Sabah Oil and Gas Conference 2014

Talisman Malaysia
Increasing Growth Opportunities for Sabah
May 26th, 2014

Content

Overview of Talisman Energy


Sabah Growth Strategy
Securing a Foundation
Maximising Asset Recovery
Expanding through Exploration
Working with other Operators

Talisman Energy Global Operations


Two Core Regions : The Americas and Asia-Pacific

Core: Asia-Pacific

Generating
Generating free
free cash
cash flow,
flow,
near-term
near-term exploration
exploration potential
potential
Long
Long life
life assets
assets with
with high
high
netbacks
netbacks

Core:
Core: Americas
Americas

Resource
Resource plays
plays provide
provide
long-term
long-term growth
growth
Colombia
Colombia exploration
exploration and
and
development
development underway
underway

Other
Other areas
areas considering
considering all
all
options
options

UK
UK Sinopec
Sinopec deal
deal lowers
lowers exposure
exposure
Norway
Norway sales
sales process
process underway
underway
Kurdistan
Kurdistan Kurdamir
Kurdamir and
and Topkhana
Topkhana
appraisal
appraisal ongoing
ongoing

2014 production guidance 350-365 mboe/d

2013 2P reserves ~1640 mmboe

Core areas 324-334 mboe/d

Core areas ~1480 mmboe

Other 26-31 mboe/d

Other ~160 mmboe

NYSE : TLM | TSX : TLM

www.talisman-energy.com

Talisman Energy - Asia Pacific


A Core Talisman Region

Vietnam
Vietnam
HST/HSD
HST/HSD

Vietnam
Vietnam
Nam
Nam Con
Con Son
Son

Malay
Malay Basin
Basin

Sabah Basin

Tangguh
Tangguh
Papua
New Guinea

South
South Sumatra
Sumatra

Kitan/LamCor
Kitan/LamCor

Core areas
Additional Assets
Exploration

NYSE : TLM | TSX : TLM

500

1,000

Km
1,500

www.talisman-energy.com

Talisman Energy in Malaysia


Assets Overview
TLM block
Oil field
Gas field

Vietnam

Malaysia
PM-3 CAA (41% WI)
Unique cross-border development
Supplying gas to two nations
Talismans largest operated asset
Finalizing PSC extension

SB309 & SB310 (70% WI)


Gross exploration acreage 13,000 km2
3-4 well exploration program planned in
2014

Kinabalu (60% WI)


Operated effective 26 Dec 2012
Successful completion of 3 infill wells
Commencing redevelopment

Sabah

PM305 & PM314 (60% WI)

Peninsular
Malaysia

NYSE : TLM | TSX : TLM

SAA about 85% recovery to date


Studying options to extend field life

Sarawak

www.talisman-energy.com

Sabah
New Core Area anchored by Kinabalu
Kinabalu is a secure base with upside
recovery opportunities
Significant acreage in a prolific and
proven hydrocarbon province
Extensive infrastructure enhances
exploration monetization opportunities
for oil and gas
Potential Synergies with other
operators to optimise operation and
Development Plans

NYSE : TLM | TSX : TLM

www.talisman-energy.com

2012 Kinabalu Oil PSC


Overview
Kinabalu Location Map

Kinabalu Block Details


Block: SB1 Kinabalu

Samarang Complex
(PCSB*)

2012 Kinabalu Oil PSC:


Start Date: Dec 2012 (20 years license)
Operator: TLM (60%)
Partner: PETRONAS Carigali (40%)
Location
55 km NW of Labuan

KNAG
(PCSB)

28 km SW of Samarang

Kinabalu KNDP-A

2 km SE of KNAG
Field Water Depth: 56 m

Labuan
LCOT (SHELL)

Discovery: 1989 and First Oil: Dec 1997


Cum. Oil Production @1/1/14 = 97 MMstb
20 Development Wells (20 active strings)
First PSC handover to International Operator
First progressive volume PSC to encourage brownfield redevelopment
First infill well : 9 months following transfer of operatorship
Redevelopment project, Concept Selection : 10 months following transfer of operatorship
NYSE : TLM | TSX : TLM

www.talisman-energy.com

2012 Kinabalu Oil PSC


Growth Strategy

Improve the
HSE
Performance
Improve Field
Reliability
Existing Platform
Debottlenecking
Project to be
completed in Q4
2014.

