Anda di halaman 1dari 17

HUAWEI TECHNOLOGIES CO., LTD.

www.huawei.com
Huawei Confidential
Security Level:
:40-47pt
:26-30pt
:
:
FrutigerNext LT Medium
: Arial


:35-47pt
:
:24-28pt
:
:




2014/8/1
INWI 3G Extension
Summary
Dec19,2013
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential
:32-35pt
: R153 G0 B0
:
FrutigerNext LT Medium
: Arial

:30-32pt
: R153 G0 B0
:



:20-22pt
(2-5) :18pt
:
:
FrutigerNext LT Regular
: Arial

:18-20pt
(2-5):18pt
:
:





.



BTS3900 indoor Macro
BTS
BTS3900A Outdoor Macro
BTS
DBS3900 Distribute
BTS
BBU3900
RRU
dimension
900mm x 600mm
x 450mm(W x D x
H)
Weight
70 kg(no
module)
135 kg(full
module)
configurati
on
6RFU/12RFU
dimension
RF cabinet: 700mm x
600mm x 480mm(W x D
x H)
APM30 cabinet: 700mm
x 600mm x 480mm(W x
D x H)
Weight 114 kg
configurati
on
6RFU/12RFU
dimensio
n
RRU3926: 400 * 240 *
160mm (W x D x H)
RRU3806: 485
285 170 mm(W x
D x H)
Weight
15 kg (RRU3936)
15 kg (RRU3826)
Product Solution
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential
:32-35pt
: R153 G0 B0
:
FrutigerNext LT Medium
: Arial

:30-32pt
: R153 G0 B0
:



:20-22pt
(2-5) :18pt
:
:
FrutigerNext LT Regular
: Arial

:18-20pt
(2-5):18pt
:
:





.



Product Solution
2100M
1T2R
UMTS
1x 80W
WRFU(80W)
U2100
2100M ,1T
2R
1x 80W
RRU3826
U2100
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential
:32-35pt
: R153 G0 B0
:
FrutigerNext LT Medium
: Arial

:30-32pt
: R153 G0 B0
:



:20-22pt
(2-5) :18pt
:
:
FrutigerNext LT Regular
: Arial

:18-20pt
(2-5):18pt
:
:





.



Overview of Site Scenarios
Indoor Macro:
Outdoor BTS+DBS:
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential
:32-35pt
: R153 G0 B0
:
FrutigerNext LT Medium
: Arial

:30-32pt
: R153 G0 B0
:



:20-22pt
(2-5) :18pt
:
:
FrutigerNext LT Regular
: Arial

:18-20pt
(2-5):18pt
:
:





.



Page 5 of 13
9
0
0
G
R
F
U
1
8
0
0
G
R
F
U
9
0
0
G
R
F
U
1
8
0
0
G
R
F
U
9
0
0
G
R
F
U
1
8
0
0
G
R
F
U
FAN
AirInlet
GATM
BBU
DCDU-01
Space 2U
No. Component Change
Type
Remarks
1 Filler panel Replaced Replace the filler panel with ELU.
2 ELU Added
3 Fan Replaced Replace the FAN unit with the
FAN 03C unit.
4 GATM Removed
9
0
0
G
R
F
U
1
8
0
0
G
R
F
U
9
0
0
G
R
F
U
1
8
0
0
G
R
F
U
9
0
0
G
R
F
U
1
8
0
0
G
R
F
U
FAN 03
New AirInlet
BBU
DCDU-12A
Space 2U
ELU
Update BTS3900 VAVD
No. Power Cable
Name
Change Type From To
1 RFU Replaced RFU0~5 DCDU-12A Load0~5
2 FAN Replaced Fan DCDU-12A Load6
3 BBU Replaced BBU EPUE DCDU-12A Load7
4 GATM Removed GATM SPARE1 or SPARE2 on
the DCDU-01
5 DCDU Input Added or reused PDF DCDU-12A Power input
No. Monitoring Signal
Cable Name
Change
Type
From To
S1 ELU Added ELU Sensor on FAN
S2 Upper GATM Removed COM2 on GATM COM-in on FAN
S3 Surge
Protection alarm
Removed Ext_alm 0 on BBU SPD_ALM on DCDU01
S4 Upper GATM Removed COM1 on GATM Mon0 on BBU UPEU
S5 FAN Added COM IN on FAN MON 0 on BBU UPEU
Change the Component
Change the Power Cables
Change the Monitoring Signal Cables
S1
S5 S2
S3
S4
Call NOC to Confirm
Cabinet Update Time
Power on Cabinet,
Call NOC to Confirm
Status, 2G Call Test
No. Component Change
Type
Remarks
5 DCDU-01 Replaced DCDU-01 with the DCDU-12A.
Before After
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential
:32-35pt
: R153 G0 B0
:
FrutigerNext LT Medium
: Arial

:30-32pt
: R153 G0 B0
:



:20-22pt
(2-5) :18pt
:
:
FrutigerNext LT Regular
: Arial

:18-20pt
(2-5):18pt
:
:





.



