08-09
09-10
10-11
11-12
12-13
Best
Achieved
08-09
09-10
10-11
11-12
TF/100O HRS
12-13
Best
Achieved
08-09
09-10
10-11
11-12
12-13
SSTPS
21
29
15
26
21
1.13
1.86
2.72
1.60
1.67
1.83
0.20
0.45
0.62
0.31
0.62
0.57
KSTPS
14
12
16
14
0.41
0.93
0.93
1.46
1.10
0.39
0.10
0.34
0.29
0.40
0.36
0.33
RSTPS
14
12
10
13
14
0.73
1.09
1.02
0.67
1.35
1.36
0.14
0.30
0.25
0.21
0.25
0.27
FSTPS
12
11
11
10
1.09
1.26
1.51
0.87
1.73
1.19
0.28
0.37
0.35
0.22
0.29
0.35
RhSTPS
12
14
12
11
17
0.40
1.73
2.81
1.81
1.23
2.89
0.13
0.58
0.67
0.61
0.54
0.53
TSTPP
10
23
27
31
11
1.16
1.08
2.09
2.61
2.66
1.14
0.28
0.25
0.55
0.67
0.86
0.81
NCTPS
11
0.59
0.60
0.22
1.04
1.20
0.65
0.14
0.28
0.11
0.24
0.30
0.27
KhSTPS
10
16
13
17
0.65
1.29
0.59
2.04
0.66
1.11
0.19
0.32
0.20
0.36
0.35
0.31
FGUTPP
14
11
0.29
1.41
0.55
1.87
0.42
0.51
0.07
0.42
0.15
0.31
0.10
0.09
VSTPP
16
26
28
20
22
22
0.92
1.34
1.45
1.06
1.24
0.89
0.30
0.39
0.41
0.29
0.34
0.33
SMTPS
0.42
0.69
1.54
1.43
0.62
2.22
0.15
0.14
0.36
0.22
0.20
0.17
SIPAT
21
2.26
0.00
0.97
1.85
1.66
3.12
0.41
0.00
0.22
0.51
0.35
0.30
TnTPS
12
15
10
0.68
1.19
1.14
0.64
1.09
0.84
0.25
0.47
0.55
0.34
0.44
0.39
TTPS
10
15
28
19
18
14
0.73
1.15
2.32
1.39
1.21
0.78
0.30
0.37
0.70
0.47
0.48
0.45
BTPS
15
37
13
13
0.20
1.18
2.02
4.33
1.12
1.30
0.07
0.27
0.46
1.22
0.39
0.41
12
0.03
3.87
0.54
0.39
660 MW
500 MW
79
97
102
104
96
1.19
1.81
1.88
1.56
1.51
0.47
0.55
0.58
0.63
0.60
200/210 MW
<200 MW
71
66
84
0.96
1.2
0.32
1.16
1.49
1.00
0.77
0.84
0.27
32
0.92
1.11
0.37
47
57
28
1.15
36
63
36
0.26
0.54
0.37
0.25
0.45
0.24
0.42
NTPC
179
210
218
204
193
1.24
1.52
1.59
1.36
1.42
0.41
0.42
0.41
0.39
No of TF per Unit
2.32
2.47
2.56
2.4
2.14
0.36
2011-12
2011-12 TF
till Jan12
NTPC
2012-13
TF till
Jan13
TF after OH
in 2012
60
Total no. of TF
263
239
204
193
TF/1000 hrs
159
1.33
1.36
1.42
Loss of Av.
