CONTENTS
Introduction of project.
Project specifications.
Site observations:
Site clearance and excavation.
Foundation.
Columns.
Beams and slabs.
Masonry walls.
Electric conduiting.
Plastering .
Flooring.
Distempering.
INTRODUCTI
ON
PROJECT
SPECIFICATIONS
= 45 acres.
= 14 blocks.
Area of a block
= 28 flats.
No. of villas
Area of a villa
= 42 villas.
= 2200 sq. ft.
Landscaping area
= 16 % of site area.
Road width
= 40 ft with 16 ft parking.
= 300 crores.
SITE
OBSERVATIONS
Site clearance:--
All the unwanted things like trees, stones etc are removed and site is perfectly
leveled.
Site clearance can be done manually or by using machines likes tractor etc .
Methods of excavation:-Manually
Mechanically
At my training site the excavation was done mechanically with the help of
excavator.
Excavation work
FOUNDATION
Foundation is the part of structure which is in direct contact with ground and
transmit the loads of structure to the ground.
= 4 inches
Raft Foundation:-Common foundation for all the columns and walls, provided to spread loads of
the structure to a larger area.
Raft foundation is provided to increase the bearing power of soil.
Raft foundation is constructed by providing a R.C.C. slab on a concrete bed
At my training site raft foundation was used in apartment blocks.
= 6
= M25
= 50mm
RAFT FOUNDATION
FOUNDATION
SIMPLE
COLUMN
Column is a vertical member provided to transfer the load of structure to the
foundation .
=
9x18 & 9x24
=
8 bars of 25 mm dia in ground floor columns
=
40mm
=
M25
Steps of Casting of
columns:--
Column starter
verticality check
Reinforcement
concreting
Shuttering
BEAM AND
SLAB
Reinforcement of slab
(8mm dia bars @ 6)
Reinforcement of beam
(16mm dia bars with 8mm
dia bar stirrups @ 6)
Electric conduits
Development length of
column (Ld = 60xdia)
MASONRY
Masonry is the building of structures from individual units which are bound together
by mortar.
Vertical joint
(10 12mm)
English bond
ELECTRIC
CONDUITING
Electric conduiting is the process of making chases and fitting the electric
conduits in a building.
General data for making chases:- depth of horizontal chases 1/6 of wall thickness
Depth of vertical chases
1/3 of wall thickness
After making chases the pipes should be properly fitted with the help of wires
&nails or with the help of pipe holders.
PLASTERIN
G
A thin mortar covering applied on the surface of walls and ceilings to make the
surface smooth and to develop decorative effects.
= 1:4
= 20mm
Plastering tools:--
Trowel
Plastering
Straight Edge
Scratching
Tool
FLOORING
Floor is the lower most surface of a room on which one may stand or walk.
steps of flooring
work :--
SOLING
PLATE VIBRATOR
P.C.C
DISTEMPERING
Distemper is applied on the plastered surfaces to create smooth surface.
THANK
YOU