Aquatic Trash

In Situ Measurement

xtensive visual evidence of trash


long our creek & river banks

Little no measurement of
waterborne trash concentrations

Need systematic, long term measurement to assess


ources, trends

reek/river bank trash measurements small fraction


f aquatic trash flowing in our waterways

Need in situ measurements to determine mass of


quatic trash flowing past specific location

Lets look at some aquatic


trash measurement options:

Bank trash surveys


K ODay
Media

Full capture & count


Sample & count
3/30/2015

K O'Day

Aquatic Trash
In Situ Measurement Techniques

1. Full Flow Capture & Count: Nash Run (Md) Trash Trap

3/30/2015

K O'Day

Nash Run Trash Trap


(2014 Version)

View from above trap

View from below trap

Nash Run watershed 460 acres

3/30/2015

K O'Day

Aquatic Trash
In Situ Measurement Techniques

. Full Flow Capture & Count: Floating Bandalong Trash Trap

3/30/2015

K O'Day

Aquatic Trash
In Situ Measurement Techniques

Full Flow Capture & Count: Boom (Backriver, Md)

3/30/2015

K O'Day

Aquatic Trash
In Situ Measurement Techniques

b1. Sample & Count: Manta Trawl Towed by Boat

3/30/2015

K O'Day

Aquatic Trash
In Situ Measurement Techniques

mple & Count: Manta Trawl Suspended in Los Angeles River (Algalita Marine R

3/30/2015

K O'Day

Aquatic Trash
In Situ Measurement Techniques

Sample & Count: Natural Trash Trap Examples Tacony Creek

Branches make excellent flowing


plastic film sampling devices.
Lets borrow this approach for
aquatic plastic bag sampling
technique
3/30/2015

K O'Day

Plastic Bag/ Film Trap

Plastic Bottle Trap


Connection to Bridge
Flotation Ring

o
o
o

Coarse mesh on 4 sides to


trap floating plastic
Upstream & top faces open
Wide mesh to minimize
trapping vegetation and small
non-bottle debris

Riverbed Block

3/30/2015

K O'Day

Design Competition
suring Schuylkill River Plastic Load
Falls Bridge Trash Trap
Goal:

gn an in-river floating plastic trash trap


ovide source data collection to allow estimation
ong term plastic loads in the Schuylkill Basin
ream of the Falls Bridge.
Approach

ch temporary trash traps to Falls Bridge to


ct both floating plastic bags and plastic bottles.

trap designs must have minimal impact on river


and navigation, must be easily and quickly removable
be rugged enough to withstand Schuylkill River flow
itions.

traps would only operate in warm weather


itions and would be removed prior to predicted
or flood level flows and during winter period.

designs must provide information on both


llation/ removal of device and how trapped plastic
is will be safely collected for laboratory analysis.

al testing of selected prototype design will be


ired to demonstrate that the trap design can meet
esign requirements.
3/30/2015

K O'Day

10

T-03 Drainage Area


108 acres

3/30/2015

K O'Day

11

T-03 Floatable Trash Trap


Quantification Study
Chronic trash in rocky channel
below outfall
Potential site for floatable trash
quantification study (108 acre DA)
Nash Run trash trap could serve as
design prototype (460 acre DA)
Nash Run trash trap cost $60,000 for
installation & 2 years maintenance
Could investigate both CSO & overland
flow floatables

3/30/2015

K O'Day

12

T-03 Outfall
Near Adams Ave & Cresentville Rd
Chronic trash in rocky channel
below outfall
Potential site for floatable trash
quantification study

3/30/2015

K O'Day

13

3/30/2015

K O'Day

14

3/30/2015

K O'Day

15

3/30/2015

K O'Day

16

3/30/2015

K O'Day

17

Interstate
695

Upper Debris
Batch

Back
River
Island
Marsh

Herring
Run
Lower
Boom

Lower Debris
Batch

Bo

3/30/2015

K O'Day

18

Anda mungkin juga menyukai