07 Dec,2010
Aesthetics
SCC provides improved surface appearances and aesthetics in finished concrete. Pour lines, bug holes, honeycombs, and other surface imperfections are largely reduced The fluidity of SCC and the elimination of vibration will result in improved aesthetics Selection of form-release agents is important in achieving the desired smooth finish.
Transit mixer
SCC delivered to a job site by concrete truck . Because of the fluidity of SCC mixes the volume of SCC placed into a truck should not exceed the 80% capacity of the drum (ASTM C 94/C 94M).
Monitoring is important to ensure that SCC does not spill out of a concrete truck (rear or front discharge) whenever the truck goes up or down a steep incline.
TOP LEVEL
+ 317.60M
GENERAL DETAIL
NOTES
* DRAWING NOT TO BE SCALED, ONLY WRITTEN DIMENSIONS TO BE FOLLOWED. * FOR STRUCTURAL DETAILS REFER R.C.C. CONSULTANT'S DRAWING. * FOR SIDE MARGIN REFER SANCTIONED LAYOUT. * ANY AMBIGUITIES OR DISCREPANCIES SHOULD BE CLEARED WITH THE ARCHITECT BEFORE PROCEEDING THE WORK. * THE LINING OUT AS SHOWN ON THIS DRAWING TO BE CHECKED ON SITE WITH ARCHITECTS AND CLEARED FOR CONSTRUCTION ONLY AFTER PROPER VERIFICATION OF DIMENSIONS OF OPEN SPACES AT SITE
TOP LEVEL
+317.60M
N
LEVEL + 28 5.50M
LVL 42
+ 27 2.2
LVL 41
+ 26 1.7
28TH LEVEL [41] 3RD SKY VILLA LEVEL 4TH SERVICE LEVEL
LVL 40
+ 25 4.8
LVL 39
+ 24 7.9
LVL 38
+ 23 9.5
3RD SERVICE LEVEL 25TH LEVEL [38] 2ND SKY VILLA LEVEL
LVL 37
+ 22 9.0
2ND SERVICE LEVEL 24TH LEVEL [37] 1ST SKY VILLA LEVEL
Each Sky Villa will have car park, car lift, swimming pool, garden etc.
LEVEL + 285.50M LEVEL +285.5
Sky Villas
Duplex Ht ~10.5m
* S A S
LVL 36
+ 22 2.1
LVL 35
+ 21 5.2
LVL 34
+ 20 8.3
LVL 33
+ 20 1.4
LVL 32
+ 19 4.5
LVL 31
+ 18 7.6
LVL 30
+ 18 0.7
LVL 29
+ 17 3.8
LVL 28
+ 16 6.9
LVL 27
+ 16 0.0
LVL 42 + 272.2
LVL 26
+ 15 3.1
LVL 25
+ 14 8.9
LVL 42
+272.2
LVL 24
+ 14 4.7
LVL 23
+ 14 0.5
LVL 22
+ 13 6.3
LVL 21
+ 12 9.4
LVL 20
+ 12 2.5
LVL 19
+ 11 5.6
LVL 18
+ 10 8.7
LVL 17
+ 10 1.8
LVL 16
+ 94.9
LVL 40 + 254.8
3RD LEVEL [16] SKY APARTMENT 2ND LEVEL [15] SKY APARTMENT 1ST LEVEL [14] SKY APARTMENT
LVL 15
+ 90.7
Apartment Refuge
LVL 14 LVL 13
+ 86.5 + 82.3
LVL 12
+ 78.1
LVL 39 + 247.9
NORTH
LVL 11
+ 69.7
TITLE
PROJECT
LVL 10
+ 52.9
LVL 09
+ 44.5
LVL 38 + 239.5
LVL 08
+ 36.1
[8] PODIUM 7
REVISIONS
LVL 38
Revision Date Description
+239.5
LVL 07
+ 31.9
[7] PODIUM 6
3RD SERVICE LEVEL LEVEL [38] VILLA 2ND SKY VILLA LEVEL 2RD25TH SKY
LVL 06
+ 27.7
[6] PODIUM 5
LVL 05
+ 23.5
[5] PODIUM 4
LVL 04
+ 19.3
[4] PODIUM 3
LVL 03
+ 15.1
[3] PODIUM 2
LVL 02
+ 10.9
[2] PODIUM 1
JOB NO. : DATE : 29 /1 2/07
DRG NO. : 2 03 - EL
DRAWN : SHEFALI
SCALE :
REVISION : R8.0
Raft completed
~
reddibharathi@rediffmail.com