SUBMITTED BY ,

ADAM SHA S ( 500026379)


MD MUJTABA RAFAT ( 500025329)
ASHISH PRABHAKR ( 500025260)
VYSHAKH.M.NAIR( 500025629)
SANJU ZACHARIAH ( 500025287)

NEED FOR METRO

Has one of Indias important port


Centre for higher education
Biggest shipping yard
Population density is 6300 persons
per sq. Km
Population of Cochin has been
growing at a rate of 1.4% per annum.

ADVANTAGE OF METRO
Requires 1/5th energy per passenger
km compared to road-based system
Causes no air pollution in the city
Causes lesser noise level
Is more reliable, comfortable and
safer than road based system
Reduces journey time by 50 to 75%.

PROJECT DESCRIPTION
Work on project began on 7th June
2013
Linking Alwaye to Petta
Route Length 25.360 Km
Number of Stations 23
The train frequency will be 5 min
headway with 3 - Car train in Alwaye
-Petta Corridor during peak hours and
15 min headway during lean hours.

TECHNICAL DESCRIPTION
OF PROJECT
Construction Methodology:Elevated
viaduct
carried
over
pre-stressed
concrete U/I shaped girders with pile /
open foundations
Rolling Stock:2.9 m wide modern
rolling stock with stainless steel body,
standard gauge axle load of 15 tones
Voltage:750 V DC

Continued
Power Supply Source:110Kv AC
Type of Signaling:Communication
Based Train Control (CBTC) with ATO
& ATP
Telecommunication:Integrated
system with Fiber Optic cables,
SCADA, Train radio, PA system etc.

SCOPE
Passengers/day
700000
600000
500000
400000
300000
200000
100000

Passengers/day

0
2015

2020

2025

2030

SCOPE
PHPDT
25000
20000
15000
10000
5000
0

2015

2020

2025

2040

PHPDT

SCOPE
Trip Length (Av. Km)
12
10
8
Trip Length (Av.
Km)

6
4
2
0

2015

2020

2025

2030

TRAFFIC
FORECAST
Year

Passenger
/ day

PHPDT

Trip Length
(Av. Km)

2015

381868

13681

7.33

468130

17663

8.469

2025

539427

21065

9.55

2030

600526

23621

10.02

2020

Traffic forecast

CARRYING CAPACITY OF
LIGHT RAIL VEHICLES

Driving Motor
Car

Trailer Car

3 Car Train

Norm
al

Crush

Norma
l

Crush

Norma
l

Crush

Seated

35

35

44

44

114

114

Standin
g

78

156

87

174

243

486

Total

113

191

131

218

357

600

BUDGET AND COST

LIFE CYCLE
S. No.

Item of Work

Completion Date

Obtain Central Government


Clearances

30.11.2011

Finalization of Major Contracts

29.02.2012

Execution of works and Procurement


of equipment, coaches and
Installations

01.04.2012
31.12.2015

Testing and Commissioning

01.01.2016
31.03.2016

Revenue Operation

31.03.2016

CURRENT PROJECT STATUS


75 % of Kochi metro rail pillars and
50 % of the work on metro stations
would be completed in 2014
A set of coaches is expected in
August 2015 and trial run would
begin in September
Earthwork is completed in March and
(the premises) will be ready for track
linking from October.

Cont..
Fifty

per

cent

of

the

structures

proposed in the depot would be


completed this year.
Construction

of

commence by June.

monorails

will

STAKEHOLDERS
Viaduct and Station Buildings
Viaduct and 6 Station Buildings from Aluva to
Kalamassery Larson & Toubro, Chennai
Viaduct and 6 Station Buildings from Kalamassery
to JLN Stadium Larson & Toubro, Chennai
Viaduct and 5 Station Buildings from JLN Stadium
to
Ernakulam
Junction
Station
-Soma
Enterprises Limited, Pune
Viaduct and 5 Station Buildings from Ernakulam
Junction to Petta -Era & Ranken (JV), New
Delhi.

Cont..
Modification to EHT Lines of
KSEB
Vindhya Telelinks Ltd, New Delhi
KE-1 to KE- 7
Red Star Constructions, Alappuzha
KE-8 (Muttom)

Power Supply and Traction


Ardanuy Ingenieria S.A, Spain.

DOCUMENTS AND
VARIANCE APPLIED
ON THE PROJECT

Firstly Alwaye to Tripunithura corridor was


to be constructed but after carrying out
the detailed engineering feasibility study
for this corridor, it was found that
construction of Petta to Tripunithura
section of this corridor is not feasible.
Accordingly, the ridership on truncated
corridor from Alwaye to Petta was worked
out which is marginally less from the
ridership of Alwaye to Tripunithura Corridor

Cont..
Corridor

PHPDT

Daily Readership in
2011

Alwaye to
Tripunithura

14589

404293

Alwaye to Petta

13681

381868

In view of the above, the Metro Corridor is


recommended from Alwaye to Petta for a
length of 25.360 km.

CONCLUSION
Viability of metro projects depends
upon correct defining of traffic
corridors,
technology
adapted,
availability of land, volume of traffic
carried, capacity utilization and
acceptance
of
mode
by
the
commuters.

REFERENCES
Kochimetro.org
en.wikipedia.org
Google.com

THANK YOU