Introduction
Introduction
Final phase in STLC. Ensures that all the testing activities are performed in adherence to the Test Plan. Decides whether the project can be moved into the production phase or not. (means Go/No Go Decision)
Introduction
Introduction
Introduction
2.
3.
2. Test Results a) Metrics Generated i. Test Management Metrics. (Total no of Bug Fixes, Total No of Enhancements, No of Bugs/Enhancements covered in Test Cases, Test case Design Productivity, Test Execution Productivity, Requirement Stability index) ii. Test Coverage Metrics. (Total test cases-Functional and Regression test cases, Test case in Scope, Total Test case Passed, Total Test Case Failed, Total no of Test case Non-executed, Total Executed Test Cases, Test Coverage (At the End of the Sprints) , Pass percentage (At the End of the Sprints) iii. Defect Metrics. (Defect Status and Severity, Defect Trend)
2. b) Assessment of Quality. (Acceptable, Quality IndexSystem Stability) 3. Test deliverables Test Cases designed as part of bugs/enhancements Test Log/Test Summary Results Requirement Traceability Matrix a) Known Issues b) Recommendation
Introduction