Page 6 of 13
9
0
0
G
R
F
U
1
8
0
0
G
R
F
U
9
0
0
G
R
F
U
1
8
0
0
G
R
F
U
9
0
0
G
R
F
U
1
8
0
0
G
R
F
U
FAN
AirInlet
GATM
BBU
DCDU-01
Space 2U
No. Component Change
Type
Remarks
1 Filler panel Replaced Replace the filler panel with ELU.
2 ELU Replaced
3 Fan Replaced Replace the FAN unit with the
FAN 03C unit.
4 GATM Removed
9
0
0
G
R
F
U
1
8
0
0
G
R
F
U
9
0
0
G
R
F
U
1
8
0
0
G
R
F
U
9
0
0
G
R
F
U
1
8
0
0
G
R
F
U
FAN 03
New AirInlet
BBU
DCDU-12A
Space 2U
ELU
Update BTS3900 VBVD
No. Power Cable
Name
Change Type From To
1 RFU Replaced RFU0~5 DCDU-12A Load0~5
2 FAN Replaced Fan DCDU-12A Load6
3 BBU Replaced BBU EPUE DCDU-12A Load7
4 GATM Removed GATM SPARE1 or SPARE2 on
the DCDU-01
5 DCDU Input Added or reused PDF DCDU-12A Power input
No. Monitoring Signal
Cable Name
Change
Type
From To
S1 ELU Added ELU Sensor on FAN
S2 Upper GATM Removed COM2 on GATM COM-in on FAN
S3 Surge
Protection alarm
Removed Ext_alm 0 on BBU SPD_ALM on DCDU01
S4 Upper GATM Removed COM1 on GATM Mon0 on BBU UPEU
S5 FAN Added COM IN on FAN MON 0 on BBU UPEU
Change the Component
Change the Power Cables
Change the Monitoring Signal Cables
S1
S5 S2
S3
S4
Call NOC to Confirm
Cabinet Update Time
Power on Cabinet,
Call NOC to Confirm
Status, 2G Call Test
No. Component Change
Type
Remarks
5 DCDU-01 Replaced DCDU-01 with the DCDU-12A.
Before After
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential
:32-35pt
: R153 G0 B0
:
FrutigerNext LT Medium
: Arial

:30-32pt
: R153 G0 B0
:



:20-22pt
(2-5) :18pt
:
:
FrutigerNext LT Regular
: Arial

:18-20pt
(2-5):18pt
:
:





.



Page 7 of 13
9
0
0
M

&

1
8
0
0
M

COMB.
1800M & 2100M
900M
2 pairs
No. Component Change
Type
Remarks
1 Cabinet Added /
Add the Cabinet
No. Cable Name Change
Type
From To
1 CPRI cables Added CPRI0 on
WRFU (slat
1,3,5)
CPRI port (1,3,5) on
WBBP board
1 DCDU power
cable
Added PDF DCDU-12A Power input
2 Cabinet
Monitoring
Signal Cables
Added COM OUT on
FAN(1
st
)
COM IN on FAN(2
nd
)
3 Equipotential
cable
Added PGND(1
st
) PGND(2
nd
)
4 2100 EFU RF
Cable
Added TX-RXA,TX-
RXB
/
Add the Cables
Pre install Combiner
Cutover the 1800M &2100M to the Combiner
Install 3G Transmission Cable, Call NOC to commission and
integrate
Install UMPT&WBBP
Power on Cabinet, Call NOC to Confirm Status,
2G 1800M and 3G 2100M Call Test
No. Cable Name Change Type From To
1 GE/FE cable Added FE0 on UMPT Transmission equipment
To Transmission
Extend 3G BTS3900(VC,VD+VD)
900&1800>900&1800&2100
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential
:32-35pt
: R153 G0 B0
:
FrutigerNext LT Medium
: Arial

:30-32pt
: R153 G0 B0
:



:20-22pt
(2-5) :18pt
:
:
FrutigerNext LT Regular
: Arial

:18-20pt
(2-5):18pt
:
:





.



