it is a systematic method to evaluate suppliers performance using data from delivery of items in response to the purchase orders placed
Market information Co-operation Credit terms Disposition of rejects Inventory plans Financial position
Techniques used
Categorical plan-personnel from various divisions.. Maintains informal evaluation record.. for each supplier individual list of performance factors.. monthly meeting.. Group evaluation of each major supplier Three categories- preferred, neutral, unsatisfactory
The weighted point plan- four performance factors are considered (qlty,delivery, prices & services).. Weights given to each factor.. Performance numbers are given to each supplier.. Suppliers overall rating =sum total ( wgt of each factor * performance number)
Committee members- chief commercial manager, quality control manager, accounts manager, chief production. engr Meetings held quarterly Categories- A, B, C
Critical incidents method- a record of events & occurrence related to the buyervendor relationship is maintained in each vendors file. Positive & negative aspect of performance is found
Check list system- list based on performance factors is made.. Eg. Reliability technical capabilities aftersale services, availability, buying convenience, sales assistance..
Vertical integration
The degree to which a firms own production system handles the entire supply chain starting from procurement of raw materials to distribution of finished goods. The amount of the production & distribution chain which is brought under the ownership of a firm.
Backward integration- moving towards the sources of raw materials & parts. Forward integration- firm acquires the channel of distribution.
Quality
The sum total of features of a product which influences its ability to satisfy a given demand.
Quality assurance
All those planned or systematic actions necessary to provide adequate confidence that a product or service will satisfy given requirement for quality. Three aspects Incoming raw materials Proper processes Quality of the outgoing finished goods
Qlty certifctns
Prevention of recurrence
Employee involvementt
Technique for process is termed as process control. Technique for raw materials & finished goods is acceptance sampling.
Variations Monitoring the process Specification limits for the output Control limits
Central tendency & dispersions former linked with accuracy & the latter with precision
Acceptance sampling
A statistical technique used to take a decision regarding acceptance or rejection of a lot without having to examine the entire lot. Types Single sampling Double sampling Sequential sampling
Single sampling- two attributes n & c n- number of items in a sample from a lot. c- maximum number of defectives that may be permitted in the sample if the lot is to be accepted. If defects are more than c, the entire lot is rejected or inspected 100%
Double samplingone small sample is drawn initially (n) two acceptance numbers c1 & c2 (c2>c1) c1- no: of defectives if c1 < c1, selected if c1 > c2 , rejected if c1 > c1but < c2 then..
n2 is drawn & inspected (c1+c2)- gives total defectives from n1 & n2 when compared with c2 if c1+ c2 > c2, rejected if c1+ c2 < c2, accepted
Sequential sampling- units are randomly selected from the lot & tested one by one. Based on each testing reject or accept or continuous sampling decision is made.