder fault come out in the vibration of the antenna. 25o ANT. MOUNTING POLE 25
o
TOWER
3/6.
SOLUTION - 1
The solution to have using the same leg.
It is prominent
TOWER
TOWER
SOLUTION - 2
The solution to have using the another leg. It installs antenna support fittings in the right side of ANT dish.
The cable and/or the feeder fault come out in the vibration of the antenna.
TOWER
4/6.
Side strut
Side strut
5/6.
Mounting bolt hole for Side Strut 1.2m ANT of Phase-1 ( Note: without Side Strut bracket ) 1.2m ANT with Side Strut bracket ( Note: After Phase-1 project )
1) Installation of the ANT Good. It had better lower a little, for fixing side strut on horizontal structure (angle) of the Tower. Side strut 2) Side strut mounting NG Fix at the tower direction in the range of the regulation (25deg).
New Side Strut for P-I 1.2m ANT ? 1) Installation of the ANT . It should install the antenna on the right side of mounting pole. 2) Side strut mounting (Belt type) OK? Installed 03.April.2008, LSK200 - LSKR55 It impossible to mount side strut on the correct place of ANT (left side). Because, are mistaken by the antenna installation. Additional side strut for Phase-I (1.2m ANT) It is the actual type of side strut in these cases. ?
Belt
Side strut
1) Installation of the ANT NG. (Site IKI001) It should be install the antenna on the left side of pole. 2) Side strut mounting NG Install in the correct place of ANT. Fix at the tower direction in the range of the regulation (25deg). In actual condition of ANT is impossible to set side strut on regulation. Because, are mistaken by the antenna installation. 3) Long IF cable without support, it damage connector by vibration.
1) Installation of the ANT NG. (Site IGTR41 Dir IGTR4) It should be install the antenna on the right side of pole. 2) Side strut mounting NG Install in the correct place of ANT. In actual condition of ANT is impossible to set side strut on regulation. Because, are mistaken by the antenna installation.
3) Long IF cable without support, it damage connector by vibration.
Site B
ODU ODU IDU-1
ON
IDU-2
OFF
ODU
ODU
IDU-2
OFF
STEP-2
Turn OFF" the power of IDU No.1 at site B. Verify interference RSL at site A Main. Turn "ON" the power of IDU No.2 at site B. Proceed the orientation of the S/D dish at B. Fix S/D dish at site B. IDU-1
ON
MAIN
Interference
MAIN
ODU
ODU
IDU-1
OFF
S/D
S/D
IDU-2
OFF
ODU
Adjust
ODU
IDU-2
ON
STEP-3 Turn OFF" the power of IDU No.1 at site A. Verify interference RSL at site B S/D. Turn "ON" the power of IDU No.2 at site A. Proceed the orientation of the S/D dish at A. Fix S/D dish at site A. IDU-1
OFF
MAIN
MAIN
ODU
ODU
IDU-1
ON
S/D
IDU-2
ON
ODU
ODU
IDU-2
OFF
STEP-4
MAIN
MAIN Interference
Turn OFF" the power of IDU No.2 at site A. Verify interference RSL at site B Main.
Turn OFF" the power of IDU No.1 at site B. Turn "ON" the power of IDU No.2 at site A. Verify interference RSL at site A S/D Note: By all means, don't adjust S/D to S/D dishes.
ODU
ODU
IDU-1
ON/OFF
S/D
IDU-2
OFF/ON
ODU
Interference
S/D
ODU
IDU-2
OFF