5 MW)
BIOMASS BASED POWER PROJECT AT YOMBIO
COUNTY IN THE REPUBLIC OF SOUTH SUDAN
January 2014
PROMOTERS BACKGROUND
2
eGateway has been in various power sector businesses for over fifteen
years, and has advised generation capacities exceeding 10,000 MW in India
on various aspects of project development, EPC contracting, counterparty
relations and contracting, linkages and strategic partnerships.
Clients include several large Indian names like IL&FS, Spice Group, Patel
Engineering, Avantha Power, Shapoorji Pallonji, DB Power, Aryan Group and
SEW Infrastructure etc.
Strictly Private & Confidential
A K Mishrais an Electrical Engineer and MBA with more than three decades
of work experience in project development, joint venture, project
management, contracting and project implementation with international
companies.
R P Guptaa Mechanical Engineer and experienced over forty years in design,
engineering, project management and plant commissioning of coal based and
gas fired plants in BHEL.
Aseem Singhalis a Mechanical Engineer and MBA. He has wide expertise in
Investment Banking, Merger sand Acquisition and Project financing.
B. Bhambhani is a techno commercial professional having experience of
more then four decades with BHEL. Carries varied experience in engineering
and contracts.
Amul Urdhwareshe is a member of the Institute of Company Secretaries of
India and a Law and Management graduate with more than two decades of
Strictly Private His
& Confidential
eGateway (I)
Pvt.
experience.
focus areas are contract structuring, documentation
and
New Delhi
regulatory issues with experience in infrastructure projects, their Ltd.,
structuring
S. No.
Project Name
Capacity
1.
Avantha Group
4 x 300 MW
2.
Ispat Group
4 X 300 MW
3.
IL & FS
2 X 660 MW
4.
3 X 660 MW
5.
2 X 600 MW
6.
2 X 660 MW
7.
2 X 660 MW
S. No.
Project Name
Capacity
1.
400 + 10%
2.
225 MW
INTERNATIONAL EXPOSURE
7
S. No.
Project Name
Location
Ras Al Khaimah,
Power Plant
UAE
2.
Sierra Leone
3.
Nigeria
4.
Nigeria
5.
Bangladesh
6.
Senegal
7.
Senegal
8.
Australia
9.
South Africa
1.
COUNTRY PROFILE
8
POWER SCENARIO
9
PROJECT HIGHLIGHTS
10
PROJECT LOCATION
11
SOUTH
SUDAN
PROJECT LOCATION
PROJECT IMPLEMENTATION
STRUCTURE
12
SALE OF POWER
13
LOCAL BIOMASS
POWER PROJECT
ENERGY
PLANTATION /
OTHER
SOURCES
Strictly Private
& Confidential
PROJECT COST
15
TOTAL DEBT
USD 26 Million
TOTAL EQUITY
USD 8 Million
TOTAL PROJECT
COST
USD 34 Million
ELECTRICITY TARIFF
BIOMASS OPTIONS
16
The biomass power projects are designed to operate on biomass. The feedstock
proposed for the biomass power plants by nature has following risks
Low density & gross calorific value requiring very high volume of feed to be
handled.
To mitigate the above risk and complete dependency on the Agricultural waste,
Energy crops are the alternate source of Feed Stock. An alternative reduce the
above risk is to develop special plant species that can be grown in Cultivable
Waste Land and Fallow Land. These wastelands can be developed in a variety
of ways designed to meet the needs of South Sudan economy -Biomass energy
plantations for fast-growing trees crops to generate electricity on marginal waste
land.
The project will provide the reliable and consistent power to the
cement plant. Which will reduce the cost of the cement in the
country, which enables Govt. to spent the saved money into the
other infrastructure projects.
THANK
YOU
Prepared By:
M/s eGateway India Pvt. Ltd.
8,Community Centre, Mezzanine Floor,
East of Kailash, New Delhi- 110065,India
Tel : +91-11-26473020/21
Fax: +91-11-42654618
Email : egateway@gmail.com