Anda di halaman 1dari 29

The advanced rotating equipment: Troubleshooting of Pumps,

Compressors, Gearboxes and Dynamic balancing


15-19 April 2012

Abu Dhabi

Technical Director
Dr. Abu Bakr I. Abdel Wahab

Organized By:
www.ecoman-uae.com
Dr. Abubakr I. Abdelwahab, PhD., is an International Expert in Mechanical
Maintenance Engineer with over 30 years of Industrial Experience in Maintenance
Planning and Condition Monitoring, Vibration Measurements and Analysis,
Balancing, Pumps, Shaft Alignment, Computer Maintenance Management System,
troubleshooting, maintenance planning and scheduling. He is currently a professor,
in the Department of Mechanical Engineering, Faculty of Engineers, where he is in
charge of engineering consulting, maintenance, and troubleshooting services to the
petrochemical, oil, gas and allied industries.
Course Director: Dr. Abubakr Abd El-Wahab .
Dr. Abdelwahab holds a Ph.D. in Mechanical Engineering - Birmingham, UK,
1985. He was granted Four Years Scholarship. In addition, to the O.R.S award
from the UK Government. Some of his various accomplishments include
developing and designing the related curriculum and the training teaching
materials. During his career life, Dr. Abdelwahab was the head of mechanical
engineering and maintenance department in Royal Commission, Yanbu, Kingdom
of Saudi Arabia. He also worked as an expert witness in court cases and litigation
involving machine deterioration or failure.
As a Senior Consultant, Dr. Abdelwahab conduct many training programs for
various Middle East companies and organizations in Kingdom of Saudi Arabia,
Bahrain, Qatar, United Arab Emirate, Kuwait, Sudan, Egypt and Kula Lumpur,
where he spearheads major international training programs and comprehensive
presentations .
Dr. Abubakr delivers many In-House training and consultancies within different industry
include:
Jubail, Sabic Company , KSA
Qatar Gas Doha Qatar
Qatar Chemical Company Ltd
PetroDar Sudan
Sert Refinary Libia
KNPC Kuwait
Kuwait , Wafra Joint Operations
KSA, Aramco Khafji Joint Operations
Borouge UAE
Ministry of Interior, KSA
Hamad Medical Corporation, Qatar
King Abdulaziz Medical City Hospital in Jeddah
Emirates Transport
Public Works Authority, Qatar
Aluminum Bahrain Company
Electricity and Water Authority -
Saudi Electricity Company in Saudi Arabia
Marafiq - Power and Water Utility Company for Jubail and Yanbu, Saudi Arabia
Saline Water Conversion Corp, Saudi Arabia
Modern Arabian Crystal Industrial Co. Ltd, Saudi Arabia
Engineering Consultant Group, El Sefarat District, Cairo Egypt
Course Program
Introduction of Delegates
Trainees Expectations
Introduction of Rotating Equipment
Parts of the machine: casing, rotor, bearing, coupling
Gearbox
Bearings
Coupling
Machinery mounting/ installation
Face Gap
Shaft Alignment
Computer Application
Balancing
Computer Balancing
Pumps
Mechanical pump seals, types, operation, related problems
Machinery Strip-down, Assembly, Inspection, Clearances and Adjustment
Course Program (Continue)
Maintenance Strategies
Break down, Reactive, By default
Preventive Maintenance PM,
Predictive Maintenance PDM,
Proactive Maintenance
Vibration fundamental definitions
Vibration pattern index
Vibration spectrum
Critical speed
Vibration Measurements
Gearbox Failure Case
Pump Failure Case
Vibration Analysis for Unbalance failure
Vibration Analysis Data for misalignment failure
Electrical Motor Problems
Vibration Analysis for Belt Drive Problem
Vibration Analysis for Bearings failure
Course Program (Continue)
The role of lubrication
Lubrication Purposes
Hydrostatic lubrication
Hydrodynamic lubrication
Lubrication Methods
Elasto hydro dynamic lubrication
Elasto hydro dynamic lubrication
Boundary Lubrication
ISO Cleanliness Code
Case History : Oil Analysis
Air Compressor
Types of Compressors
Problems in compressed air systems
Compressor auxiliary equipments
Air Compressor Problem
Introduction of Delegates

Trainees Expectations ?
Pre Assessment
The purpose of the Pre Assessment is to help determine your current
understanding and working knowledge
The Pre Assessment will help to uncover your areas of weakness so that
appropriate training can be prescribed.
Do not take an undue amount of time trying to "figure out" the correct
answer.
Typically, you will either know the answer, or you won't.
If you do not know the answer, your natural instinct will be to "guess."
This will not help. Simply pass over the question and go on to the next
Finally, this test is not intended to either qualify or disqualify you.
It simply provides a starting point from which our training can be adjusted
Q1 - Today modern maintenance focus on:
a) Fix things when they break
b) Prevent the failures
c) Eliminate the high consequence of failure
Q 2: The following misalignment requires
a) Up and down movement
b) Side to side movement

Q3- How pumps are normally rated ?

a) Power
b) Mass and Dimensions
c) Flow Rate
d) Head
Q4- List the name of the shown pump component
1-
2-
3-
4-
5-
6-

Q5- Flow rate is usually expressed in:
a) GPM

b) L/S

c) m
3
/s
Q6- The Flow Rate when using 6
"
pump impeller is.
Q7- Which is correct ?
A
B
Angular contact bearings
Q8- Which of the shown mounting is correct?
1
2
Q9- Which is Correct?
1
2
s
v
h
g .
P
Z
g .
1 P
.. ..........

Q10-
Q11- Symptoms of Cavitation includes
a) Repeated seal or bearing failures
b) High vibrations
c) Lower Net positive suction head
d) Repeated impeller replacements
Q12- Which of the following combination requires thrust bearings ?
a) Straight spur gears
b) Helical gears
1 2 3 4 5
Q13 - Which of the following combination allows Interchangeability ?
Helical gears
spur gears
Q14- Why did the seal fail?
The lapped faces opened
Why did the faces open?
Q15- Which of the shown pickup mounting is correct?
1
2
3
4
5
6 7
Q16- Below is the Spectrum of a pump motor system
Suggest a Troubleshooting to this Case
3000 r/min
Q17 How to determine the mechanical center
Q18- Hydrostatic lubrication
a) The pressure is supplied by an outside source
b) The pressure is generated internally

Q19- Hydrodynamic lubrication
a) The pressure is supplied by an outside source
b) The pressure is generated internally

Q20- The mass of the foundation should ..the mass of the
machine sitting on it

a) equal

a) be three times

Anda mungkin juga menyukai