Anda di halaman 1dari 40

MOP013 2G FlexiEDGE

BTS Installation
Version 2.1

Partner Excellence Center


Project Support Center, Indonesia

CONTENTS:
i. BTS Installation Preparation

A.
B.
C.
D.
E.

Stack configuration installation procedure


Wall-mount configuration installation procedure
Pole-mount configuration installation procedure
Appendix
References

Partner Excellence Center


Project Support Center, Indonesia

i. BTS INSTALLATION PREPARATION:


1. Installation tools and equipment
2. Safety equipment
3. Documents
RNP Report
Parameter Entry Sheets (PES)
Microwave Link Plan (MWLP)
Nokia FlexiEDGE BTS manual
MOP013 2G FlexiEDGE BTS Installation
MOP015 2G FlexiEDGE BTS Installation: Pole-mount

4. FlexiEDGE BTS Installation activity must be performed by certified field


techs with PTID.

Partner Excellence Center


Project Support Center, Indonesia

A. STACK CONFIGURATION INSTALLATION PROCEDURE


OVERVIEW
1.
2.
3.
4.
5.
6.
7.
8.

9.
10.
11.
12.
13.

14.
15.
16.
17.
18.

Install plinth on floor


Connect BTS main grounding cable to
plinth and site main grounding bus bar
Install module casing
Install FlexiEDGE hardware modules
Install external cable entries
Install the module grounding cables
Install the external power cables
Connect the Dual Duplexer module cables
to respective Dual TRX modules at
connector port ER_ _.
Install the internal bus cables
Install the external power cables
Install the Tx and Rx cables
Install the antenna jumper cables
Install the antenna jumper cables to
vertical cable trays
Install the transmission cables
Install the external alarm cable
Install all BTS external cablings
Install covers
Install all labels

Partner Excellence Center


Project Support Center, Indonesia

Instruction:
1. Install plinth on floor
> With fan maintenance clearance
> 4 bolts to floor
> Rear stopper is open

Partner Excellence Center


Project Support Center, Indonesia

Instruction:
2. Connect BTS main grounding cable to plinth
and site main grounding bus bar.
> grounding cable diameter = 16mm

Partner Excellence Center


Project Support Center, Indonesia

Instruction:
3. Install module casings
> EMHA for configuration 2+2+2
> EMTA for extension TRX in
configuration 3+3+3 or 4+4+4

Partner Excellence Center


Project Support Center, Indonesia

Instruction:

FlexiBTS 2+2+2 Configuration

4. Install Flexi EDGE modules


> start from bottom to top

S3

S2

S1

Partner Excellence Center


Project Support Center, Indonesia

FlexiBTS 3+3+3 / 4+4+4 Configuration

Installation of Wideband Combiner Module


EWxx:

S3

S2

S1

A
Partner Excellence Center
Project Support Center, Indonesia

Instruction: 5. Install external cable entries


ESMA
KANAN

SECTOR
KANAN

KABEL EXTERNAL ALARM

KABEL TRANSMISI

KABEL INTERNAL BUS,


KABEL INTERNAL POWER

ESMA
KIRI

Partner Excellence Center


Project Support Center, Indonesia

SECTOR
KIRI

Instruction:
6. Install the module grounding cable.
> one module per casing grounding
connection
> cable routing in right side cable entries
> connect from plinth to ESMA
> connect from plinth to EXxA
> secure grounding cables with cable ties to
fixing points on the side

Partner Excellence Center


Project Support Center, Indonesia

FlexiBTS module grounding (2+2+2)

Partner Excellence Center


Project Support Center, Indonesia

FlexiBTS module grounding (3+3+3 / 4+4+4)

Instruction:
7. Install external power cable
> use of 35mm DC cable
> crimp terminal lugs and put heat-shrink
tubes
> connect to ESMA terminal V48(+/-)
> cable routing at right side of ESMA
external cable entry
> install two (2) cable straps to secure
power cable. Secure with additional cable
ties.
> use conduit for outdoor installations.

