Germania Unit Rate Forecasting

Based on Other Waterflood


Pilots in the Spraberry Area

PUMP PROJECT

Objectives
To propose the location of new injection
wells in the Germania Unit.
To forecast the incremental oil recovery due
to waterflooding in other waterflood Pilot
area. The rate forecast is applied to
Germania Unit for economic purpose.

PUMP PROJECT

Coupling between injector and producer

Coupling between Injector


and Producers
1.

2.

The coupling is taken based


on the production response in
the on trend and off trend
wells during the waterflood
period.
This coupling could be used
to determine the new location
of injection wells.

Injector

On-trend
well
GSU#12

Responding

Off-trend well

Responding

G.S.U. #6

Waterflood
period
01/72 - 05/89

Oil, gas and


water

GSU#3
GSU#13

None
None

G.S.U. #8

08/71 - 02/77

GSU#2

None

GSU #1
GSU #7

Water
None

G.S.U. #11

12/65 - 01/68
02/70 - 02/75

GSU#31
GSU#13
GSU#3
GSU#20
GSU#19

None
None
None
None
None

GSU#10
GSU#17
GSU#12
GSU#7

None
None
Oil, gas and
water
None

G.S.U. #15

09/71 - 01/92

GSU#14

None
None

GSU#13
GSU#16

None
None

G.S.U. #19

06/70 - 01/77

GSU#10

Oil, gas and


water

GSU#20
GSU#9

None
Oil, gas and
water ???

G.S.U. #22

06/70 - 01/76

GSU#16

Oil, gas and


water
Oil, gas and
water

GSU#21
GSU#23
GSU#17
GSU#25

Water
None
None
None

water

GSU#26
GSU#20

None
None

GSU#26
G.S.U. #27

06/70 01/77

GSU#21

Remarks

#19 was
converted to
WIW
#12 was affected
by WIW#6

#21 was affected


by WIW#27

PUMP PROJECT

Germania (Spraberry)
Unit Layout
1.

314A
1
2

2,000

4,000

3
122A

324A

312A

115A
2

137A
114A

AT TRIBUT E MAP

3
8

331A

116A
125A

330A
310A

10
9

332A

214A

14

313A

211A

207A

140A

139A

15

317A

206A
16

215A
412A

1813

142A

19

1
1

30

23

131A

410A

113A

143A

22

119A
1

414A
405A

16

20

1
406A

24

132A

124A

411A
25

117A

503A

145A

604A

146A

27

415A
26

1
1

413A

144A

126A

409A
21

408A
407A

141A

17

31

216A

123A
130A
118A

602A
1

502A

29

603A
3

1
2

28

2
1
1

318A

209A

328A

12
2

210A

6
11

121A

June 13, 2002

13

208A

129A

By: C.F. Rounding

329A

205A
213A

138A

14

212A

128A

326A

308A

1
7

327A

311A

127A

Proposed Injectors
Old Injectors

316A

120A

325A

1
1

136A
135A

309A

323A

Well Label

133A

WELL SYMBOLS

3.

322A

321A

1
134A

POSTED WELL DAT A

Oil Well
Dry Hole
Service Well
Tem p. Abn'd Oil
Plugged & Abn'd
Abandoned Injector
PUD
Water Supply

1
3

FEET

2.

319A
315A

M idland Co., Texas

320A

Germania
The red line indicates
a (Spraberry) Unit
Proposed
Injection Wells
coupling between an
injector
and producers and rectangular
box indicates the well has
available production history.
WIWs #8, 11, and 15 did not
have significant effect on
surrounding oil production
wells.
The production responses
obtained from coupling
between an injector and
producers are parallel to the
fracture orientation in NE-SW
direction.
0

504A
1

2
1

PETRA 6/13/2002 2:59:06 PM

PUMP PROJECT

Germania (Spraberry)
Unit Layout

314A
1
2

2,000

4,000

322A

321A

1
122A

324A

133A

312A

115A
2

137A
114A

AT T RIBUT E MAP

3
8

331A

208A

116A
125A

330A
310A

10

2
9

15

317A

206A
16

215A
412A

1813

142A

19

1
1

30

23

131A

410A

113A

143A

22

119A
1

414A
405A

16

20

1
406A

24

132A

124A

411A
25

117A

503A

145A

604A

146A

27

415A
26

1
1

413A

144A

126A

409A
21

408A
407A

141A

17

31

216A

123A
130A
118A

602A
1

502A

29

603A
3

1
2

28

2
1
1

332A

214A

14

313A

211A

207A

140A

139A

The wells that have shown good


waterflood response in the other
Pilots are analyzed to determine the
incremental oil recovery during
waterflooding. The results are
applied to Germania Unit for
economic purpose.

