Bondstrand Bonder Training

Fiberglass Pipe

Contents

Part-1: General
Part-2: AMERONs Bondstrand Products
Part-3: HSE & Product handling
Part-4: Fabrication & Installation
Part-5: Hydro-testing

Bondstrand Bonder Training for PTSC M&C - 2009

Part-1 : General
Training Purpose

To provide knowledge of AMERONs


Bondstrand Products
To qualify bonder for bonding certification
required for fabrication and installation of
AMERONs Bondstrand Products

Bondstrand Bonder Training for PTSC M&C - 2009

Part-1 : General
Achievements : Trainee must complete
below points to get certificate

Understanding AMERONs Bondstrand


Products
Understanding product data and QC form
Pass hydrotest on practice

Bondstrand Bonder Training for PTSC M&C - 2009

Part-1 : General

Bonding certificate

Issued by AMERON to trainee who pass


hydrotest on spool practice
2-year validity

Bondstrand Bonder Training for PTSC M&C - 2009

Part-2 : AMERONs Bondstrand Products


Abbreviations

RTRP - Reinforced Thermosetting Resin Pipe


FRP - Fiberglass Reinforced Pipe
GRE - Glass Reinforced Epoxy
GRV - Glass Reinforced Vinylester
GRP - Glass Reinforced Polyester (in some
specifications it means Glass Reinforced Pipe)

Bondstrand Bonder Training for PTSC M&C - 2009

Part-2 : AMERONs Bondstrand Products


Abbreviations
QLF - Quick Lock Female
QLM - Quick Lock Male
TF - Taper Female
TM - Taper Male
B&W - Butt & Wrap
Spigot - Bondstrand Male Pipe End
Bell - Bondstrand Female Pipe End
Bondstrand Bonder Training for PTSC M&C - 2009

Part-2 : AMERONs Bondstrand Products


Filament-wound pipe & fittings with
advanced resins
Epoxy (GRE)
Vinylester (GRV)

Bondstrand Product Lines


Bondstrand 2000/2000M
Bondstrand 7000/7000M
Bondstrand 2400/3400 series
Bondstrand Bonder Training for PTSC M&C - 2009

Part-2 : AMERONs Bondstrand Products

Bondstrand 2000
A lined epoxy system
for applications where
corrosion resistance
and light weight are of
paramount
importance.

Bondstrand Bonder Training for PTSC M&C - 2009

Part-2 : AMERONs Bondstrand Products

Bondstrand 2000M
A lined epoxy system
for applications where
corrosion resistance
and external pressure
are of paramount
importance.

Bondstrand Bonder Training for PTSC M&C - 2009

10

Part-2 : AMERONs Bondstrand Products

Bondstrand 7000/7000M
Unique patented pipe saddle drains
off static charge build-up

Design equal to Bondstrand


2000/2000M

Bondstrand Bonder Training for PTSC M&C - 2009

An epoxy system with


conductive elements
incorporated in the wall
of the pipe to prevent
accumulation of static
electricity produced by
the flow of liquids inside,
and external effects
outside the pipe.
11

Part-2 : AMERONs Bondstrand Products

Bondstrand Series 2400/3400


An

* Also conductive
Bondstrand Bonder Training for PTSC M&C - 2009

epoxy system where corrosion


resistance and light weight are of
paramount importance.
Pressure class determined by
internal pressure requirements.
No external pressure requirements.
Internal pressure class : 10, 12, 14,
16, 20 and 25 bar.
12

Part-2 : AMERONs Bondstrand Products

Bondstrand Bonder Training for PTSC M&C - 2009

13

Part-2 : AMERONs Bondstrand Products

Joining System
Quick-Lock Joint
An

adhesive-bonded joint with


straight spigot and tapered bell.
The integral pipe stop in the
Quick-Lock bell ensures
accurate laying lengths in close
tolerance piping.
Sizes : 25-400 mm (1-16)
Sizes : 450-600 mm (18-24)
Bondstrand Bonder Training for PTSC M&C - 2009