Partner Excellence Center


Project Support Center, Indonesia

Instruction:
8. Connect the Dual Duplexer Module cables
to respective Dual TRX Module at
connector port ER_A.
> connected to main Dual TRXs
EXxA 1
EXxA 3
EXxA 5

Warning:
Do not install Dual Duplexer Module cable in
extension TRX in configurations: 3+3+3 or
4+4+4.

Partner Excellence Center


Project Support Center, Indonesia

Instruction:
9. Install the internal bus cables
> cable routing to left-side external cable entries
FlexiBTS internal bus cabling 2+2+2

Partner Excellence Center


Project Support Center, Indonesia

FlexiBTS internal bus cabling (3+3+3 / 4+4+4)

Instruction:
10. Install the internal power cables
> cable routing to left-side external cable entries
FlexiBTS internal power cabling 2+2+2

Partner Excellence Center


Project Support Center, Indonesia

FlexiBTS internal power cabling (3+3+3 / 4+4+4)

Connecting internal bus, internal power and dual


duplexer connectors

Partner Excellence Center


Project Support Center, Indonesia

Connecting internal bus, internal power and dual


duplexer connectors IP55 covers

Grooming of internal cables

Partner Excellence Center


Project Support Center, Indonesia

Instruction:
11. Install Tx and Rx cables

FlexiBTS Tx/Rx cabling 2+2+2

Partner Excellence Center


Project Support Center, Indonesia

FlexiBTS Tx cabling (3+3+3 / 4+4+4)

Extension TRX

Partner Excellence Center


Project Support Center, Indonesia

FlexiBTS Rx cabling (3+3+3 / 4+4+4)

Extension TRX

Partner Excellence Center


Project Support Center, Indonesia

Use of internal cable entry

Partner Excellence Center


Project Support Center, Indonesia

Instruction:
12. Install the antenna jumper cables
> cable routing to right-side external cable entries
FlexiBTS antenna jumper cabling 2+2+2

Partner Excellence Center


Project Support Center, Indonesia

FlexiBTS antenna jumper cabling (3+3+3 / 4+4+4)

Installation of antenna cables

Partner Excellence Center


Project Support Center, Indonesia

Information: Antenna feeder system connection matrix


Ant A

Ant B
Cable tray and feeder
positioning
ERxA 5

ERxA 3

ERxA 1

SECTOR

ANTENNA

SECTOR 1
SECTOR 2
SECTOR 3

Partner Excellence Center


Project Support Center, Indonesia

ANT 1
ANT 1
ANT 2
ANT 2
ANT 3
ANT 3

ANTENNA
FEEDER NO.
PORT
-45
1
+45
2
-45
3
+45
4
-45
5
+45
6

FEEDER
LABEL
4110
4112
4120
4122
4130
4132

BTS Rack
BTS 1
BTS 1
BTS 1
BTS 1
BTS 1
BTS 1

Sector 1

Sector 2

Sector 3

Tx /
Rx Main

Tx /
Rx Div

DUPLEXER
NO
ERxA 1
ERxA 1
ERxA 3
ERxA 3
ERxA 5
ERxA 5

DUPLEXER
PORT
Ant A
Ant B
Ant A
Ant B
Ant A
Ant B

Instruction:
13. Install antenna jumper cables to vertical
cable trays
> fix cables with clamp or cable ties
> maximum length of fabricated jumper
cable = 6 meters
VERTICAL
CABLE TRAY

Partner Excellence Center


Project Support Center, Indonesia

Instruction:

FIPA:

FIFA:

Partner Excellence Center


Project Support Center, Indonesia

14. Install transmission cables


> cable routing to right-side ESMA
external cable entry
> secure transmission cables with cable
ties

Instruction:
15. Install external alarm cable
> cable routing to right-side ESMA cable
entry
> secure external alarm cable with cable
ties

Partner Excellence Center


Project Support Center, Indonesia

Information: Two types of external alarm cabling in


Flexi BTS
a. Using FSAA external alarms cable:
EXTERNAL ALARM 1
EXTERNAL ALARM 2
EXTERNAL ALARM 3

