Contents
Product Overview
Project Applications
Product Overview
02 05 16
midas
Civil
midas Civil
Application Areas
Overview
Cable stayed bridge & Extra-dosed bridge Staged segmental post-tensioned bridge Curved steel plate and composite girder bridge Conventional bridge (Skewed slab, Frame & Culvert) Suspension bridge
Integral bridge Subway structure Tunnel structures Sewage treatment plant Heat of hydration for mass concrete
Advanced Technology
02 05 16
midas
Civil
midas Civil
Structural Engineer General Purpose Special Purpose Bridge Plant Underground Structure Tunnel Dam Building Geotechnical Engineer
midas Civil
midas Civil
midas Civil
midas Civil
300 m
Var.
300 m
midas Civil
Nonlinear point spring support to represent the stiffness of the backfill and soil
Dynamic Analysis
General Link for Soil-Structure interaction (6x6 stiffness, mass, and damping matrix)
midas Civil
Section DB
Steel Section DB
Response Spectrum Function
Load
Prestress losses Moving Load Load Combination Concrete Frame Design (ULS & SLS) Steel Frame Design (ULS & SLS)
Design Steel Composite Girder Design PSC Box Girder Design Irregular Section Check (GSD module)
midas Civil
midas Civil
Can Wind-Induced Vibration of long-span bridge be simulated in midas Civil? For detail analysis such as CFD, fatigue, and cracking
CFD
Fatigue Analysis
Cracking Analysis
midas Civil
Offline Training Regular training Company visit & training Customized training Task Pane
Works Tree
Online Training
midas Civil
Project Applications
02 05 16
midas
Civil
17
Project Applications
midas
Civil
18
Project Applications
Ironton-Russell Bridge
Overall bridge length 1,900 ft
Main span
Tower height
950 ft
519 ft Crossing the Ohio River between Ironton and Russell, USA Roadway Bridge Michael Baker, Jr., Inc. $110 Million Truss (Cable): 70 Beam: 2088 Shell: 2730
Location
Function/usage Designer Cost of construction Number of elements and element types used
Type of analysis
Construction Stage Analysis with Time-Dependent Effects Unknown Load Factor Analysis Eigenvalue Analysis Thermal Analysis Vehicle Load Optimization
midas
Civil
19
Project Applications
Weirton-Steubenville Bridge
1,965 ft 820 ft 365 ft Crossing the Ohio River between Weirton (West Virginia) and Steubenville (Ohio) Roadway Bridge
Contractor
Designer Consultant Year of completion Cost of construction Number of elements and element types used
Type of analysis
midas
Civil
20
Project Applications
La Jabalina Bridge
Overall bridge length Location Function/usage Designer Number of elements and element types used
Type of analysis
Construction Stage Analysis with Time-Dependent Effects Response Spectrum Analysis Eigen Value Analysis Vehicle Load Optimization
midas
Civil
21
Project Applications
El Marquz Bridge
Overall bridge length Location Function/usage Designer Number of elements and element types used
Beam: 2224
Type of analysis
midas
Civil
22
Project Applications
Tarango Bridge
Overall bridge length Location Function/usage Designer Number of elements and element types used
206 m Mexico City Roadway Bridge Carlos Fernandez Casado S de RL Truss (Cable): 176 Beam: 1653
Type of analysis
Construction Stage Analysis with Time-Dependent Effects Response Spectrum Analysis Eigen Value Analysis Vehicle Load Optimization
midas
Civil
23
Project Applications
Overall bridge length Location Function/usage Designer Number of elements and element types used
370 m Cali, Colombia Roadway Bridge Gregorio Renteria Beam: 153 Tendon Profile: 140
Type of analysis
Construction Stage Analysis with Time-Dependent Effects Response Spectrum Analysis Eigen Value Analysis Vehicle Load Optimization
midas
Civil
24
Project Applications
1,520 m
Main span
Tower height Location Function/usage Consultant
600 m
150 m Antwerp, Belgium Roadway Bridge IC+E, TUDelft
Solid: 7930 (concrete deck) Shell: 7733 (crossbeams web) Beam: 20151 (crossbeams flange, trusss top and bottom chord and diagonal) Truss: 128 (Stay cables)
Type of analysis
FE model by
midas
N. Lfgren
25
Civil
Project Applications
400 m 200 m 75 m (60 m above the deck) Railway Bridge Movares Nederland BV
type of analysis
FE model by
A. Steenbrink
midas
Civil
26
Project Applications
Overall bridge length Main span Tower height Location Function/usage Designer Consultant Year of completion Cost of construction Number of elements and element types used
