DIJOUX Sandrine / PAYET Emmanuelle / SELAMBAYE Jessica

ORESUND BRIDGE

DIJOUX Sandrine SELAMBAYE Jessica PAYET Emmanuelle

History The bridge The railway and the tunnel Conclusion Webography

Copenhagen 16 kilometers

Malmo

Sweden
Denmark

Oresund Strait

3,510 meter
1
2

4,055 meter Peberholm

7,845 meters
3

17/7/95
Contract tunnel & contract the artificial island

16/7/97
Svanen

9-12/6/2 000 thousands of people who walked, cycled or roller

27/11/95
resundskonsort iet signs a contract

6/1/99
The 20th and final tunnel element is placed in the tunnel trench

29/6/2001 biological environmental demands

1/7/2 004 Oresund Bridge Birthdays

12/6/2 000 80,000 participants/ half marathon

1/7/2 000 The inauguration of the Oresund Bridge

1/4/2002 236,651 vehicles cross the bridge

Suspension bridge

Deck

Main cable

Cables

Cable-stayed bridge, fan design

Cable-stayed bridge, harp design

equal number on both sides

Various point on the tower Parallel system (or harp system)

Total lenght: 7 845 m

Total lenght: 7 845 M

Suspended lenght: 1 092 m

Longest span: 490 m

Total lenght: 7 845 M

Suspended lenght: 1 092 m

Longest span: 490 m

Width: 23.5 m, for 4 lanes of traffic

Total lenght: 7 845 M

Suspended lenght: 1 092 m


Width: 23.5 m

Longest span: 490 m

Pylon height: 203.5 m

Clearance below: 57 m

vibrator

probe concrete frames

pipe driver

skip

trepan

Matriaux utiliss et quantits

Fabrication on-shore and transportation to the bridge line

Main piers: construction insitu

15 meters

20 meters

80 meters 9 500 N

30 meters

80 meters

Bridge deck section

The rail section is double track standard gauge (1435 mm) and capable of high-speeds exceeding 200 km/h.

The island is approximately four kilometres long, and connects the bridge and tunnel of the resund link

10m

38,8m

8,6m

Built:
Structural Type:

1993 - 2000
Immersed tube tunnel Railroad tunnel Road tunnel

Quantities used in construction


concrete volume reinforcing steel

Function / usage:

660 000 m3 20 000 t

length of immersed tube tunnel section number of tunnel units tunnel unit weight

3 510 m 20 57 500 t

Heavy water-proof bulk heads

The precast reinforced concrete units were 8m high, 40m wide and 175m long and they weighed 55,000 metric tons.

Dock

Precast reinforced concrete units

The units floating in the flooded dry dock at Oresund, prior to being towed out.

The units under tow on their way to their final placing.

The precast reinforced concrete units

The unit suspended over the dredged trench with the tugs holding the unit in position, ready for lowering to the sea bed.

www.wikipedia.fr www.technologystudent.com www.howeweb-talktalk.com osb.oeresundsbron.dk bridgepros.com earthobservatory.nasa.gov en.structurae.de