FOR CORE
A Project By,
Mr. DHERE N.B.
Mr. MANDE S.G
UNDER THE GUIDENCE OF
Prof. A. V. NANDGAVE
PUNE
SANAND
LUCKNOW
CHINCHWAD
PIMPRI
AUTO DIV.
TAL
CAR PLANT
APD/RATP
ERC
FOUNDRY
G.I.FOUNDRY
H.P.M.
MELTING
SAND PLANT
CORE SHOP
FETTLING
CORE
BOX
asbestos rope.
CYLINDER
PISTON
ASBESTOS SEAL
MACHINE
Regular
operator
Lack of knowledge
Process parameter
Change of
parameter
Change of sealing
Change of resin
CORE STUCK
TO RAM SIDE
Spring ejection
Pneumatic ejection
MATERIAL
METHOD
ROOT CAUSE
After analysis we have find the root cause of the problem
i.e. Ejection system.
Hence we discussed with company peoples and finalized the
solution i.e. HYDRAULIC EJECTION SYSTEM
Why hydraulic system?
Because in the machine already hydraulic drive is used for following
motion
1) Ram forward & retract motion
2) Door open & close motion
RAM OR
FRAME
( OD=65mm,Stroke=25mm,ID=40mm)
ADJUSTABLE
SPACER
GUIDE ROD
& BUSH
EJECTION
PLATE
CORE BOX
WITH
HEATER
PLATE
PERFORMANCE OF
HYDRAULIC EJECTION
SYSTEM
FEATURES OF HYDRAULIC
SYSTEM
EJECTION
FUTURE SCOPE
To minimize the heat transfer rate we can do the following improvements:
Refractory material to be added in between the joint of hydraulic cylinder
and ejection.
Asbestos material to be added on backside of the heater plate so that
heat transfer from heater plate to the hydraulic cylinder can be
minimized.
Development of the hydraulic seal material for sustaining the high
temperature.
THANK YOU