620 m 310 m 128 m Saint-Petersburg, Russia Roadway Bridge Institute Strojproject Freyssinet International Under design $ 20 Million Truss (Cable): 104 Beam: 4063 Shell: 2288 Static Analysis Vehicle Load Optimization Eigenvalue Analysis
Type of analysis
midas
Civil
27
Project Applications
Lazarevsky Bridge
Function/usage Contractor
Designer Year of completion Cost of construction Number of elements and element types used
Type of analysis
midas
Civil
28
Project Applications
Overall bridge length Main span Location Function/usage Designer Number of elements and element types used
1478.5 m 125 m Bucharest, Romania Roadway / Tramway Bridge C&T Enginreering Srl Beam: 3073 Plate: 549
Type of analysis
Nonlinear dynamic time history analysis with Lead Rubber Bearing Isolators (LRB) and Viscous Dampers
midas
Civil
29
Project Applications
Sernyi Bridge
Overall bridge length Main span Tower height Location Function/usage Designer Year of completion Cost of construction Number of elements and element types used
248 m 144 m 66 m and 48 m Saint-Petersburg , Russia Roadway Bridge Institute Strojproject Under design $ 50 Million Truss (Cable): 40 Beam: 1633 Shell: 926 Static Analysis Vehicle Load Optimization
Type of analysis
midas
Civil
30
Project Applications
Overall bridge length Location Function/usage Designer Number of elements and element types used
189 m HaNoi, Vietnam Roadway Bridge VINACONEX, CIPHanoi Truss (Cable): 16 Beam: 308
Type of analysis
Construction Stage Analysis with Time-Dependent Effects Response Spectrum Analysis Eigen Value Analysis Vehicle Load Optimization
midas
Civil
31
Project Applications
Overall bridge length Location Function/usage Designer Number of elements and element types used
654 m Da Nang, Vietnam Roadway Bridge Tecco533, CIPHanoi Truss (Cable): 266 Beam: 82
Type of analysis
Response Spectrum Analysis Eigen Value Analysis Large Displacement Analysis Vehicle Load Optimization
midas
Civil
32
Project Applications
Overall bridge length Location Function/usage Designer Year of completion Cost of construction Number of elements and element types used
2559 m Seoul, South Korea Roadway Bridge Sam An Engineering 2000 $ 0.2 Billion
Beam: 2603
Type of analysis
midas
Civil
33
Project Applications
Overall bridge length Location Function/usage Designer Number of elements and element types used
795 m Chung Ju, South Korea Roadway Bridge Chung Suk Engineering Truss (Cable): 144 Beam: 644
Type of analysis
Construction Stage Analysis with Time-Dependent Effects Cable Tension Optimization Geometric Nonlinear Analysis Vehicle Load Optimization
midas
Civil
34
Project Applications
Overall bridge length Tower height Location Function/usage Designer Year of completion Cost of construction Number of elements and element types used
4420 m 107 m Incheon, South Korea Roadway / Railway Bridge U Sin Corporation 2000 $ 0.9 Billion Truss (Cable): 162 Beam: 1930
Type of analysis
Response Spectrum Analysis Eigen Value Analysis Large Displacement Analysis Vehicle Load Optimization
midas
Civil
35
Project Applications
Overall bridge length Main span Tower height Location Function/usage Designer Year of completion Cost of construction Number of elements and element types used
1480 m 800 m 230 m Incheon, South Korea Roadway Bridge Seoyeong Engineering and Chodai Co., Ltd 2009 $ 2.4 Billion Truss (Cable): 176 Beam: 1653
Type of analysis
Construction Stage Analysis with Time-Dependent Effects Cable Tension Optimization Geometric Nonlinear Analysis Vehicle Load Optimization
midas
Civil
36
Project Applications
1600 m 1018 m 295 m Between Tsing Yi and Kowloon City, Hong Kong, China Roadway Bridge
Location
Function/usage
Designer
Cost of construction Number of elements and element types used
Type of analysis
midas
Civil
Project Applications
8206 m 1088 m 306 m Crossing Yangtze River in China between Nantong and Changshu Roadway Bridge Jiangsu Province Communications Planning and Design Institute $750 Million Truss (Cable): 272 Beam: 760
Location
Function/usage
Designer
Cost of construction Number of elements and element types used
Type of analysis
Construction Stage Analysis with Time-Dependent Effects Cable Tension Optimization Geometric Nonlinear Analysis Eigenvalue Analysis Thermal Analysis Buckling Analysis
midas
Civil
38