Page 8 of 13
9
0
0
M

&

2
1
0
0
M

2100M
900M
2 pairs
No. Component Change
Type
Remarks
1 Cabinet Added /
Add the Cabinet
No. Cable Name Change
Type
From To
1 CPRI cables Added CPRI0 on
WRFU (slat
1,3,5)
CPRI port (1,3,5) on
WBBP board
1 DCDU power
cable
Added PDF DCDU-12A Power input
2 Cabinet
Monitoring
Signal Cables
Added COM OUT on
FAN(1
st
)
COM IN on FAN(2
nd
)
3 Equipotential
cable
Added PGND(1
st
) PGND(2
nd
)
4 2100 EFU RF
Cable
Added TX-RXA,TX-
RXB
/
Add the Cables
Install Feeder for 2100M
Install 3G Transmission Cable, Call NOC to commission and integrate
Install UMPT&WBBP
Power on Cabinet, Call NOC to Confirm Status, 3G 2100M Call Test
No. Cable Name Change Type From To
1 GE/FE cable Added FE0 on UMPT Transmission equipment
To Transmission
Extend 3G BTS3900(VC,VD+VD)
900>900&2100
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential
:32-35pt
: R153 G0 B0
:
FrutigerNext LT Medium
: Arial

:30-32pt
: R153 G0 B0
:



:20-22pt
(2-5) :18pt
:
:
FrutigerNext LT Regular
: Arial

:18-20pt
(2-5):18pt
:
:





.



Page 9 of 13
Update BTS3900A VAVD
9
0
0
G
R
F
U
1
8
0
0
G
R
F
U
9
0
0
G
R
F
U
1
8
0
0
G
R
F
U
9
0
0
G
R
F
U
1
8
0
0
G
R
F
U
FAN
CMUEA
FAN
FAN
Panel
DCDU13A DCDA13A
9
0
0
G
R
F
U
1
8
0
0
G
R
F
U
9
0
0
G
R
F
U
1
8
0
0
G
R
F
U
9
0
0
G
R
F
U
1
8
0
0
G
R
F
U
FAN
FMUA
FAN
Panel
DCDU02 DCDA02
SLPU
EPS4890
PMU PSU PSU PSU
BBU
TM space
FAN
SLPU
EPU05
PSU PSU PSU
PMU PSU PSU
BBU
TM space
ELU
ELU
Before After
D
O
O
R
D
O
O
R
D
O
O
R
D
O
O
R
No. Component Change
Type
Remarks
1 Front Door Replaced
2 ELU Added
3 Fan Replaced
Change the Component
Call NOC to Confirm Cabinet Update
Time
APM30
4 FMUA Replaced FMUA is replaced by CMEA
5 ELU Added
6 Panel Replaced Replace the panel with ELU.
RFC
No. Power Cable
Name
Change
Type
From To
1 APM FAN Replaced Fanbox_PWR EPU load2
2 DCDU13A Input Replaced RFC1 output
on EPU
DCDU13A left (input)
3 BBU Replaced BBU EPUE EPU load5
4 Parallel connection Replaced DCDU13A left DCDU13A right
Change the Power Cables
No. Power Cable
Name
Change Type From To
1 RFU0,1,2 Replaced RFU DCDU13A left load 0,1,2
2 RFU3,4,5 Replaced RFU DCDU13A right load 0,1,2
3 CMUEA Replaced CMUEA DCDU13A left load3
1 EPD4890 Replaced EPU05
2 DCDU02 Replaced DCDU13A
No. Monitoring Signal
Cable Name
Change
Type
From To
S1 ELU Added Fanbox_ELU ELU
S2 Door state Replaced Door state sensor PMU_Gate
S3 Fan in door Replaced Fan in door Fanbox FAN_EXT
S4 Fanbox Replaced Fanbox COM_IN UPEU MON1
S5 PMU Added PMU COM_IN Fanbox COM_OUT
S1 ELU Added EMUAE_ELU ELU
S2 Door state Replaced Door state sensor EMUAE_Gate
S3 Temp. Replaced Temp. Sensor EMUAE_TEM
S4 DC SPD Replaced EMUAE_IN0,1 2 DCDU SPD
S5 EFAN Replaced FAN1,2 EMUAE EFAN1,2
S6 EFAN Reused FAN3,4 Fixed
S0 Cabinet Reused CMUEA COM IN BBU MON0
Change the Monitoring Signal Cables
Power on Cabinet, Call NOC to
Confirm Status, 2G Call Test
S1
S2
S3
S5
S4
S1
S2
S3
S4
S5 S6
S0
S1
S2
S3
S5
S4
S1
S2
S3
S4
S5 S6
S0
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential
:32-35pt
: R153 G0 B0
:
FrutigerNext LT Medium
: Arial

