Anda di halaman 1dari 47

Contoh Proyek

Program S1Teknik Sipil ITS


2012

Christiono Utomo

Klasifikasi Real Properti


Residensial Property Komersial Real Estate : Office Property Retail Property Industrial Property Special-Purpose Property

Klasifikasi Real Properti

Residensial Property

Single family homes : 1. Rumah tunggal 2. Town houses Multy family residence :
(highrise+midrise buildings)

1. Rumah susun 2. Apartemen 3. Condominium

Klasifikasi Real Properti

Office Property

Single occupancy
(owner/bukan)

1. Institusional 2. Single tenant Multiple occupancy 1. Institusional 2. Multiple use 3. Single use

Klasifikasi Real Properti

Retail Property

Freestanding building (dimiliki dan dikelola pemilik) kios, toko, dsb Tradisional Centre 1. Pasar 2. Ruko 3. Pusat pertokoan, Mall dsb Specialized centers factory outlet, pertokoan khusus

Klasifikasi Real Properti

Industrial Property

Seluruh tanah, dan fasilitas untuk pabrik,penyimpanan dan distribusi


1.
2. 3.

Heavy manufacturing Light manufacturing manufacturing Storage, warehouse

Klasifikasi Real Properti

Special Purpose Property

Hotel Motel Klub Resort Mobile home parks Bioskop Sekolahan Kantor pemerintah

Pasar Tanah Abang Jakarta

SuperMall Pakuwon

THR Plaza : HighTech Centre

Pusat Grosir Wonokromo

Burj Dubai Sky scraper under construction in Dubai, UAE Construction starts 21 September 2004. Expected completion - 2008 Height - 705 m, expected to be worlds tallest building (Taipei 101 509 m) Center of a large-scale, mixed-use development (includes commercial, residential, shopping, entertainment, and leisure outlets). The complete development cost US$ 8 billion

BIRD NEST

330m length x 220m width x 69.2m tall Built with 36km of unwrapped steel Weight of 45 000 tonnes Main body composed of 24 columns of trusses, which surround the bowl-shaped stands in the stadium.
Architect:
Herzog & de Meuron ArupSport China Architecture Design & Research Group

Artistic consultant:
Ai Wei Wei

Lead structural engineer:


Martin Simpson, based in Arup's Manchester

Operation & Construction Management

Before groundbreaking,

Pile Foundation Construction, April 2004

December 2003

The first tier structure construction scene

Zero floor construction, May 9, 2005 Operation & Construction Management

Second floor construction,


September 14, 2005

Fourth floor construction, October 21, 2005

Installing of elevated joists

Concrete Structures

Operation & Construction Managementproject completion and trestles, February 22, 2006

Work on joists and trestles completed, July 21, 2006

Construction Completed

Operation & Construction Management

PHOTOS
A bird's eye view

A night shot
Operation & Construction Management

PHOTOS
The exterior

Seating bowl
Operation & Construction Management

PHOTOS
The lobby

The shopping center in the stadium


Operation & Construction Management

PHOTOS
Entrance to the shopping center

The green area


Operation & Construction Management

HANGZHOU BAY BRIDGE

The S-shaped Hangzhou Bay Bridge, is a cable- stayed design. Act as an important connection in Chinas East Coast Superhighway. Span: 36km long, longest ocean-crossing bridge in the world. Spanning across the Hangzhou Bay on the East China Sea and crossing the Qiantang River at the Yangtze River Delta.

The Stormwater Management and Road Tunnel / SMART Tunnel


Stormwater tunnel: Construction cost: RM1,887 million (US$514.6 million) Stormwater tunnel length: 9.7 km (6.0 mi) Diameter: 13.2 m (43.3 ft) (outer diameter) Tunnelling method: Tunnel Boring Machine (TBM) TBM type: Slurry shield

Loose Soil

MEGA-STRUCTURE PROJECT
KANSAI AIRPORT, OSAKA (JAPAN)

Kansai Airport, Japan

39

2.4 Construction Stages

Kansai Airport, Japan

40

3. Construction Details
Construction Construction period Kansai International Airport Terminal April 1991 to June 1994

Airport expansion period


Location Client Sponsor (for expansion project) Financing Estimated investment

1999 to 2007
Bay of Osaka, Osaka, Japan Kansai International Airport Co. Ltd. Kansai International Airport Government $15 billion

Kansai Airport, Japan

41

Architectures

Renzo Piano Tom Barker Phillip Dilley Alistair Guthrie Noriaki Okabe Peter Rice Jean
Specially designated joint venture groups which consist of: Toyo-Daio-Maeda-Mitsui-RinkaiAsakawa. Goyo-Tetra-Konoike-Sato-NihonkaikoDaishin. Mistui-Ohmoto-Hazama-NihonkaikoYoshida. Toa-Shimizu-Kokudosogo-Takenaka. Doboku-Rinkai-Kabuki. Taisei-Toyo-Wakachiku-TobishimaTaiho.
Kansai Airport, Japan
42

Main contractor

Co-contractors

Ove Arup & Partners Eiffel Construction Metallique Kawasaki Heavy Industries Nikken Sekkei Obayashi Corp.
Watson Steel Ltd Fluor corporation (for expansion Kansai International Airport Company (KIAC)

Steel construction Project management Project management project)

Kansai Airport, Japan

43

4. Pictures

Kansai Airport, Japan

44

4. Pictures

Kansai Airport, Japan

45

4. Pictures

Kansai Airport, Japan

46

4. Pictures

Kansai Airport, Japan

47

Anda mungkin juga menyukai