M.M.Kamath
Former Chief Engineer NMPT
Dredging is an
Ancient Art
But a Relatively
Young Science
Dislodging
Raising
Handling and
Transporting
Soil Underwater
Classification of Dredging
Capital Dredging
Maintenance Dredging
Uses of Dredging
Creation of artificial depths for
ports and harbours.
Maintaining the depths in the
existing ports and harbours.
RECLAMATION-CONTAINMENT AREA
Classification of Dredgers
Mechanical
Hydraulic
Pneumatic and
Special Dredging Equipments.
Mechanical Dredgers
Grab Dredger
Dipper Dredger
Bucket Dredger
Rock Breaker
Back-hoe Dredger
GRAB DREDGER
BUCKET DREDGER
BACKHOE DREDGER
Hydraulic Dredgers
Plain Suction Dredger
Cutter Suction Dredger
Pneumatic Dredgers
PNEUMA SYSTEM
AMPHI DREDGE
Fig 11
Fig 10
Bed-Leveller
50
30
10
Bucket dredgers
Other dredgers
431
443
46
Barge Unloaders
23
63
Bucket Dredgers
104
212
231
11
Auger Dredger
ROCK BREAKING
Mechanical
-
Rock Ripping
Direct Dredging
Chemical
- Surface Blasting
Slab Charges
Shaped Charges
SHAPED CHARGE
Standards
There are no Indian standards relating
to dredging.
B.S.6349 : Part -5 : 1991 British
CLASSIFICATION OF MATERIALS
TO BE DREDGED
Cohesive soils such as clay, silt etc.
Non cohesive soils such as sand,
gravel etc.
Consolidated cohesive soils which
Fine Silt
Sand
Sand
Fine Silt
Soft Clay
Sand
2.30 - 2.70
2.70 - 3.50
Soft Clay
Medium Clay
Medium Gravel
Soft Clay
Medium Gravel
Coarse Gravel
Stiff Clay
3.50 - 4.00
Hard Clay
Medium
Gravel
Coarse Gravel Chalk
6.00 - 10.00
15.00 - 25.00
Chalk
Soft Rock
Hard Rock
(with blasting)
Hard Clay
Stiff Clay
Soft Rock
Hard Rock
Hard Rock
(with blasting) (With Blasting)
Areas of impact
Types of impact and
Measurement and its control.
Coast
and
3360
km
on
the
Capital Dredging
Plan Period
Quantity
(in million cum)
36
144
Maintenance Dredging
Plan Period
Quantity
(in million cum)
285
330
Rs.5000 million .
Quantity
(in million cum)
Cost
(in Rs. million)
Kandla
4.5
500
Mumbai (Average)
5.0
250
JNPT
1.5
150
Mormugao
3.5
120
New Mangalore
5.0
300
Cochin
11.0
350
Calcutta
21.0
3000
Paradip
2.5
200
Visakhapatnam
1.5
150
Chennai
1.5
150
Tuticorin
Nil
Nil
Total
57
4990
Mobilisation and
De-mobilisation
of Dredging Equipment
Case Studies
THE WORLD