STRUKTUR ORGANISASI PROYEK

WILMAR

PROJECT MANAGER

ANTOK SAPTODEWO
QC

SHEO

BUKHARI GIAWA

SUHERI

CONSTR. MANAGER

ACCOUNT. MANAGER

INDRAWAN SATI

IBRAHIM

SITE ENGINEER

GSP STR/ARS

STAF AKUNTANSI

REZA IBRAHIM

ZULPIKAR

OJT

STAF METODE

PELAKSANA / SP

UMUM

KHAIRIZAL SARUTAN

PAIRIN

YAHDA UGARA

QS / DRAFTER

GSP ME/ELEKTRONIKA

SECURITY

ZUL AYDI

SOUKI SOFAN

LOGISTIK

SURVEY

AGUS ARIS

NURIADI

PERALATAN

ASSISTEN SURVEY

SUHARWIN

AGUS
FADLAN AZHARI
ARFIAN FAUZI

PENBAR
NELSON MALAU

ISMADI
HASAN BASRI
MARDIANTO
HERMANTO
DIKETAHUI OLEH,

ANTOK SAPTODEWO
PROJECT MANAGER

PEMBANGUNAN GEDUNG WILMAR BUSINESS INSTITUTE

DENAH LOKASI
Ke Belawan

LOKASI PROYEK

PEMBANGUNAN GEDUNG WILMAR BUSINESS INSTITUTE

DENAH LOKASI
LOKASI PROYEK

lm
Tol Be
era

FO Citra Land
PTPP

Proyek
Citra Land
PTPP

Rencana Mall
Citra Land

PEMBANGUNAN GEDUNG WILMAR BUSINESS INSTITUTE

Note :

C
A

A : Kantor
Kontraktor
B : Toilet
C : Kantor MK
D : Gudang
E : Parkir Mobil
F : Parkir Motor
G : Pos Security
H : Los Kerja
Kayu
I : Los Kerja
Besi
J : Pabrikasi
Precast
K : Toilet Pekerja
L : Pintu Masuk
M : Ruang Genset

H
M
L
G

PEMBANGUNAN GEDUNG WILMAR BUSINESS INSTITUTE

TRAFFIC MANAGEMENT
Note :

KETERANGAN :
1.
TRUK MATERIAL
2.

MOBIL STAFF
JALUR LINTAS KENDARAAN
JALUR SEPEDA MOTOR

C
Catatan :
Jika pada situasi tertentu maka
akan ditugaskan petugas khusus
yang mengatur lalu lintas kendaraan
dilokasi yang dibutuhkan

A : Kantor
Kontraktor
B : Toilet
C : Kantor MK
D : Gudang
E : Parkir Mobil
F : Parkir Motor
G : Pos Security
H : Los Kerja
Kayu
I : Los Kerja
Besi
J : Pabrikasi
Precast
K : Toilet Pekerja
L : Pintu Masuk
M : Ruang Genset

H
M
L
G

PEMBANGUNAN GEDUNG WILMAR BUSINESS INSTITUTE

KETERANGAN :
-Pada proyek ini direncanakan memakai 1 unit Tower Crane.
Kontraktor merencanakan posisi Tower Crane R 65 m di lokasi luar lokasi bangunan dengan asumsi
kolam dikerjakan terakhir.
-Posisi TC diusahakan bebas hambatan agar bisa bergerak bebas

PEMBANGUNAN GEDUNG WILMAR BUSINESS INSTITUTE

LUAS LANTAI

PEMBANGUNAN GEDUNG WILMAR BUSINESS INSTITUTE

LUAS =
3.438 M2

PEMBANGUNAN GEDUNG WILMAR BUSINESS INSTITUTE

LUAS =
3.831 M2

PEMBANGUNAN GEDUNG WILMAR BUSINESS INSTITUTE

LUAS =
2.392 M2

PEMBANGUNAN GEDUNG WILMAR BUSINESS INSTITUTE

LUAS =
2.869 M2

PEMBANGUNAN GEDUNG WILMAR BUSINESS INSTITUTE

LUAS =
2.208 M2

PEMBANGUNAN GEDUNG WILMAR BUSINESS INSTITUTE

LUAS =
2.208 M2

PEMBANGUNAN GEDUNG WILMAR BUSINESS INSTITUTE

LUAS =
2.031 M2

PEMBANGUNAN GEDUNG WILMAR BUSINESS INSTITUTE

LUAS =
1.423 M2

PEMBANGUNAN GEDUNG WILMAR BUSINESS INSTITUTE

Brick Wall Paint Finish Duratex Ex. Propan +


NAT 4cm
Window Wall Tinted Glass
8mm, Frame Aluminium
Powder Coating

Brick Wall Paint Finish Duratex Ex. Propan + NAT 4cm

Window Wall Tinted Glass 8mm,


Frame Aluminium Powder Coating

Window Wall Tinted Glass 8mm, Frame Aluminium Powder Coating

Window Wall Tinted Glass


8mm, Frame Aluminium
Powder Coating
Column Finish ACP
Ex Alucosite t=4,5mm
Rangka Alum Hollow

Canopy Roof Galvalum Ex. Lysacht Klip-Lock, Combine with sky light, Lisplank Finishing ACP
Column Steel Pipe 200 mm Finish Duco

PEMBANGUNAN GEDUNG WILMAR BUSINESS INSTITUTE

Window Wall Tinted Glass 8mm, Frame Aluminium 4 Powder Coating

Brick Wall Paint Finish Duratex Ex. Propan + NAT 4cm


Window Wall Tinted Glass 8mm, Frame Powder Coating

Brick Wall Paint Finish Duratex Ex. Propan


Grooving (NAT) 10x10mm
Brick Wall Paint Finish Duratex Ex. Propan + NAT 4cm
Window Wall Tinted Glass 8mm, Frame Aluminium Powder Coating

Column Finish ACP Ex Alucosite t=4,5mm Rangka Alum Hollow


Window Wall Tinted Glass 8mm, Frame Powder Coating

Canopy Roof Galvalum Ex. Lysacht Klip-Lock,


Combine with sky light, Lisplank Finishing ACP
Column Finish ACP
Ex Alucosite t=4,5mm
Rangka Alum Hollow

Window Wall Tinted Glass 8mm,


Frame Aluminium 4 Powder
Coating

Column Finish
ACP
Ex Alucosite
t=4,5mm
Rangka Alum
Hollow

Brick Wall Finish ACP + Ornamen,


Aluminium Profil 30x100 Powder Coating

PEMBANGUNAN GEDUNG WILMAR BUSINESS INSTITUTE

PEMBANGUNAN GEDUNG WILMAR BUSINESS INSTITUTE

PEMBANGUNAN GEDUNG WILMAR BUSINESS INSTITUTE