318A

209A

328A

12
2

210A

6
11

121A

June 13, 2002

13

213A
129A

By: C.F. Rounding

329A

205A

128A

14

212A

138A

WELL SYMBOLS

326A

308A

1
7

327A

311A

127A

Proposed Injectors
Old Injectors

316A

120A

325A

1
1

136A
135A

309A

323A

Well Label

134A

POST ED WELL DATA

Oil Well
Dry Hole
Service Well
Temp. Abn'd Oil
Plugged & Abn'd
Abandoned Injector
PUD
Water Supply

1
3

FEET

The circle mark indicates the


proposed injection wells. From the
coupling between injection and
production shows that the location
of proposed injection wells #408A
and 10 should be relocated because
they are along old injector path.

319A
315A

M idland Co., Texas

320A

Germaniafrom
(Spraberry) Unit
The green ring fence is taken
Proposed
Injection
Wells
the ODaniel Pilot assuming
this
unit
would behaves similar response.
0

504A
1

2
1

PETRA 6/13/2002 2:59:06 PM

PUMP PROJECT

Water Injection in The Germania Unit


3000000

2500000

20000

2000000
15000
1500000
10000
1000000

5000

0
Jun-68

500000

Mar-71

Dec-73

Aug-76

May-79

Feb-82

Nov-84

Aug-87

May-90

0
Jan-93

TIME (DATE)

GSU-19

GSU-6

GSU-22

GSU-27

Cum. Injection

PUMP PROJECT

CUM. INJECTION RATE (BBLS)

INJECTION RATE (BBLS/MO)

25000

Production Summary of GSU - 10


100000

GSU - 10

1000

10000

100

1000

10
Jun-57

100
Dec-62

Jun-68

Dec-73

May-79

Nov-84

May-90

Oct-95

TIME (DATE)

PUMP PROJECT

GAS RATE (MSCF/MO) AND WATER RATE


(BBLS/MO)

OIL RATE (BBLS/MONTH)

10000

Decline Curve Analysis of GSU 10


(GSU 19 as an Injector)

OIL PRODUCTION (BBLS/D)

1000

GSU - 10

Waterflood started
(Jun-1970)

Waterflood ended
(Jan-1977)

100

10

1
Jun-57

Dec-62

Jun-68

Dec-73

May-79

Nov-84

May-90

Oct-95

TIME (DATE)

PUMP PROJECT

Total Incremental Oil Rate Due to Waterflood


in The Germania Unit
6

2000

4
1500
3
1000
2
500

Sep-65 Jun-68 Mar-71 Dec-73 Aug-76 May-79 Feb-82 Nov-84 Aug-87 May-90 Jan-93
Time (Date)

PUMP PROJECT

No. Of Wells

Total Oil Production Rate (BOPM)

2500

Cumulative Oil Recovery Due to Waterflood in


The Germania Unit
90000

5
70000
60000

50000
3
40000
30000

20000
1
10000
0

Sep-65 Jun-68 Mar-71 Dec-73 Aug-76 May-79 Feb-82 Nov-84 Aug-87 May-90 Jan-93
Time (Date)

PUMP PROJECT

No. Of Wells

Cumulative Oil Production (BBLS)

80000

Production Summary of The Germania Unit


120,000

70

PRODUCTION RATE

50
80,000
40
60,000
30
40,000
20
20,000

0
Jun-68

10

Dec-73

May-79

Nov-84

May-90

Oct-95

Apr-01

TIME (DATE)
OIL (STB/M)

GAS (MSCF/M)

WATER (BBLS/M)