*
EXTERNAL ALARM N

FSAA CABLE

b. Using FSEB module and FSEB external alarms cable:

FSEB
FSEB EXTERNAL
ALARM CABLE

D-37 CABLE

Partner Excellence Center


Project Support Center, Indonesia

EXTERNAL ALARM 1
EXTERNAL ALARM 2
EXTERNAL ALARM 3

*
EXTERNAL ALARM N

Information: External alarm configurations


For BTS Indoor:

Partner Excellence Center


Project Support Center, Indonesia

For BTS Outdoor (with outdoor rectifier)


JABOTABEK:
1 - MAINS FAIL
2 - RECTIFIER MODULE ALARM
3 - FUSE BATTERY
4 - LOAD FUSE
5 LOW BATTERY

WEST JAVA:
1 - MAINS FAIL
2 - RECTIFIER MODULE ALARM
3 - FUSE BATTERY
4 - HIGH TEMPERATURE
5 LOW BATTERY

Partner Excellence Center


Project Support Center, Indonesia

ESM EAC interface


pin assignment

Partner Excellence Center


Project Support Center, Indonesia

Flexi System Alarm cable (FSAA) pin color mapping:

Partner Excellence Center


Project Support Center, Indonesia

Using FSEB:
FSEB
FMAA

Partner Excellence Center


Project Support Center, Indonesia

Connection to ESMA

Partner Excellence Center


Project Support Center, Indonesia

Connections to EAS DDF

Connection ESMA to FSEB

Partner Excellence Center


Project Support Center, Indonesia

Connection FSEB to External Alarms DDF

SIG

Partner Excellence Center


Project Support Center, Indonesia

GND

Instruction:
16. Install all the rest of the BTS external cabling
BTS EXTERNAL CABLING
CABLING ITEM

Connection Point 1

CABLE SUPPORT AND ROUTING


INDOOR

Antenna jumper cable

ERxA - Ant A

MAIN
Antenna jumper cable

ERxA - Ant B

DIV
BTS DC cable (blue)

BTS DC cable (black)

BTS grounding cable

ESMA V48 (-)

ESMA V48 (+)

plinth

Connection Point 2

OUTDOOR

Cable Tray

Cable Tray

Cable Ties - White

Cable Ties - Black

Cable Tray

Cable Tray

Cable Ties - White

Cable Ties - Black

Cable Tray

Cable Tray

Cable Duct

Conduit

Cable Ties - White

Cable Ties - Black

Cable Tray

Cable Tray

Cable Duct

Conduit

Cable Ties - White

Cable Ties - Black

Cable Tray

Cable Tray

Cable Duct

Cable Ties - Black

Feeder cable - Main

Feeder cable - Diversity

Rectifier breaker switch 63A

Rectifier bus bar (+) terminal

Equipment grounding bus bar

Cable Ties - White


EAC cable

PCM cable E1

Flexbus cable

ESMA EAC interface

FIPA E1 interface

FIFA flexbus interface

Cable Tray

Cable Tray

Cable Duct

Conduit

Cable Ties - White

Cable Ties - Black

Cable Tray

Cable Tray

Cable Duct

Conduit

Cable Ties - White

Cable Ties - Black

Cable Tray

Cable Tray

Cable Duct

Cable Ties - Black

FSEB / EAS LSA

TRS LSA

Flexihopper (Plus) Outdoor Unit

Cable Ties - White


LSA frame ground cable

LSA frame

Cable Tray

Cable Tray

Cable Duct

Cable Ties - Black

Cable Ties - White

Partner Excellence Center


Project Support Center, Indonesia

Equipment grounding bus bar

Information: General cabling preparation


ANTENNA JUMPER CABLE (Manually fabricated)

RF/ RFF

BTS DC Cables

35 mm

35 mm

Grounding Cable

6, 16, 25, 35 mm

-> Heat shrink tube

Partner Excellence Center


Project Support Center, Indonesia

BTS alarm cable

FSAA

PCM Cables (E1)

Flexbus Cable

RG 214, RG 223

-> Heat shrink tube

Partner Excellence Center


Project Support Center, Indonesia