14

Part-2 : AMERONs Bondstrand Products

Joining System
Taper/Taper Joint
An

adhesive-bonded joint with


matching tapered male and
female ends offering superior
strength by controlled adhesive
thickness. Available in sizes :
50-1000 mm (2- 40).
Internal pressure class : 10, 12,
14, 16, 20, 25 bar.
Bondstrand Bonder Training for PTSC M&C - 2009

15

Part-2 : AMERONs Bondstrand Products

Joining System
Flanged Joint
A

mechanical joint. Available


in sizes: 25-1000 mm (140).
Various drilling patterns
available (e.g. CL150, JIS
10K, DIN 10, etc.) Compatible to Steel flanges.
Bondstrand Bonder Training for PTSC M&C - 2009

16

Part-2 : AMERONs Bondstrand Products

Joining System
Butt & Wrap Joint
A

lamination joint. Available


in sizes: 25-1000 mm (140).
Time costly.
Versatile. Most use on repair.

Bondstrand Bonder Training for PTSC M&C - 2009

17

Part-2 : AMERONs Bondstrand Products

Adhesive System
RP-34C
A

two-part amine cured


epoxy resin system
Non-conductive
Use on Quick-Lock joint
Available in 3 oz. kit and 6
oz. kit

Bondstrand Bonder Training for PTSC M&C - 2009

18

Part-2 : AMERONs Bondstrand Products

Adhesive System
RP-60B
A

two-part thermosetting,
electrically conductive epoxy
resin system
Conductive
Use on Quick-Lock joint and
Taper/Taper joint
Available in 3 oz. kit and 6
oz. kit
Bondstrand Bonder Training for PTSC M&C - 2009

19

Part-2 : AMERONs Bondstrand Products

Adhesive System
RP-48
A

two-part amine cured


epoxy resin system
Non-conductive
Use on Taper/Taper joint
Available in 3 oz. kit and 6
oz. kit

Bondstrand Bonder Training for PTSC M&C - 2009

20

Part-2 : AMERONs Bondstrand Products

Tools & Equipment

Special Tools

Other Accessories

Pipe Shaver & Power Drive


Heating Blanket
Band Clamp
Lever Hoist
Bore Polisher (Flapper Wheel)

Common Pipe Tools

Bondstrand Bonder Training for PTSC M&C - 2009

21

Special Tools Pipe Shaver & Power Drive


!!! Pipe Shaver: Machine of pipe end to obtain
appropriate spigot end for bonding, shaver shall be
selected based on type of joint, pipe diameter, with
consideration of total project scope.
B-1F Shaver: , , 1, 1 , 2, 3, 4, 5 & 6

To individual size only;


Straight Spigot (For QuickLock Joint) only.
Driven by common electrical
tools or air tools, such as hand
drill.

Cutting Insert

For detail guide, See FP376F, Ameron B-1F Pipe End Preparation Tool
Bondstrand Bonder Training for PTSC M&C - 2009

22

Special Tools Pipe Shaver & Power Drive

M-74 Shaver
For 2 16 pipes
Use with arbor set
Straight Spigot (For
Quick-Lock Joint) only.
Driven by hand or
electrical tools (RIDGID700).

For detail guide, See FP696A, M-74 Pipe Shaver


Bondstrand Bonder Training for PTSC M&C - 2009

23

Special Tools Pipe Shaver & Power Drive


Maintenance

and Store

Shall be kept in original tool box after use;


Keep it in dry location, away from rain and
moisture;
Do not use oil and/or grease as dust will
accumulate on oil and grease;
Remove of dust/dirt using brush.

