EG55F6 Risers Systems &

Hydrodynamics
Continuous Assessment Overview
- Hannah Hondebrink 12/2/14
Timetable and Assessment Format
20% Continuous Assessment

Expected study time = 30 hours in total (about 3hrs per week)
Campus students: Group project including Flexcom analysis

Assignment:

Issue in Week 34.
Due in Week 43 (Tuesday at 3pm)
Software tutorial in Week 37

Submission deadlines will be strictly adhered to. Late
assignments will incur penalties as per University Policy.

Please note: Not reading/accessing MyAbdn regularly is
not justification for missing a deadline etc.

Campus Students
- Group Assignment Overview

2-hour computing session per week
Wednesdays 9 11am: Weeks 31-37, 41-42
Room FN114

Groups have been allocated and will be announced via
MyAbdn.

6 or 5 people per group.

The report will be marked as a group effort.

Self- and Peer-Assessment will be used to determine
individual marks.
Campus Students
- Group Assignment Overview

Week 31: MCS Kenny Introduction to Flexcom lecture
Week 32 &33: Flexcom Manual: Worked Example
Week 34: Flexcom Manual: Example 7 - Steep Wave Riser

***Assignment issued***

Week 35 & 36: Build Flexcom model for assignment.
***(Perform input calculations for Flexcom analysis)***
Week 37: Flexcom Tutorial session with MCS Kenny

Week 38-40: Easter holiday: Run Flexcom analysis & sensitivities
Week 41 & 42: Collate report
Week 43: Assignment due

D
e
v
e
l
o
p

E
s
s
e
n
t
i
a
l

S
k
i
l
l
s

B
u
i
l
d

M
o
d
e
l

F
i
n
a
l
i
s
e

R
e
p
o
r
t

Some advice for the Group Project

Attendance at lab sessions is compulsory and will be recorded at some
point. If you are not present at that time you will be marked as
absent. University policy on Student Monitoring will be adhered to.

Be proactive the mini project is a group assignment. You are all
expected to proactively collaborate, contribute to the assignment and
appropriately resolve any group issues that may arise

A proportion of your mark will be determined by your teammates
Peer Assessment. Make sure you have shared the workload and been a
useful team member throughout the assignment period, not just the
last few weeks.

Please report any instances of non-participation straight away

Flexcom licences are limited only one or two licences per
group. Please ensure you close down Flexcom after use.