Anda di halaman 1dari 15

Bored Pile

PT. Indonesia Pondasi Raya


Bored Pile
Surveying

Stake out
Pile Location
Bored Pile
Surveying
Mobilisasi
Set up of equipment
Bored Pile
Surveying
Set up of equipment
Placement equipment
Provide concrete/steel plate platform if required
Bored Pile
Surveying
Set up of equipment
Placement equipment
Primary boring
Continue boring
x
y
Check and adjust
verticality
from 2 directions
Ground water level
Steel bar guide
Water level instrument
Bored Pile
Surveying
Set up of equipment
Placement equipment
Primary boring
Continue boring
Replace Auger with bucket
Bored Pile
Surveying
Set up of equipment
Placement equipment
Primary boring
Continue boring
Inserting casing
Bored Pile
Surveying
Set up of equipment
Placement equipment
Primary boring
Continue boring
Inserting casing
Continue boring
Bored Pile
Surveying
Set up of equipment
Placement equipment
Primary boring
Continue boring
Inserting casing
Continue boring
Terminated boring
Check required depth
Check soil tipe
Bored Pile
Surveying
Set up of equipment
Placement equipment
Primary boring
Continue boring
Inserting casing
Continue boring
Terminated boring
Cleaning bore hole
Bored Pile
Surveying
Set up of equipment
Placement equipment
Primary boring
Continue boring
Inserting casing
Continue boring
Terminated boring
Cleaning bore hole
Steel cage installation
Connect with lifting bars
Welded to casing
Bored Pile
Surveying
Set up of equipment
Placement equipment
Primary boring
Continue boring
Inserting casing
Continue boring
Terminated boring
Cleaning bore hole
Steel cage installation
Tremie pipe installation
Bored Pile
Surveying
Set up of equipment
Placement equipment
Primary boring
Continue boring
Inserting casing
Continue boring
Terminated boring
Cleaning bore hole
Steel cage installation
Tremie pipe installation
Concreting
Tremie pipe length reduced
according to concreting progress
Toe of tremie pipe always minimum
1.5m below top of concrete.
COL
Min 1.5m
Top of concrete
Bored Pile
Surveying
Set up of equipment
Placement equipment
Primary boring
Continue boring
Inserting casing
Continue boring
Terminated boring
Cleaning bore hole
Steel cage installation
Tremie pipe installation
Concreting
Withdraw tremie
Bored Pile
Surveying
Set up of equipment
Placement equipment
Primary boring
Continue boring
Inserting casing
Continue boring
Terminated boring
Cleaning bore hole
Steel cage installation
Tremie pipe installation
Concreting
Withdraw tremie
Withdraw casing
Backfill empty bore
Finish