:30-32pt
: R153 G0 B0
:



:20-22pt
(2-5) :18pt
:
:
FrutigerNext LT Regular
: Arial

:18-20pt
(2-5):18pt
:
:





.



Page 10 of 13
Update BTS3900A VBVD
Before After
Call NOC to Confirm Cabinet Update
Time
APM30
FAN
9
0
0
G
R
F
U
1
8
0
0
G
R
F
U
9
0
0
G
R
F
U
1
8
0
0
G
R
F
U
9
0
0
G
R
F
U
1
8
0
0
G
R
F
U
FAN
Panel
DCDU01
SLPU
EPS4890
PMU PSU PSU PSU
BBU
TM space
D
O
O
R
D
O
O
R
9
0
0
G
R
F
U
1
8
0
0
G
R
F
U
9
0
0
G
R
F
U
1
8
0
0
G
R
F
U
9
0
0
G
R
F
U
1
8
0
0
G
R
F
U
FAN
Panel
DCDU12A
FAN
SLPU
EPU05
PSU PSU PSU
PMU PSU PSU
BBU
TM space
ELU
ELU
D
O
O
R
D
O
O
R
No. Component Change
Type
Remarks
1 Front Door Replaced
2 ELU Replaced
3 Fan Replaced
Change the Component
APM30
4 FAN Replaced
5 ELU Replaced
RFC
1 EPD4890 Replaced EPU05
2 DCDU01 Replaced DCDU12A
No. Power Cable
Name
Change
Type
From To
1 APM FAN Replaced Fanbox_PWR EPU load2
2 DCDU12A Input Replaced RFC1 output
on EPU
DCDU12A (input)
3 BBU Replaced BBU EPUE EPU load5
Change the Power Cables
No. Power Cable
Name
Change Type From To
1 RFU0,1,2,3,4,5 Replaced RFU DCDU12A left load 0,1,2,3,4,5
2 RFC FAN Replaced FAN DCDU12A load6
S2
S1
S2
S3
S5
S4
S1
S3
S0
S2
S1
S2
S3
S5
S4
S1
S3
S0
No. Monitoring Signal
Cable Name
Change
Type
From To
S1 ELU Added Fanbox_ELU ELU
S2 Door state Replaced Door state sensor PMU_Gate
S3 Fan in door Replaced Fan in door Fanbox FAN_EXT
S4 Fanbox Replaced Fanbox COM_IN UPEU MON1
S5 PMU Added PMU COM_IN Fanbox COM_OUT
S1 ELU Added EMUAE_ELU ELU
S2 Door state Replaced Door state sensor EMUAE_Gate
S3 Temp. Replaced Temp. Sensor EMUAE_TEM
S4 DC SPD Replaced EMUAE_IN0,1 2 DCDU SPD
S5 EFAN Replaced FAN1,2 EMUAE EFAN1,2
S6 EFAN Reused FAN3,4 Fixed
S0 Cabinet Reused FAN COM IN UPEU MON0
Change the Monitoring Signal Cables
Power on Cabinet, Call NOC to
Confirm Status, 2G Call Test
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential
:32-35pt
: R153 G0 B0
:
FrutigerNext LT Medium
: Arial

:30-32pt
: R153 G0 B0
:



:20-22pt
(2-5) :18pt
:
:
FrutigerNext LT Regular
: Arial

:18-20pt
(2-5):18pt
:
:





.