0.42
0.38
0.39
0.36
VINDHYACHAL
25
30
22
22
SINGRAULI
25
31
26
21
SIPAT
21
RIHAND
13
12
11
17
KAHALGAON
19
16
13
17
RAMAGUNDAM
12
14
13
14
TALCHER TH
25
21
18
14
2011-12
2011-12 TF
till Jan12
2012-13
TF till
Jan13
TF after OH
in 2012
BADARPUR
40
13
13
13
TALCHER - K
34
36
31
11
FARAKKA
11
11
10
SIMHADRI
TANDA
17
10
DADRI TH
11
11
11
KORBA
21
15
14
UNCHAHAR
12
(LOCATIONS)
Total TF: 193
Hanger tube, 1,
1%
Steam cooled
wall, 13, 7%
Superheater,
38, 20%
Reheater, 41,
21%
Drain / Vent, 1,
1%
BB Tube, 1, 1%
Water wall, 57,
29%
Economiser,
41, 20%
(MECHANISMS)
Total TF: 193
Longitudinal
Crack, 8, 4%
Overheating, 7,
Fatigue, 5, 3%
4%
Maintenance
damage, 2, 1%
Corrosion, 9, 5%
Attachment weld,
14, 7%
Short term
overheating, 21,
11%
Chemistry related, 8,
4%
Incomplete w ork, 7,
4%
Others, 17, 9%
Poor w orkmanship,
86, 44%
Operation related,
18, 9%
Inadequate
inspection, 23, 12%
Erection /
Manufacturing /
Design defect , 34,
18%
Diversion of FG due
to foreign material,
3, 3%
Total TF: 86
Damaged
Non restoration of
refractory, 3, 3% guide vanes, 3, 3%
Fin undercut, 2, 2%
Missing fin, 4, 5%
Dislocation of
shield, 6, 7%
Damaged shield /
cassette baffle, 8,
9%
Partial blockage, 9,
10%
Non restoration of
support/cleat/conne
ctors, 9, 11%
Misalignment, 14,
17%
Location of
failure
84.5 t/h
84.5 t/h
84.2 t/h
CRH steam
256.5oC
RH
De-superheater
DSH O/L
HRH O/L
Reheater
254.0oC
254.4oC
255.9oC
253.9oC
253.8oC
255.7oC
253.7oC
253.1oC
254.7oC
253.5oC
253.3oC
Time
Coal flow
MS press
SH spray
Mill-A
current
Mill-B
current
13:48
104.0
116.6
150.1
136.2
136.3
13:49
104.6
116.7
150.0
131.7
135.3
13:50
105.2
116.9
150.1
133.8
133.3
13:51
105.8
115.5
150.1
136.0
131.7
0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.6
108.3
107.8
107.4
106.9
106.5
106.0
105.5
105.1
104.6
104.2
104.0
104.6
105.2
105.8
106.4
107.0
107.6
108.1
108.7
109.3
109.9
110.5
111.1
115.5
115.6
115.7
115.8
116.0
116.1
116.2
116.3
116.4
116.5
116.6
116.7
116.9
115.5
113.8
112.1
110.4
108.6
106.9
105.2
103.5
101.8
100.4
150.0
150.1
150.0
150.1
150.1
150.0
150.0
150.0
150.1
150.0
150.1
150.0
150.1
150.1
150.0
150.0
150.0
149.1
138.2
138.4
139.5
108.6
107.0
SH
HPBP CRH
OUTLET D/S
STEAM
TEMP-L Templ- PRESS
L
325.6
325.6
325.7
325.8
325.8
325.9
325.9
326.0
326.0
326.1
326.1
326.2
326.2
326.3
326.3
326.4
326.5
326.5
329.1
338.1
347.1
353.3
358.8
259.8
255.8
256.1
253.0
253.0
253.0
253.2
252.2
252.0
253.0
253.0
253.0
252.0
251.8
252.8
252.2
250.1
251.7
252.0
256.2
264.0
273.6
280.6
38.5
41.7
40.9
40.4
40.7
41.0
40.6
40.4
40.4
40.5
40.5
40.5
40.1
40.1
40.9
39.8
39.6
39.8
39.8
39.4
39.4
39.9
39.0
CRH
STEAM
TEMP AT
DSH
INLET -L
289.1
278.0
271.6
265.1
258.2
256.7
256.7
255.7
254.7
255.7
256.5
255.9
255.7
254.7
255.5
255.7
254.9
255.5
254.7
254.7
259.1
264.2
270.8
TOTAL
RH
SPRAY
FLOW
67.8
72.8
80.5
82.5
82.6
82.6
83.4
84.2
84.3
84.4
84.4
84.5
84.5
84.2
83.5
82.7
82.0
78.4
78.4
78.5
78.7
67.9
67.0
RH DSH HRH
OUTLET OUTLET
TEMP - L STEAM
TEMP-L
249.3
256.1
254.7
254.7
254.7
254.7
254.8
254.5
254.4
254.2
254.0
253.9
253.7
253.5
254.4
253.8
252.8
254.3
254.2
253.8
252.8
252.8
252.8
398.3
392.0
383.1
378.7
356.9
341.0
314.9
288.8
272.6
256.8
254.4
253.8
253.1
253.3
259.4
259.5
264.5
264.5
268.2
272.7
277.1
281.7
287.7
Location
of failure
BLOCKADE IN SH & RH
FROM ERECTION DEBRIS
90o rod
Plate size 6 x 4
Rod
Washer
Cut metal
chips
Rod
Washer
Location of
failure
Rihand U-5