No. OF WELLS

PUMP PROJECT

0
Oct-06

NUMBER OF WELLS

60

100,000

Decline Curve Analysis in The Germania Unit


1200.00

70

PRODUCTION RATE

Future Forecasting

50

Incremental oil expected due


to waterflood respond.
Note : 5 out of 55 producers
are converted to injectors

40

800.00

600.00

30
125% Decline Rate

400.00

20

Baseline

NUMBER OF WELLS

60

1000.00

75% Decline Rate

200.00

10

0.00
Sep-91

Jun-94

Mar-97

Dec-99

Sep-02

0
Feb-08

May-05

TIME (DATE)
OIL (STB/D)

BaseLine

ET ODaniel Rate

125% Dec. Rate

75% Dec. Rate

No. OF WELLS

PUMP PROJECT

Rate Forecasting based on Incremental Oil


from ET ODaniel Area

PRODUCTION RATE

500.00

400.00

300.00

125% Decline Rate


Baseline
75% Decline Rate

200.00
Nov-01

May-02

Dec-02

Jun-03

Jan-04

Aug-04

Feb-05

TIME (DATE)

PUMP PROJECT

Sep-05

Infill Well vs. Waterflooding


1200.00

70

PRODUCTION RATE

50
800.00
Incremental oil expected due
to waterflood respond.
Note : 5 out of 41 producers
are converted to injectors

600.00

40

30
400.00
20
Incremental oil due to
increasing number of wells

200.00

0.00
Sep-91

Jun-94

Mar-97

Dec-99

10

Sep-02

May-05

TIME (DATE)
OIL (STB/M)

Decline Line

Expected Waterflood Respond

No. OF WELLS

PUMP PROJECT

0
Feb-08

NUMBER OF WELLS

60

1000.00

Cumulative Oil Comparison between Infill Well


and Waterflooding Scenarios
CUMULATIVE PRODUCTION (BBLS)

140000

120000

100000
Incremental oil due to 15 infill wells

80000

60000

Expected Waterflood Respond


Note : 5 out of 41 producers are converted to injectors

40000

20000

0
0

200

400

600

800

1000

1200

1400

1600

TIME (DAYS)
Infill Wells

Waterflood Respond

PUMP PROJECT

1800

Decline Curve Analysis


OBrien B1, Brunson F1, Brunson C2
and Brunson G1

PUMP PROJECT

Oil Production History


OBrien B1 and Brunson F1
160

Oil Production Rate (BOPD)

140
120
OBrien B1

Brunson F1

100
80
60
40
20
12/21/98

7/9/99

1/25/00

8/12/00

2/28/01

9/16/01

4/4/02

10/21/02

Time (Date)

PUMP PROJECT

Decline Curve Analysis


OBrien B1
160

Oil Production Rate (BOPD)

140
120

CO2 Injection Started


(2/26/2001)

Waterflood Started
(October 1999)

100
80
60

Lease Electrified
1/24/01

40
20
12/21/98

7/9/99

1/25/00

8/12/00

2/28/01

9/16/01

4/4/02

10/21/02

Time (Date)

PUMP PROJECT

Comparison Cumulative Oil Recovery Due to


Waterflood and CO2 Injection
60000

Cumulative Oil Production (BBLS)

Waterflood Started
(October 1999)

Shut-in well # 38 and 39,


CO2 injector #42 and 44,
Water injector# 48
(3/16/2002)

CO2 Injection Started


(2/26/2001)

50000

40000

30000

Brunson F1
Brunson C2
OBrien B1

20000
Brunson G1

10000

0
2/9/99

8/28/99

3/15/00

10/1/00

4/19/01

11/5/01

5/24/02

Time (Date)

PUMP PROJECT

12/10/02

Total Cumulative Oil Recovery Due to


Waterflood and CO2 Injection
100000

5
Waterflood Started
(October 1999)

CO2 Injection Started


(2/26/2001)

Shut-in well # 38 and 39,


CO2 injector #42 and 44,
Water injector# 48
(3/16/2002)

80000
3
60000
2
40000
1

20000

2/9/99

Number of Wells

Cumulative Oil Production (BBLS)

120000

8/28/99

3/15/00

10/1/00

4/19/01

11/5/01

5/24/02

12/10/02

Time (Date)

PUMP PROJECT

Total Incremental Oil Rate Due to Waterflood


and CO2 Injection in The E.T ODaniel Pilot
250.00

5
CO2 Injection Started
(2/26/2001)

200.00

150.00

100.00

50.00

0.00

2/9/99

8/28/99

3/15/00

10/1/00

4/19/01

11/5/01

5/24/02

Number of Wells

Oil Production Rate (BOPD)