Page 11 of 13
Update DBS3900(APM30) VBVD
Call NOC to Confirm Cabinet Update
Time
No. Component Change
Type
Remarks
1 Front Door Replaced
2 ELU Replaced
3 Fan Replaced
4 DCDU12B Added
Change the Component
DCDU12B
FAN
SLPU
EPU05
PSU PSU PSU
PMU PSU PSU
BBU
TM space
ELU
D
O
O
R
FAN
SLPU
EPS4890
PMU PSU PSU PSU
BBU
TM space
D
O
O
R
S1
S2
S3
S5
S4
TO 6RRU
Before
After
TO 6RRU
1 EPD4890 Replaced EPU05
S1
S2
S3
S5
S4
No. Power Cable
Name
Change Type From To
1 RRU Reused RRU0~5 EPU Load0~5
2 FAN Replaced Fan EPU Load6
3 BBU Replaced BBU EPUE EPU Load7
4 DCDU Input Added EPU RFC Load DCDU-12B Power input
Change the Power Cables
Change the Monitoring Signal Cables
No. Monitoring Signal
Cable Name
Change
Type
From To
S1 ELU Added Fanbox_ELU ELU
S2 Door state Replaced Door state sensor PMU_Gate
S3 Fan in door Replaced Fan in door Fanbox FAN_EXT
S4 Fan box Replaced Fanbox COM_IN UPEU MON1
S5 PMU Added PMU COM_IN Fanbox COM_OUT
Power on Cabinet, Call NOC to
Confirm Status, 2G Call Test
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential
:32-35pt
: R153 G0 B0
:
FrutigerNext LT Medium
: Arial

:30-32pt
: R153 G0 B0
:



:20-22pt
(2-5) :18pt
:
:
FrutigerNext LT Regular
: Arial

:18-20pt
(2-5):18pt
:
:





.



9
0
0
G
R
F
U
1
8
0
0
G
R
F
U
9
0
0
G
R
F
U
1
8
0
0
G
R
F
U
9
0
0
G
R
F
U
1
8
0
0
G
R
F
U
FAN
Panel
DCDU12A
FAN
SLPU
EPU05
PSU PSU PSU
PMU PSU PSU
BBU
TM space
D
O
O
R
D
O
O
R
DCDU12B
To Transmission
9
0
0
M

&

1
8
0
0
M

9
0
0
M

1
8
0
0
M

&

2
1
0
0
M

Add DCDU, Add the 3G RRU
No. Cable Name Change
Type
From To
1 DCDU power
cable
Added EPU Load RFC2 DCDU-12B Power input
2 RRU CPRI
cables
Added CPRI-W on RRU CPRI port (1,3,5) on
WBBP board
3 RRU Power
Cables
Added RRU Input DCDU load 1,3,5
4 RRU RF
Jumpers
Added RRU Combiner
Add the Cables
Pre install Combiner
Cutover the 1800M &2100M to the Combiner
Install 3G Transmission Cable, Call NOC to commission and
integrate
Install UMPT&WBBP
Power on Cabinet, Call NOC to Confirm Status, 2G 1800M and 3G
2100M Call Test
No. Cable Name Change Type From To
1 GE/FE cable Added FE0 on UMPT Transmission equipment
BTS3900A Extend 3G DBS3900(RT)
900&1800>900&1800&2100
COMB.
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential
:32-35pt
: R153 G0 B0
:
FrutigerNext LT Medium
: Arial

:30-32pt
: R153 G0 B0
:



:20-22pt
(2-5) :18pt
:
:
FrutigerNext LT Regular
: Arial

:18-20pt
(2-5):18pt
:
:





.



9
0
0
G
R
F
U
P
e
n
a
l
9
0
0
G
R
F
U
P
e
n
a
l
9
0
0
G
R
F
U
P
e
n
a
l
FAN
Panel
DCDU12A
FAN
SLPU
EPU05
PSU PSU PSU
PMU PSU PSU
BBU
TM space
D
O
O
R
D
O
O
R
DCDU12B
To Transmission
9
0
0
M

&

1
8
0
0
M

9
0
0
M


2
1
0
0
M

Add DCDU, Add the 3G RRU
No. Cable Name Change
Type
From To
1 DCDU power
cable
Added EPU Load RFC2 DCDU-12B Power input
2 RRU CPRI
cables
Added CPRI-W on RRU CPRI port (1,3,5) on
WBBP board
3 RRU Power
Cables
Added RRU Input DCDU load 1,3,5
4 RRU RF
Jumpers
Added RRU Combiner
Add the Cables
Install 3G Transmission Cable, Call NOC to commission and
integrate
Install UMPT&WBBP
Power on Cabinet, Call NOC to Confirm Status, 3G 2100M Call Test
No. Cable Name Change Type From To
1 GE/FE cable Added FE0 on UMPT Transmission equipment
BTS3900A Extend 3G DBS3900(RT)
900>900&2100
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential
:32-35pt
: R153 G0 B0
:
FrutigerNext LT Medium
: Arial

:30-32pt
: R153 G0 B0
:



:20-22pt
(2-5) :18pt
:
:
FrutigerNext LT Regular
: Arial

:18-20pt
(2-5):18pt
:
:





.



