No.HRD/PD/002/VII/04 2
Theoretical Parts Demand
No.HRD/PD/002/VII/04 3
Theoretical Parts Demand
No.HRD/PD/002/VII/04 4
Tabel konversi (wheel type)
Loader (Wheel) Graders (Wheel)
No.HRD/PD/002/VII/04 5
Perkiraan populasi
unit awal Theoretical Parts
Demand (TPD)
D65A Conversion
Kalkulasi unit table Distributor?
Anticipated sales
amount
Perkiraan populasi
unit awal
No.HRD/PD/002/VII/04 6
Rata Rata Jam Konversi Tabel Terhadap D65A
Populasi Unit Operasi dalam satu Model Faktor Model Faktor
tahun D21 0.24 GD31, 500 0.57
1 D50A = 100 unit 1800 jam D31 0.37 GD37, 600 0.66
2 D155A = 160 unit 2500 jam D40, 45 0.54 GD40, 650 0.94
3 D455A = 17 unit 2700 jam D50, 53, 57 0.75 HD180 1.00
4 GD37R = 100 unit 1700 jam D60, 65 1.00 HD200 1.25
5 HD180 = 73 unit 1900 jam D75 1.18 HD320 2.02
Total = 450 10600 jam D80, 85 1.27 HD680 3.75
D95 1.65 W70 0.60
D150, 155 1.91 W90 0.84
Unit Jumlah FK Jumlah D355 2.84 W120 1.10
1 D50 100 X 0.75 = 75 D455 6.38 W170 1.35
2 D155 160 X 1.91 = 305.6 WA16 2.28
3 D455 17 X 6.38 = 108.46 WS23S 2.97
4 GD37R 100 X 0.66 = 66
5 HD180 73 X 1.00 = 73
Total = 628.06
No.HRD/PD/002/VII/04 7
jam rata − rata pertahun
TPD = jumlah unit hasil konversi x h arg a dari seri D65 A (US $) x Faktor pengali ( K ) x
200 jam
harga Jam
D65A Operasi Jumlah (US$)
Unit Jumlah x (US$) x K x per 2000 =
1 1800
D50 = 75 x 78,000 x 0.07 x = 368,550
2000
2 2500
D155A = 305.6 x 78,000 x 0.07 x = 2,085,720
2000
3 2700
D455 = 108.46 x 78,000 x 0.07 x = 799,459
2000
4 1700
GD37R = 66 x 78,000 x 0.04 x = 175,032
2000
5 1900
HD180 = 73 x 78,000 x 0.04 x = 216,372
2000
Total TDP = 3,645,133
No.HRD/PD/002/VII/04 8
Anticipated sales amount
Jml person = US$ 2.551.586 x (1/US$ 78.000 x 3,8)
- Customer = TPD x 1,0
= 9 orang
= US$3.645.133
Distribusi dari 9 orang tersebut
- Distributor = TPD x 0,7
1 (satu) orang ; Parts Manager
= US$ 2.551.593
1 (satu) orang ; Ass manager merangkap fungsi
import work accounts & ordering
Anticipated stock amount 1 (satu) orang ; Outside sales
- Customer = 4 bulan 1 (satu) orang ; Counter sales, merangkap cardex
4/12 x US$ 3.645.113 = US$ 1.215.004 records
1 (satu) orang ; General Affairs merangkap secretary
- Distributor = 6 bulan 1 (satu) orang ; Ass Manager (store) merangkap
6/12 x US$ 2.551.593 = US$ 1.275.797 receiving Inspection
3 (tiga) orang ; Stock tacking merangkap picking &
shipping
1
Jumlahpersonel = Anticipated sales amount (distributor ) x
h arg a D 65 Ax3,8
No.HRD/PD/002/VII/04 9
No.HRD/PD/002/VII/04 10
Tata Letak Gudang
Storage area Large Parts Storage Floor storage area Outdor parts
Area Penyimpanan Area penyimpanan Area penyimpanan storage area
suku cadang kecil suku cadang besar dilantai
No.HRD/PD/002/VII/04 11
Jenis Denah Gudang
C C C C C C C C
S S S S S C C C
L L L L S C C C
No.HRD/PD/002/VII/04 12
Pembagian Lantai Gudang
Small part
Large part
Storage Area
Floor
Out-door
Receiving, Inspection area
Packing, Shipping area
Work. Area Packing material
Equipment
Out-door work area
Parts Warehouse
Customer area
