IMPLEMENTATION OF PID

CONTROLLER USING SCADA


SYSTEMS
MUHAMMAD OWAIS KHAN
RANA SHARJEEL AHMED
SADAF SHEERAZ

PROJECT SUGGESTED BY: ZEE ENTERPRISES

Scheme of Presentation
OBJECTIVE
BLOCK

& SCOPE

DIAGRAM

METHODOLOGY
COMPONENT
CONCLUSION

LIST

Objective & Scope of Project

Basically our project is consist of two Parts:


i):

Designing Of a Trainer

(We are designing an Industrial Automation Trainer For BAHRIA UNIVERSITY).

ii):

Gas Booster Plant.

(Which is Implementation Of PID Controller and a practical use of our Trainer).

Objective & Scope of Project


i) Energy Monitoring.
Following Electrical Data Will Be Monitored Remotely.

Line to Line Voltages.

Line to Neutral Voltages.

Line Current.

Apparent, Active And Reactive power

Trend Of All Parameters.

Total Active Energy / Reactive Energy.

Power Factor.

Frequency.

Objective & Scope of Project

Remote Monitoring Of VFD.


Our HMI Program Will Be Able To Remotely Monitor The Important Parameters
Of VARIABLE FREQUENCY DRIVE (VFD).

Remote Motor Controlling.


Our System will be able to Start/Stop Motors and save the History of Motors
that how many times our Motor stopped and what were the Reasons.

Objective & Scope of Project

4. P.I.D Application.
Our Main Application is to design a PID Controller Using PLC And
Control it Remotely Through HMI. For This Purpose, we are designing
a prototype of GAS BOOSTER Plant.
This Plant will Automatically Boost the pressure if and only if the
pressure of gas goes below than our required pressure. And when
the system meets the required pressure, the system will automatically
off. We will also interface this Plant to SCADA system to set the required
pressure remotely and for monitoring purpose.

Block Diagram

Methodology

SCADA TRAINER

GAS BOOSTER PLANT

Project Progress

10

We have Successfully completed seventy (70) % of our work and we


are hopeful to complete all of our work on 15th 20th April to take
part in Exhibition which is expected to be held on 26th April.

Project Timeline
TASK

11

STATUS

EXPECTED

PLC PROGRAMMING

COMPLETED

HMI PROGRAMMING

COMPLETED

TRAINER DESIGNING

COMPLETED

PLANT DESIGNING

COMPLETED

INSTALLTION OF EQUIPMENTS

NOT COMPLETED

08-Apr-15

WIRING OF TRAINER & PLANT

NOT COMPLETED

12-Apr-15

TESTING

NOT COMPLETED

15-Apr-15

REPORT WRITING

NOT COMPLETED

10-May-15

Project Costing
DESCRIPTION

12
QTY.

RATE

TOTAL

HMI 7" with Ethernet KINCO


PLC K506EA-30AT KINCO

1
1

25000
47000

25000
47000

Frequency Inverter 0.75Kw, 380V

18500

18500

Energy Analyzer PD194E-9S4


Pressure Sensor
Hooter
Bacon Light 220v
CT 30/5 Amp
CT Push Button
Emergency Push
2A SP MCB
6A TP MCB
Panel And Plant

1
1
1
3
3
3
1
2
1
2

12200
12000
1000
1000
1220
400
450
420
750
10000

12200
12000
1000
3000
3660
400
450
840
750
10000

134,800

Project Photographs

13

14

15

Thank You
Questions are
Welcomed

16