V900R012
Commissioning
www.huawei.com
Foreword
Page2
References
Page3
Objectives
Page4
Contents
1. BSC6900 O&M System Introduction
2. BSC6900 Software Installation
3. BSC6900 Commissioning
Page5
Component
LMT
OMUa boards
SCUa boards
OM modules
on other boards
Page6
OMU as a server
LMT as a client
Page7
Planning Principle
Internal fixed IP
address
External fixed IP
address
Page8
Planning Principle
Internal/External
The virtual IP address is set in the same subnet with the internal/
virtual IP address external fixed IP addresses of the active and standby BAMs
Backup channel
IP addresses
IP address
Page9
Standby OMUa
80.168.3.40/8
80.168.3.50/8
80.168.3.60/8
ETH4-SCU7
ETH5-SCU6
Internal
network
segment
ETH4-SCU7
ETH5-SCU6
192.168.3.60/24
192.168.3.50/24
Intel Ethernet
adapters
ETH3UPDATE
Intel Ethernet
adapters
Dedicated
backup
channel
ETH3UPDATE
SCUa
SCUa
Backboard
BSC6900 FAM
Page10
Standby OMUa
172.121.139.202/24
172.121.139.201/24
External
network
Segment
GE adapter
Virtual IP
172.121.139.200/24
ETH0
ETH0
ETH1
ETH1
Hub
Commissioning
Ethernet
adapter
ETH2
ETH2
LMT/
M2000
192.168.6.50/24
192.168.6.60/24
Page11
Contents
1. BSC6900 O&M System Introduction
2. BSC6900 Software Installation
3. BSC6900 Commissioning
Page12
BSC6900 Software
LMT
MPS/EPS
LMT Software
Host Software
Windows XP
SP2
Java
Environment
Program
File
Data File
OMU Server
Patch File
(optional)
OMU Application
Dopra Linux
Mysql Database
Page13
OMU Software
Page14
Page16
Page17
the OMU
Page18
After the loading is complete, enter the exit command to exist the
psftp software
Page19
cd /mbsc/upgrade/V900R012C00/install/setup
chmod +x ./install_bam.sh
./install_bam.sh
Page20
directory
Page21
working normally
Page22
Contents
1. BSC6900 O&M System Introduction
2. BSC6900 Software Installation
3. BSC6900 Commissioning
Page23
Contents
3. BSC6900 Commissioning
3.1 BSC6900 Commissioning Introduction
3.2 BSC6900 Commissioning Procedure
Page24
Page25
Software preparation
Page26
At least one BTS and one NodeB are connected to the local
If the BSC6900 is connected to the RNC, then that RNC must have
passed the commissioning
Three single-mode UEs, three single-mode MSs and one dualmode UE are ready for test and are registered in the HLR
Page27
Contents
3. BSC6900 Commissioning
3.1 BSC6900 Commissioning Introduction
3.2 BSC6900 Commissioning Procedure
Page28
Local operation
Check hardware operating
Status
Local operation
Remote
operation
Verify OMU
based on local through USB Disk
coopertation
Remote operation
Remote operation
Load BSC6900 Board
Software and Data
files
Verify OMU
Locally
Log in to BSC6900
through LMT
Connect BSC6900 to
M2000
Update OMU
Database
Activate and Verify
the License
Page29
Handle alarms
Page30
Page32
Page33
Run the MML command LST VER to check the version of OMU
Page34
Run the MML command RST DATA. A dialog box is displayed. Click
Upload the MML command script to the /ftp folder in the OMU active
workspace directory
Run the MML command RUN BATCHFILE to run the MML script file
Page35
Run the MML command RST DATA. A dialog box is displayed. Click
Yes to initialize the BSC6900 configuration data in the OMU
database
On the LMT, click the Batch tab to enter the Batch panel
Page36
Page37
Checking the consistency of the data and the version (ACT CRC &
CMP BRDVER)
Page38
Verifying Physical Links at the BSC (DSP E1T1 & DSP OPT)
Page39
Page41
Verifying Physical Links at the BSC (DSP E1T1 & DSP OPT)
Page42
DSP ADJNODE
Page43
Verifying Physical Links at the BSC (DSP E1T1 & DSP OPT)
Page44
DSP ADJNODE
Page45
Page46
Basic services
Feature services
Page47
DCN
Page48
Page49
Thank you