Bondstrand Bonder Training for PTSC M&C - 2009

24

Special Tools Heating Blanket


!!! Heating Blanket: For accelerating joint curing, as
well as preheat of jointing surface

Available in 115V and 230V, to be specified;


Size depends on pipe size;
Equipped with thermostat;

For 1 to 28 Pipe

Bondstrand Bonder Training for PTSC M&C - 2009

For 30 to 40 Pipe
25

Special Tools Heating Blanket

Description of Heating Blanket

Bondstrand Bonder Training for PTSC M&C - 2009

26

Special Tools Heating Blanket

Using Heating Blanket

Wrap the pipe using the


end with thermostat;
Tie down accessory
shall be used;
Do NOT pull the cable;

Bondstrand Bonder Training for PTSC M&C - 2009

27

Special Tools Heating Blanket


Packing,

Storage and Transporting

Always roll up the heating blanket when not in used;


Do NOT pack and transport heating blanket in folded
form;
Any heavy object fall on it may damage the heating
blanket;

Bondstrand Bonder Training for PTSC M&C - 2009

28

Other Accessories
Band

Clamp with D-Rings

Shall be used when making joints, Quick-Lock,


Taper, Mechanical O-Ring,
Available in 2 width x 6 length, and
Available in 2 width x 13 length, and
Available in 3 width x 13 length

Bondstrand Bonder Training for PTSC M&C - 2009

29

Other Accessories
Lever

Shall be used when making joints,


Quick-Lock, Taper, Mechanical ORing,
Available in Ton and 1 Ton,

Alternatively, ratchet puller (chain


block) can be used

Bore

Hoist

Polisher (Flapper Wheel)

Sanding bonding surface


Grid 40~60
Driven by electrical drill or air tool

Bondstrand Bonder Training for PTSC M&C - 2009

30

Common Piping Tools


There are many other common piping tools might be
required for fiberglass piping fabrication and installation
work, such as:

Hacksaw or abrasive wheel;


Paint marker;
Pipe wraparound;
Baby grinder;
Electric or Air drill;
Level Gauge;
Paint Brush;
Nylon/Rubber Mallet;
Bondstrand Bonder Training for PTSC M&C - 2009

Cotton Roller;
Adjustable Pipe Stands;
Sanding Disc;
Screw Driver;
Scissors;
Air Release Roller;

31

Part-3 : HSE & Product handling


!!! To prevent injuries & occupational diseases,
property damages through needless industrial
accidents and inefficient environment via waste
management.

Personal Protection Equipment (PPE)


Chemical and Dust Hazards

Bondstrand Bonder Training for PTSC M&C - 2009

32

Personal Protection Equipment (PPE)


!!! PPE is any device or appliance designed to be worn
by an individual when exposed to one or more health
and safety hazards.

Overall
Safety Helmet
Safety Boots
Safety Glasses
Gloves
Dust Mask
Etc

Bondstrand Bonder Training for PTSC M&C - 2009

33

Chemical and Dust Hazards


!!! Resin, curing agent, catalyst, adhesive and other
chemical products could cause irritation, some could
be harmful to eyes.

Quick access to water in case of chemical contact !!


No eating, drinking and smoking during handling of
above products;
Maintain personal hygiene at all time;
Safe glasses during handling above products;
Dust mask to prevent inhalation of glass-fiber dust;
Long sleeve shirts with long pants, or overall to
prevent skin irritation due to fiber dust;

Bondstrand Bonder Training for PTSC M&C - 2009

34

Chemical and Dust Hazards

Maintain personal hygiene at all time;


Do not rub or scratch irritated area if occurred;
Shower in lukewarm water with soap and a
washcloth at days end to remove loose fiber;
Wash work clothes separately;
Good ventilation in workplace to keep dust
concentration below the MAC value (10mg/m3);
Rinsing workplace with water or sweeping with
brushes or brooms;
Refer to relevant MSDS and product literature for
unfamiliar products.

Bondstrand Bonder Training for PTSC M&C - 2009

35

Receiving and Handling


!!! GRP piping components can be susceptible to
mechanical damage from impact, sharp edges or
scratching. Special consideration should be given to
protecting components and to ensuring that all
personnel involved are given training in the relevant
procedures. ISO14692-4:2002

Goods Receiving Inspection


Handling and Transportation
Storage

Bondstrand Bonder Training for PTSC M&C - 2009

36

Good Receiving Inspection

Verify goods receiving conform to shipping and


packing document and compliance to purchase order.
Packing condition.
Spools and components condition.
Adhesive Kits condition including shelf life, visible
damage and/or leaking, completeness of kit packing.
Reporting of any deviation and/or issue.
FP167D, Shipping, Handling, Storage and Inspection
of Bondstrand Fiberglass Pipe.