Office Area
Part office area
Other facility
Aux. Floor Area
Main Aisle
No.HRD/PD/002/VII/04 13
Pembagian Lantai Gudang
Main Aisle
Storage
Area Storage
Area
Outdoor Large
Storage Large Parts
area
Parts
Storage Storage
(pallet (Pallet
rack) Area Rack) Area
No.HRD/PD/002/VII/04 14
Storage Area
1 1
Luas storage area = Stock amount ( Distributor ) x 2 Luas storage area = US $ 1.275.797 x = 1.063m 2
bea sewa gedung / m / tahun US $1.200 / m 2
Catatan :
Misal harga sewa gudang = US$ 1.200 / m2
2 2 2
STORAGE AREA S/D 1000m 1000 - 3000 m 3000-… m
- Small Storage 50% 40% 30%
- Large Storage 30% 30% 30%
- Floor Storage 15% 20% 25%
- Outdoor Storage 5% 10% 15%
Jumlah 100% 100% 100%
Karena luasnya 1.063m2 maka yang dipakai:
No.HRD/PD/002/VII/04 15
Work Area
J 25
Work area = Stock amount ( Distributor ) x Work area = US $ 1.275.797 x = 108m 2
h arg a D65 A x3,8 US $7.800 x3,8
Catatan: Catatan :
J = Luas standar Karena pada contoh ini jumlah personil nya 9, maka
Nilai J yang dipakai 23 – 25 m2
Jumlah Personel Batasan dengan bagian lain Tidak berbatasan dengan bagian lain
2 2
1 - 8 orang 17 - 22m / orang 30 - 35 m / orang
2 2
9 - 27 orang 17m / orang 17 m / orang
2 2
> 27 orang 8,5m / orang 8,5 m / orang
Untuk 9 orang crew parts sesuai contoh sebelumnya, maka dari tabel diatas didapatkan
- Jika berbatasan dengan bagian lain => 9 x 17m2 = 153m2
- tidak berbatasan dengan bagian lain => 9 x 17m2 = 153m2
Luas Auxiliary floor space menggunakan pendekatan Luas Main aisle menggunakan pendekatan 15% ~ 20%
15% ~ 20% dari total area storage dari total Indoor area dikurang outdoor area
No.HRD/PD/002/VII/04 17
FASILITAS GUDANG
PENGERTIAN LANTAI
Fasilitas gudang adalah alat bantu yang • UT sebagai distributor alat berat
terdapat warehouse yang akan membantu mempunyai standart kapasitas lantai yang
dalam proses pekerjaan dan juga diizinkan oleh KOMATSU, yaitu 5 ton/m2
penyimpanan barang sehingga menjadi • Struktur lantai dapat dilihat pada contoh
efektif dan efisien dengan menggunakan dibawah ini:
investasi yag paling wajar.
Bahan penguat Approx. 150mm
TUJUAN
Fasilitas gudang secara umum harus Tanah liat Approx. 150mm
mempertimbangkan antara lain:
Lokasi, kondisi cuaca dan lingkungan
setempat serta sifat dan ramalan dari pasar
Fasilitas gudang juga harus membuat suku
cadang menjadi tetap dalam keadaan baik Lapisan pasir Approx. 1000mm
dengan memperhatikan sistem ventilasi,
sistem pengaman kebakaran, dan sistem
pengaman
No.HRD/PD/002/VII/04 18
SIstem Ventilasi
Vent tube/fan
1,8m
penyedot debu
No.HRD/PD/002/VII/04 19
Sistem Penerangan & Pengaturan Kebisingan Suara
No.HRD/PD/002/VII/04 20
Parts Dock
Delivery
Truck
Dock
Leveller
No.HRD/PD/002/VII/04 21
Rack Shelves
No.HRD/PD/002/VII/04 22
Model Rack Shelves
No.HRD/PD/002/VII/04 23
Model Rack Shelves
No.HRD/PD/002/VII/04 24
Istilah & Ukuran Pada Rack Shelves
No.HRD/PD/002/VII/04 25
Kotak Plastik
No.HRD/PD/002/VII/04 26
Doos Karton
LOCATION
PARTS NUMBER DESCRIPTION
CAT : PRODUCT :
No.HRD/PD/002/VII/04 27