In normal operation
Even with reconductoring of the 150 kV lines, and addition
of two more 150 kV lines, voltage level at Ungaran 500 kV is
at its low limit
Series compensation of 500 kV lines prevents, primarily,
under voltage in normal operation, in all cases , even
without any modification in 150 level. The voltage
conditions in post-fault period is also good.
It is important to be noted that, series compensation at
Ungaran side of the lines permits to obtain very good
results without any modification at 150 kV level. Specially, if
these modifications are not necessary for area loading
In normal conditions 150 kV lines should not be used to
transfer considerable power instead of 500 kV lines, as it
generates 9 times more losses.
Configuration 2
The same configuration as above, but the conductors of the 150
kV lines are replaced with new conductors having about two
times ampacity as the existing ones, but with the same weight.
Overload of the 150 kV lines are removed. But, voltage at Ungaran
500 kV is low; 95%.
The voltage level of the PRW15(150 kV bus) is low. The reason is
that the power flows down to KUDUS and then returns to
consumer substations of SYUNG and TBROK. That is why the
additional lines between Tanjung-Jati and Syung are proposed, in
configuration 3.
When one 500 kV line of Ungaran is opened, the remaining line
takes about 1910 MVA, which is less than thermal capacity of the
line, and voltage at Ungaran 500 kV is low; 91%.
But, when, the line conditions, and system stability is studied
after removal of a line fault, the remaining line may trip, see the
study results.
So, for normal operation, some compensation is
necessary, specially if the proposed 150 kV modifications
are not implemented.
Configuration 3
With configuration number 2, Two 150 lines are added between
Tanjung jati and Syung.
Even with these additional 150 kV lines, the voltage at Ungaran 500
kV is low; 95.5%.
Therefore, if, the mentioned extensions are delayed, the voltage
would be still lower.
When one 500 kV line trips, resulted conditions are similar to the
previous case.
Configuration 4
This configuration is the configuration 1; only existing
system, with series compensation of the 500 kV lines.
500 kV lines are only the two existing ones going to
Ungaran.
The voltages, (figure of this simulation is not available to
author), The voltage at Ungaran 500 kV is very good
98.3%, for normal operation, and 97% for one line steady state
operation.
Faulted operation results , se later in this report
Configuration number 3;
150 kV lines are reconductored and;
Two 150 kV lines are added between Tbrok &
Syung
UNGARAN-TJATI 500 kV
IBT 500/150 kV
Configuration number 5;
Equivalent to configuration 3, but with about 60%
series compensation on 500 kV lines.
At steady state all voltage conditions become
perfect:
UNGARAN-TJATI 500 Kv
IBT 500/150 kV
VOLTAGE LEVEL AT UNGARAN 500 KV
CONFIG6 (3 PH FAULT AT 1 CKT UNGRAN-TJATI& TRIP 1 UNIT TJATI)
20 kA 20 kA 20 kA 20 kA 20 kA 20 kA 20 kA 20 kA 20 kA 20 kA
1600 A 1600 A 1600 A 1600 A 1600 A 1600 A 1600 A 1600 A 1600 A 1600 A
Mitsubishi PC 14 S Mitsubishi PC 14 S ABB - IMBD 170 A4 ABB - IMBE 170 A4 ABB - IMBE 170 A4 Mitsubishi PC 14 S Mitsubishi PC 14 S
Mitsubishi PC 14 S Mitsubishi PC 14 S ABB - IMBD 170 A4
1600-1200-800-400/1A1600-1200-800-400/1A 1600-1200-800-400/1A 1600-1200-800-400/1A 600-450-300-150/1A 600-450-300-150/1A 2000-1600-800-400/1A 2000-1600-800-400/1A 1600-1200-800-400/1A 1600-1200-800-400/1A
AEG S1-170 F3 AEG S1-170 F3 AEG S1-170 F3 AEG S1-170 F3 Siemens 3AQ1EE AEG S1-170 F3 AEG S1-170 F3
AEG S1-170 F3 AEG S1-170 F3 Siemens 3AQ1EE
3150 A 40 kA 3150 A 40 kA 3150 A 40 kA 3150 A 40 kA 3150 A 40 kA 3150 A 40 kA 3150 A 40 kA 3150 A 40 kA 3150 A 40 kA 3150 A 40 kA
I
II
1600 A 1600 A 2500 A 2500 A
AEG S1-170 F3 AEG S1-170 F3 Siemens 3AQ1EE AEG S1-170 F1 BBC-ELF 170 ABB LTB 170 D1
Mitsubishi PC 14 S
3150 A 40 kA 3150 A 40 kA 3150 A 40 kA 3150 A 40 kA
3150 A 40 kA 3150 A 40 kA 1600-1200-800-400/1 A
Mitsubishi PC 14 S Mitsubishi PC 14 S Mitsubishi PC 14 S ABB IMBD 170 A4
1600-1200-800-400/1A 1600-1200-800-400/1A 1600-1200-800-400 /1A 2000-1000-300-150/1A
AEG S1-170 F1
20 kA 3150 A 40 kA
20 kA
1600 A 1600 A
Rel 20 KV MERLIN GERIN - 2500 A Rel 20 KV ALSTHOM 1250 A Rel 22 KV MITSUBISHI - 1250 A
1000-2000/1A
UGN.1 UGN.5 CAD CAD CAD UGN.7 UGN.6 INC. III KOPEL INC. II UGN.3 UPB.1 UGN.2 UGN.4 CAD CAD
AL 3 X 1 X 400 mm2
PT PLN (Persero)
PENYALURAN DAN PUSAT PENGATUR BEBAN JAWA BALI
REGION JAWA TENGAH DAN DIY
Unit Pelayanan Transmisi Semarang
GI 150 kV UNGARAN
Tanggal Digambar Diperiksa Disetujui Revisi
02-05-2006 DERI CAHYONO MARDI S 01
1RJTD/FML/04-3028 PLN-AREVA - March 2007 File: \\Evop1\D\Single Line Diagram\UPT semarang\GI Ungaran.cdr 41
Ungaran short circuit level