9
0
0
G
R
F
U
1
8
0
0
G
R
F
U
9
0
0
G
R
F
U
1
8
0
0
G
R
F
U
9
0
0
G
R
F
U
1
8
0
0
G
R
F
U
FAN
Panel
DCDU12A
FAN
SLPU
EPU05
PSU PSU PSU
PMU PSU PSU
BBU
TM space
D
O
O
R
D
O
O
R
DCDU12B
To Transmission
9
0
0
M

&

1
8
0
0
M

9
0
0
M
&
1
8
0
0
M


2
1
0
0
M

Add DCDU, Add the 3G RRU, add 2100M antenna
No. Cable Name Change
Type
From To
1 DCDU power
cable
Added EPU Load RFC2 DCDU-12B Power input
2 RRU CPRI
cables
Added CPRI-W on RRU CPRI port (1,3,5) on
WBBP board
3 RRU Power
Cables
Added RRU Input DCDU load 1,3,5
4 RRU RF
Jumpers
Added RRU Combiner
Add the Cables
Install 3G Transmission Cable, Call NOC to commission and
integrate
Install UMPT&WBBP
Power on Cabinet, Call NOC to Confirm Status, 3G 2100M Call Test
No. Cable Name Change Type From To
1 GE/FE cable Added FE0 on UMPT Transmission equipment
BTS3900A Extend 3G 2100 DBS3900(GF)
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential
:32-35pt
: R153 G0 B0
:
FrutigerNext LT Medium
: Arial

:30-32pt
: R153 G0 B0
:



:20-22pt
(2-5) :18pt
:
:
FrutigerNext LT Regular
: Arial

:18-20pt
(2-5):18pt
:
:





.



FAN
SLPU
EPU05
PSU PSU PSU
PMU PSU PSU
BBU
TM space
D
O
O
R
DCDU12B
To Transmission
9
0
0
M

&

1
8
0
0
M


2
1
0
0
M

Add DCDU, Add the 3G RRU, add 2100M antenna
No. Cable Name Change
Type
From To
1 DCDU power
cable
Added EPU Load RFC2 DCDU-12B Power input
2 RRU CPRI
cables
Added CPRI-W on RRU CPRI port (1,3,5) on
WBBP board
3 RRU Power
Cables
Added RRU Input DCDU load 1,3,5
4 RRU RF
Jumpers
Added RRU Combiner
Add the Cables
Install 3G Transmission Cable, Call NOC to commission and
integrate
Install UMPT&WBBP
Power on Cabinet, Call NOC to Confirm Status, 3G 2100M Call Test
No. Cable Name Change Type From To
1 GE/FE cable Added FE0 on UMPT Transmission equipment
DBS3900 Extend 3G 2100 DBS3900
900&1800>900&1800&2100
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential
:32-35pt
: R153 G0 B0
:
FrutigerNext LT Medium
: Arial

:30-32pt
: R153 G0 B0
:



:20-22pt
(2-5) :18pt
:
:
FrutigerNext LT Regular
: Arial

:18-20pt
(2-5):18pt
:
:





.



FAN
SLPU
EPU05
PSU PSU PSU
PMU PSU PSU
BBU
TM space
D
O
O
R
DCDU12B
To Transmission
9
0
0
M

&

1
8
0
0
M

Add DCDU, Add the 3G RRU
No. Cable Name Change
Type
From To
1 DCDU power
cable
Added EPU Load RFC2 DCDU-12B Power input
2 RRU CPRI
cables
Added CPRI-W on RRU CPRI port (1,3,5) on
WBBP board
3 RRU Power
Cables
Added RRU Input DCDU load 1,3,5
4 RRU RF
Jumpers
Added RRU Combiner
Add the Cables
Install 3G Transmission Cable, Call NOC to commission and
integrate
Install UMPT&WBBP
Power on Cabinet, Call NOC to Confirm Status, 3G 2100M Call Test
No. Cable Name Change Type From To
1 GE/FE cable Added FE0 on UMPT Transmission equipment
DBS3900 Extend 3G 2100 DBS3900
900>900&2100
Thank You
www.huawei.com

Anda mungkin juga menyukai