METODE PENAMBANGAN
METODE
Tambang Bawah Tanah
Dosen : Meinarni Thamrin
PEMBAGIAN METODE
TAMDA
TAMBANG DALAM / TAMBANG BAWAH
TANAH (UNDER GROUND MINE) terdiri dari
3 (tiga) metode :
1. Metode Swa Sanggah (Non Supported/ Open
Stope Methods) Menurut teknik
penambangannya dibagi 4 (empat) metode :
Gophering
Underground gloryhole
Shrinkage Stoping
Sub Level Stoping
Saturday, December 13, 2014
by : Meinarni Thamrin
Model Model
SKETSA SWA
SANGGA
BENTUK SWA
SANGGAH
Shrinkage Stoping
Sub Level
Stoping
Tambang Bawah
Tanah..
2. Metode dengan Penyanggaan
(Supported Stope Methods) Menurut
teknik penambangannya dibagi atas 4
(empat) metode :
Cut and Fill Stoping
Stull Stoping
Square Set Stoping
Shrink Fill Stoping
by : Meinarni Thamrin
MODEL METODE
MODEL-MODEL
PENYANGGAH
MODEL-MODEL
STOPE/LOMBONG PADA TAMDA
CUT AND
FILL
Tambang Bawah
Tanah
3. Metode Ambrukan (Caving Methods)
Terdiri dari 3 (tiga) metode, yaitu :
Top Slicing
SubLevel Caving
Block Caving
by : Meinarni Thamrin
18
Sketsa
MODEL SISTEM
AMBRUKAN
SISTEM
AMBRUKAN
Metode Ambrukan
(Top Slicing)
MODEL Sublevel
Caving
MODEL BLOCK
CAVING
MODEL ORE
PASS
Underground Mining
Equipment
Locomotives
Drills
Coal Scoops
Loaders
Slushers (Scrappers)
Rock Dusters
Mine Hoists
LHDs (Load Haul Dumps)
JumbosRoof Bolters
Longwall Equipment
Tunnel/Raise BorersVentilation Equipment
Continuous Mining Systems
and more
by : Meinarni Thamrin
29
by : Meinarni Thamrin
30
by : Meinarni Thamrin
31
by : Meinarni Thamrin
32
by : Meinarni Thamrin
33
by : Meinarni Thamrin
34
by : Meinarni Thamrin
35
by : Meinarni Thamrin
36
by : Meinarni Thamrin
37
by : Meinarni Thamrin
38
by : Meinarni Thamrin
39
by : Meinarni Thamrin
40
by : Meinarni Thamrin
41
by : Meinarni Thamrin
42
by : Meinarni Thamrin
43
by : Meinarni Thamrin
44
Lift Vehicle
Saturday, December 13, 2014
by : Meinarni Thamrin
45
by : Meinarni Thamrin
46
by : Meinarni Thamrin
47
Sketsa
by : Meinarni Thamrin
49
Room and
Pillar
Long Wall
ALAT PEMOTONG
TIANG PENYANGGAH
MODEL-MODEL /SKETSA
PEMBUATAN TEROWONGAN
PADA TAMDA
PT.FREEPORT, PAPUA
PEMBORAN PADA
TAMDA
MODEL
STOPE/LOMBONG
PEMBUATAN TUNNEL
MODEL-MODEL
TEROWONGAN BAWAH
TANAH