Bondstrand Bonder Training for PTSC M&C - 2009

37

Handling and Transportation

Handling and Transportation

Proper support and protection with protection pad.


Securely fastened.
Forklifts should have at least a 6-foot carriage,
spacer of at least 2-inch thickness are located.
Fittings shall be loaded onto pallets, crates or
baskets with sufficient protection.
3m or less pipe and spool could be lifted by single
4 wide canvas or suitable plastic.
Pipe and spool greater than 3m (in length) shall be
lifted in using two or more canvas or suitable
plastic.
Bondstrand Bonder Training for PTSC M&C - 2009

38

Handling and Transportation

Prohibitions

Being thrown or dropped from any height.


Using chains, wire ropes or clamps for lifting

Bondstrand Bonder Training for PTSC M&C - 2009

39

Storage
!!! Carrying out inspection for good storage preparation and
carrying out periodical inspection.

Fiberglass Pipe

Well supported (side support and spacer support), not more


than 10-ft Interval, 6-ft from each end, the support should
have 4-in wide bearing surface.
Side supports; not exceed 5-ft height; proper tie down.
Protective end cover must be in place.

Bondstrand Bonder Training for PTSC M&C - 2009

40

Storage

Fiberglass Fitting and Accessories

Fiberglass Fabricated Spools

Shall be kept in shipping box/pallet.


Protective end cover must be in placed.
Accessories such as Nylon Key and O-Ring, shall be kept
in shed store.

Shall be kept in shipping pallet or skid.


End cover / protection shall not be removed until
installation.

Adhesive Kit, Resin and Curing Agent

Shall be kept in original packing.


Shall be kept in specified control condition.
Shall be used before expiry date.

Bondstrand Bonder Training for PTSC M&C - 2009

41

Part-4 : Fabrication and Installation

Drawings
Product data & Pipe length calculation
QC form : Log sheet
Fabrication and Installation Tolerances
Hook-up to Equipment / Other Material

Bondstrand Bonder Training for PTSC M&C - 2009

42

Drawings

Spool Drawing

Isometric Drawing

Contain all details of design (Pressure, fluid, system,


temperature,..), fabrication and erection (Materials),
installation (Coordinates, connections) and testing.

Layout Drawing

Contain detail dimensions, fabrication materials, and


erection materials.

Background, surrounding, piping routing, supporting,


interface, equipment, etc.

Piping and Instrument Diagram

Principle such as size, flow direction, design


information, materials specification.

Bondstrand Bonder Training for PTSC M&C - 2009

43

Sample Drawing Spool 1

Bondstrand Bonder Training for PTSC M&C - 2009

44

Sample Drawing Spool 2

Bondstrand Bonder Training for PTSC M&C - 2009

45

Sample Drawing Spool 3

Bondstrand Bonder Training for PTSC M&C - 2009

46

Sample Drawing ISO

Bondstrand Bonder Training for PTSC M&C - 2009

47

Sample Drawing Layout

Bondstrand Bonder Training for PTSC M&C - 2009

48

Product data & Pipe length Calculation

Product data

Assembling dimension of fittings

Pipe length calculation

To produce pipe cutting table


To calculate pipe length for spool adjustment
To verify installation

Exercise : calculate pipe length.

Bondstrand Bonder Training for PTSC M&C - 2009

49

QC Form : Log sheet

To record bonding history for fabrication and site


installation
Part of QC documentation

Bondstrand Bonder Training for PTSC M&C - 2009

50

Fabrication and Installation Tolerances


Good tolerances control could ensure success in installation;
reduce the possibility of leak at field joint; reduce the
possibility of damage due to force on mismatched pipes;
reduce/eliminate modification work,

Recommended Fabrication Tolerances


Installation Dimensional Tolerances

Refer to tolerance of different type of joints such as


flange joint, mechanical o-ring joint.
Project specification

Bondstrand Bonder Training for PTSC M&C - 2009

51

Recommended Fabrication Tolerances


1.

2.

3.
4.
5.
6.
7.

