Order Fulfillment
Quality
Plan
Input relevant Changes
Quality
Produce
Ship
Drawing Change
Yes
No
Logistics
Yes
Technical Data
Yes
Demand Employee
Approved
Op 90
No
Clarify volume / price Logistics / Purchasing Logistics / Purchasing no Logistics Shipment P.O. existing? volumes & prices Accurate yes
no
Return to Supplier
Reservoir Production
Reservoir Only No
Yes
Scrap No Remove raw materials needed for Rework from 44PO / 44SO Process Rework Yes Successful? No Material Expensed
Unfinished goods 44 CO
Correct P.O price / volume Receive shipment against P.O / Follow Product Acceptance criteria Logistics /Quality
Band Required
No
Receiving
Yes
Acceptable
Yes
MSDS Available
Environmentally controlled ?
Yes
Bracket Required
Final Inspection
Ship Product to GM with Green dot as per GP-12 requirement and sign off from QA Manager
Material handler verifies correct location of truck. Unloads truck.Obtains paperwork from driver. Counts # of skids and checks load
If qty of skids doesnt match or there is damage to any skid, this is to be marked on freight bill and the Driver is to initial/sign and supervisor is notified
QA inspect?
NO
After truck is unloaded, material handler signs Paperwork and keeps a copy
Material handler puts labels on the skid And moves parts to the assigned location
Op 50
The material handler compares the packing slips To part # on the containers/skids. If necessary Wooden crates are removed and skid is prepared For put away mixed parts are put on separate skid
Yes
Piston, Worm, Housing, Cylinder Cover, Sector Shaft and Drilled Torsion Bar placed in appropriate racks and moved to washer
Product is washed according to appropriate cycle for product type & rack used
Material handler gives all paperwork to the Logistics office or puts in the assigned slot
Op 110 Op 10 & Op 20 Op 105 Verify Torsion Bar/Valve Assy Setup & First Off
Yes Op 100
Logistics Procurement receives paperwork and Enters the receipt for each part into SAP on the MIGO screen
Was h
release to Accounting
Accounting
Accounting Op 270
sign
Op 550
Op 120
Op 125 Hydraulic Drilling Setup & First Off Verification Op 137 Piston Worm Machine Setup & First Off Verification Op 160 Op 150
Op 130 Drilling Hydraulic Centre~019 Op 140 Subassembly Op 140 of Worm Gear and Piston WI~020 Op 400 Final Assembly of Steering Gear No
Conduct Training
Conforming yes
Logistics
NO
Training Effective?
Yes
goods cleared
verify
no
correct manual
Attach lock nut /Pack completed assemblies into shipping container Complete transfer in SAP system and place into designated inventory location
Op 500 Op 525 Receiving Inspection Logistics
Op 700
load truck
Ship
Logistics
yes
End
Op 100
Op 110
change system
Op 120 Op 600
Op 130 Op 550
Yes
Op 140
Yes
Label correct?
Yes No
Send Representation
Assess
Conformin g?
Yes
No
Return Product:
Conforming
Internal Product Nonconformance No Op 600 Supplier Product Nonconformance
Quality
Ship to GM?
Op 300
Ship Product to GM with Green dot as per GP-12 requirement and sign off from QA Manager
NO Environmental Nonconforman ce Yes NO Major Emergency
Level
Yes NO QA Released
Direct Scrap
Suspect Product
Tag
QA Assess
Conforming
Yes
Yes
Effective ?
No Quarantine 44QO Internal Product Nonconformance Issue NCR / Incident Report Return to Supplier Determine Accountability Obtain Supplier RGA# Return to Supplier at Supplier Expense Supplier Product Nonconformance Issue NCR / Incident Report Supplier Nonconforming product Disposition Disposition
No
No Quality
Quality
Effective ? Yes
Certified replacement stock Obtain Supplier Rework Authorization Conduct Rework Conforming Stock
Scrap