Waterflood Started
(October 1999)

Shut-in well # 38 and 39,


CO2 injector #42 and 44,
Water injector# 48
(3/16/2002)

12/10/02

Time (Date)

PUMP PROJECT

Water Injection in The E.T ODaniel Pilot Area


1800000
1600000
2000

1400000
1200000

1500
1000000
800000
1000
600000
400000

500

200000
0
02/09/99

08/28/99

03/15/00

10/01/00

04/19/01

11/05/01

05/24/02

0
12/10/02

Time (Date)
Water Injection Rate

CO2 Injection Rate

Cum. Water Injection

Cum. CO2 Injection

PUMP PROJECT

Cum. Water and CO2 Injection (BBLS


and MSCFS)

Water and CO2 Injection Rate (STBW/D


and MSCF/D)

2500

Total Incremental Oil Rate Due to Waterflood


in The Upper McDonald Pilot
120.00

Oil Production Rate (BOPD)

100.00

16
Start of water injection
(4 July 93)

End of water injection


(25 Nov 95)

14
12

80.00

10

60.00

8
6

40.00

4
20.00

0.00
0
05/11/93 08/19/93 11/27/93 03/07/94 06/15/94 09/23/94 01/01/95 04/11/95 07/20/95 10/28/95 02/05/96
Time (Date)

PUMP PROJECT

Cumulative Oil Recovery Due to Waterflood in


The Upper McDonald Pilot
50000
45000

Start of water injection


(4 July 93)

End of water injection


(25 Nov 95)

Oil Production (BBLS)

40000
35000
30000
25000
20000
15000
10000
5000
0
05/11/93

08/19/93

11/27/93

03/07/94

06/15/94

09/23/94

01/01/95

04/11/95

07/20/95

10/28/95

Time (Date)

PUMP PROJECT

02/05/96

1400

1600000

1200

1400000
1200000

1000

1000000
800
800000
600
600000
400

400000

200

0
31-Jan-93

200000

19-Aug-93

7-Mar-94

23-Sep-94

11-Apr-95

28-Oct-95

0
15-May-96

Time (Date)
1210W

1405W

1906W

2011W

Total Rate

PUMP PROJECT

Total Injection (BBLS)

Injection Rate (STBW/D)

Water Injection in The Midkiff Unit

Total Incremental Oil Rate Due to Waterflood


in The Heckman Pilot
160

20

Waterflood Started
(1996)

18

140
120

14
100

12

80

10
8

60

6
40
4
20
0
04/11/95

10/28/95

05/15/96

12/01/96

06/19/97

01/05/98

Time (Date)

PUMP PROJECT

0
07/24/98

Number of Wells

Oil Production Rate (BOPD)

16

Cumulative Oil Recovery Due to Waterflood in


The Heckman Pilot
70000

Waterflood Started
(1996)

Oil Production (BBLS)

60000
50000
40000
30000
20000
10000
0
04/11/95

10/28/95

05/15/96

12/01/96

06/19/97

01/05/98

07/24/98

Time (Date)

PUMP PROJECT

SUMMARY
Pilot Area

Duration of
Cum. Water
Cum. Oil
Waterflooding, Injection /No. of Production /No. of
injection wells
production wells
Years

Germania

~ 19

~2,500,000 (4)

~80,000 (5)

E.T
ODaniel

~3

~1,600,000 (6)

~110,000 (4)

Mc
Donald

~2

~1,400,000* (4)

~40,000 (15)

Heckman

Since 1996

~60,000 (18)

* Injected in the Upper and Lower Spraberry


PUMP PROJECT

OFM
PRELIMINARY RESULTS

PUMP PROJECT

Germania Unit Location

PUMP PROJECT

Example of Bubble Map of Water Cut

PUMP PROJECT

Example of Water Cumulative Map

PUMP PROJECT

FUTURE WORK
Improve OFM model to get external data from
other Database systems, such as ODBC
(Microsoft Access, Dwights and PI).
Perform similar tasks for ET ODaniel Pilot Area
(Gokul is responsible for this task)
Perform reservoir simulation

PUMP PROJECT