Bondstrand Bonder Training for PTSC M&C - 2009

Face/center to face/center
dimension, or location of
attachment
Lateral translation of branch or
connection
Rotation of flange
End preparation
Alignment of flange face
Angular deflection
Reference: ISO14692-4:2002
52

Recommended Fabrication Tolerances


DN
(Inch)

Tolerances / Dimension Number


1 (mm)

2 (mm)

3 (Degree)

4 (mm)

5 (mm)

6 (Degree)

-8

0.5

0.5

10-12

0.3

0.5

14-16

0.3

1.6

0.5

18-24

0.3

2.0

0.5

26-36

0.2

2.4

0.5

40-48

0.15

2.4

0.5

Reference: ISO 14692-4:2002 and Ameron PF-01.


Bondstrand Bonder Training for PTSC M&C - 2009

53

Hook-up to Equipment / Other Material


To prevent damage to both equipment and fiberglass piping
system, attention shall be given when fiberglass piping is
hooked up to equipment and other piping materials.

Hook-up to Equipment
Equipment (Including fire hydrant, ballast eductor, .)
shall be independently anchored,
Allowable alignment to avoid excessive stress,
Control torque value strictly if equipment connection is
cast iron material,
Dismantle piece is recommended for testing and
equipment maintenance.

Bondstrand Bonder Training for PTSC M&C - 2009

54

Part-5 : Hydro-testing

Fabricated Spool Testing


System Hydro-testing

Bondstrand Bonder Training for PTSC M&C - 2009

55

Fabricated Spool Testing


Spool Testing is normally used to verify quality of
fabrication joints (if applicable).

Test pressure determination: 1.5 times of design pressure of


the weakest component on the spool.
Recommended Test Duration: 10 minutes
Special end blind/plug required for variety of spool end
configuration
Limitation: Some fabricated spools could not be tested due
to end configuration and size :

Spool with Taper Male end,


Spool with QL Female and Taper Female and greater than 16
.

Bondstrand Bonder Training for PTSC M&C - 2009

56

System Hydro-testing
System Hydrotesting is carried out on installed
piping system to verify fabricated joints, site joints,
as well as the integrity of the installed piping system.

Prior to Hydro-Testing

All piping supports must be completed;


For underground piping, sufficient partial backfill and
temporary block must be in place to prevent excessive
movement;
High point vents / low point drains in place;
Removing/isolating components that shall be excluded
from hydro-testing;

Bondstrand Bonder Training for PTSC M&C - 2009

57

System Hydro-testing

Test Pressure

1.5 times of design pressure


1 hour holding minimum, or sufficient time to carry out
line check, or project specification whichever is longer

Testing Equipment

Quick closing valve and booster pump without suitable


control shall not be used, to avoid surge;
Pressure gauges and instrument must be calibrated;
Appropriate pressure gauges shall be selected, the test
pressure shall be between 30% to 75% of reading range
If possible, pressure recorder shall be used;

Bondstrand Bonder Training for PTSC M&C - 2009

58

System Hydro-testing

Hydro-Testing

Pressure build up process:


The test pressure shall be raised over a period of
30minutes of longer.
Slowly and gradually to allow for equalizing for
strain, and also in stages to allow for inspection.
Inspection
Instrument reading
Visual inspection of joints, pipes and fittings
24 hour holding @ 1.1 design pressure (ISO14692:4)
Acceptance criteria
No sign of leaking or weeping
No significant pressure lost

Bondstrand Bonder Training for PTSC M&C - 2009

59

System Hydro-testing

Possible causes of pressure change

Effect of joint expansion and material creep;


Effect of temperature (Morning, afternoon, night, under
sun, and so on), take precaution to prevent over-pressure

Other Concerns

Glycol antifreeze shall be added when test is carry out


in subzero temperature.
Instrument to prevent from buckling in case of sudden
depressurization
Safety aspects, such as qualified operator, signs and
notices, operation procedures . Shall be in placed.

Reference: AME/INS-004 Hydro-Testing Procedure for


Bondstrand GRE / GRV Pipe
Bondstrand Bonder Training for PTSC M&C - 2009

60