LP Separator

New Platform
New Facilities
Additional Infill
Drilling
Secondary Oil
Recovery

Well
interventions
Six Infill wells
approved
Double Field
Production
within one year

Exploration
Success
Potential
Synergies with
PETRONAS
Carigali in Sabah

KN 114st

Within Talisman Corporate Responsibility Standards


NYSE : TLM | TSX : TLM

www.talisman-energy.com

Managing Aging Infrastructure


It starts at the beginning
IDENTIFY
HAZARDS

DESIGN

CONSTRUCT

OPERATE
Decommission
Management of Change

INSPECT

Training & Competency


Cessation of
Production
Operations

MAINTAIN

VERIFY

Helideck Lighting Installation


NYSE : TLM | TSX : TLM

Crane serviced and recertified for man-riding

EMERGENCY
RESPONSE

Additional Escape Route

www.talisman-energy.com

Facilities Debottlenecking
Ready for Future Growth

Facilities Debottlenecking
Initial Infill Drilling programme and well
interventions increasing fluids throughput
Restrictions in liquid export rates
Preparation for additional offtake rates
once the full field redevelopment project is
implemented

Liquid Production Increase


Remove produced water prior to export
Convert LP Separator to 3 Phases
Equipment Integrity Improvement
Install Online Sand Removal System
Gas Production Increase
Modify LP Compressor to increase its
capacity to minimize flaring.

NYSE : TLM | TSX : TLM

10

www.talisman-energy.com

Field Rejuvenation
Maximising use of Existing Slots

Well 4
Well 3

Well 5

Main Fault Block


East Fault Block

Well 2
#3
#4
#5

Well 6

#1

#2

Well 1

#6

Note: All Wells Are Projected


NYSE : TLM | TSX : TLM

11

www.talisman-energy.com

Field Rejuvenation
Drilling Performance to date

No Recordable Incidents (LTI, RWI, MTI)


Excellent operational performance - benefit of established Rig
Contractor (20+ years in Malaysia)
Continuity of activity in Sabah Key to Performance
NYSE : TLM | TSX : TLM

12

www.talisman-energy.com

Kinabalu Redevelopment
Maximising Recovery Factor

A Team Approach : Project Success is driven by


the Integration of all Disciplines

NYSE : TLM | TSX : TLM

Consider Novel Cost/Schedule Saving


Schemes No Stone Unturned

13

www.talisman-energy.com

Kinabalu Redevelopment
Selected Concept Overview
Two Stage Development
Secondary Recovery Implementation
Increase field recovery factor to ~ 40%

Stage 1
(Early Production)
Installation of a 20
slot wellhead
platform (WHP)
bridge linked to
KNDP-A.
Maximum Use of
Existing KNDP-A

Scope

Estimated
1st Oil

4Q 2016

Stage 2
(Full Production)
Installation of a new CPP
bridge linked to the new
WHP
Gas Compression & Water
Injection

4Q 2017
(Estimated 1st Injection)

New Well Head Platform


NYSE : TLM | TSX : TLM

14

www.talisman-energy.com

Exploration Portfolio
SB310 & SB309 Prospects and Leads

NYSE : TLM | TSX : TLM

15

Partners: TML (70%), PCSB (30%)


PSC Signed; Effective Date - 26th
October 2009
Exploration period: 6 years
5 Commitment wells in SB310; 3 wells
in SB309

www.talisman-energy.com

South Sabah Synergies


A way of working between Operators

KNNAG accommodation
Helicopter Sharing
Marine Vessels
Spare Sharing
Subsurface Data Sharing
5 Year Integrated Plans
Warehousing

NYSE : TLM | TSX : TLM

Facilities optimization with KN


and Samarang
Gas utilization
Liquid handling
Debottlenecking

16

Area Development Plans


Maximise Utilisation of
Existing Infrastructure

www.talisman-energy.com

Corporate Responsibility within Talisman


Supporting our Growth Plans

Our Themes
Education
Health
Environment

NYSE : TLM | TSX : TLM

17

www.talisman-energy.com

Thank
You
NYSE : TLM | TSX : TLM

18

www.talisman-energy.com