Monitoring Parameters
Sample Formats
What is MIS ?
MIS stands for Management Information System
Information can be defined as Processed data which can be used for analysis Hence in a nutshell MIS can be defined as A tool that integrates data from all the departments it serves and provides management with the information they require.
Why MIS ?
Availability of accurate and timely information Effective mechanism for decision support
Objective: To keep an eye on the performance of the Franchisee, evaluate increased benefit to Utility and assess customer satisfaction
5
Parameters to be monitored
System
Total length of feeders Maintenance carried out for HT lines (Kms) Total number of transformers % Transformers metered % Transformers failed % Transformers replaced within the stipulated time % Availability of power without Load Shedding Reliability Indices (SAIFI, SAIDI,CAIFI,CAIDI)
Contd.
Consumer Analysis
Pending connection applications at the beginning of the month Applications for new connections received during the month Total connections released during the month Total connection applications rejected during the month Pending connection applications at the end of the month Consumer complaints (Technical & Non-technical) Consumer Complaints resolved as per SoP standards and resolved exceeding SOP standards
Contd.
Revenue
Revenue Billed ( HT +LT) Exclusive of ED & Sales tax Revenue Realized (HT +LT)- Exclusive of ED & Sales tax Arrears Break-up Average realization wrt units sold and input energy Revenue per employee Operating expenditure /unit Operating Profit/Loss
Energy Sent out from feeder panel readings Energy Sent ( Interface Points) Energy Metered ( HT +LT) Total Agricultural sales T & D Loss Collection Efficiency AT & C Loss
Contd.
Distribution losses (Division-wise, Circle-wise and Zone-wise)
Technical losses (%) Commercial Losses excluding realization losses(%) Total Distribution Losses (%) Collection efficiency (%) Overall AT& C Losses(%)
Profitability related
Net profit margin (%) [Net Profit/Total Revenue] Cash Profit (in Rs. Cr. and %) Debt service coverage ratio
Ratio of Metered sales to Discom input Percentage of metered DTRs Percentage of metered 11 KV feeders Percentage of un-metered consumers/ total no. of consumers (consumer category wise)
Contd.
Energy Audit Feeders : Losses up to 30% Above 30% and upto 40% 40% to 50% 50% to 60% Above 60% DT : Losses upto 30% Above 30% and upto 40% 40% to 50% 50% to 60% Above 60% No of defective consumer meters Up to 1 billing cycle More than 1 billing cycle
10
Contd.
No of defective DT meters Up to 1 month More than 1 month Work Done Analysis
Total faulty meters pending for replacement Total zero consumption cases Total locked consumer premises Number of installations checked during the month Total number of theft and malpractice cases detected Investments 11KV, 22KV lines and DTRs
11
Contd.
Additional Parameters
Operating expenditure exclusive of power purchase & interest cost Operating Profit & Loss (Division-wise, Circle-wise, Zone-wise and Company) Investments 11KV,33 KV lines and DTrs
Operational efficiency
Number of customers per employee Energy handled (MU) per employee Revenue handled (Rs Lacs) per employee No. of Ckt-Km/ employee
Network Profile
HT: LT ratio in terms of line-length
12
Monitoring Parameters
Parameters
Collection Efficiency Consumer Complaints No. of complaints Resolved No. of Transformer Failure No. of Transformer Repaired No. of theft cases identified No. of new connection application No. of new connection released Energy Balance Sheet Asset Register
Rationale
Shall provide Performance monitoring Shall provide the response time for complaint redressal and hence the customer satisfaction level Shall provide the state of the system and the response time for transformer repair or replacement Shall provide the level of vigilance in the system and hence the improvement Shall provide the response time for complaint redressal and hence the customer satisfaction level Shall provide Loss Analysis Report and the improvement levels Shall provide the update on the asset of the Utility
Frequency
Monthly Fortnightly Fortnightly Monthly Monthly Monthly Monthly Monthly Monthly Half Yearly
13
Consumer Categories
Domestic & Residential (L&F, Power) Commercial (L&F, Power) Industrial - Small & Medium up to 100 HP Private Tubewell / Pump Sets Light, Fan & Power for institutions Other Categories depending upon specific utility Total
Electricity Duty
I II III IV V VI
14
Sample Formats
PERFORMANCE INDICATORS CONSUMER AVERAGE INTERRUPTION DURATION INDEX - (CAIDI) Month Total duration of system interruptions during the month: Minutes B Total No. of sustained interruptions during the month C CAIDI = B/C CAIDI = SAIDI/ SAIFI D
- (SAIFI)
SAIFI = B/C D
SYSTEM AVERAGE INTERRUPTION DURATION INDEX Month Total duration of system interruptions during the month: Minutes B
15
Contd.
NUMBER OF PENDING CONNECTIONS Division/ Franchise Area Consumer Category Residential Commercial Industrial Remarks
Sl. No.
NUMBER OF PENDING CONSUMER GRIEVANCES Sl. No Division/ Franchise Area Number of Grievances Remarks
DISTRIBUTION LOSSES Sl. No Division/ Franchise Area Monthly Half Yearly Annual Remarks
16
Contd.
NEW CONNECTIONS RELEASED Sl. No Division/ Franchise Area New Connections released During Month Upto First Bill Issued During Month Upto Remarks
COLLECTION EFFICIENCY
Sl. No
Month
Collection % Efficiency
Remarks
17
Contd.
DETAILS OF ACCIDENTS IN FRANCHISE AREA Sl N o Number of fatal accidents DF Employees Durin g mont h Cumulativ e Other Persons Durin g mont h Cumulativ e Animals Durin g mont h Cumulativ e Number of non-fatal accidents DF Employees Durin g mont h Cumulativ e Other Persons Durin g mont h Cumulativ e Animals Durin g mont h Cumulativ e Remark s
Name of Substation
Month
Difference
% loss
Remarks
DETAILS OF FAILURES OF DISTRIBUTION TRANSFORMERS Month 25 50 63 100 160 20 0 Transformers Failed/ Total Number 25 0 315 400 500 630 750 1000 1250 1600 Total Nos. kVA
18
Contd.
COMPLAINTS
Sl. No. 1 2 3 Particulars Number of complaints/ grievances received Number of complaints/ grievances solved Balance complaints/ grievances remaining to be solved During the month Cumulative
19
Thank You