STRUCTURE OF THE
PRESENTATION
WHY AND WHEN:
EARLY MANUFACTURING KNOWLEDGE IMPROVES
PRODUCT SUCCESS
EXAMPLES OF BENEFITS
DFMA IN WORLD WAR II
WHAT:
WHAT IS INTEGRATED DESIGN AND
MANUFACTURE
STRUCTURE OF THE
PRESENTATION (CONTD.)
HOW:
HOW TO ACHIEVE INTEGRATED DESIGN AND
MANUFACTURE
-BDI SOFTWARE
-FMECA
EXAMPLES:
- ACCELERATION SENSING UNIT
-WORKED EXAMPLE
-POWER SUPPLY OF LASER Tx HIGH VOLTAGE
CONCLUSION
BEST PRACTICES TO
PRODUCT DEVELOPMENT
PRODUCT DEVELOPMENT
TECHNOLOGY
DEVELOPMENT
INTEGRATION
KNOWLEDGE
POINT 1
TECHNOLOGIES
AND RESOURCES
MATCH
REQUIREMENTS
PROGRAM
LAUNCH
DEMONSTRATION
KNOWLEDGE
POINT 2
DESIGN PERFORMS
AS EXPECTED
PRODUCTION
KNOWLEDGE
POINT3
PRODUCTION
CAN MEET
COST
SCHEDULE
AND
QUALITY
TARGETS
PROGRAM
BEST PRACTICE
AIM-9X
(AIR-AIR MISSILE)
F-22 FIGHTER
95%
26%
ALL CRITICAL
PROCESSES
IN STATISTICAL
CONTROL
UNKNOWN
44%
4% UNIT COST
INCREASE
1 MONTH
PRODUCTION
DELAY
23% UNIT COST
INCREASE
18 MONTH
PRODUCTION
PATRIOT
ADVANCED
CAPABILITY
(PAC-3)
MISSILE
ADVANCED
THREAT
INFRARED
COUNTERMEASURES/
COMMON MISSILE
WARNING SYSTEM
58% *
21 %
IN CONTROL AT PRODN.
78%
35 %
21%
0%
EXPERIENCE
NO UNIT COST
INCREASE
3 MONTH
PRODUCTION
DELAY
159 % UNIT
COST
INCREASE
39 MONTH
PRODUCTION
DELAY
182 % UNIT
COST
INCREASE
34 MONTH
PRODUCTION
DELAY
BENIFITS OF DFMA
THERE IS A MUCH BETTEER OPPORTUNITY TO MEET
PREDICTED COST SCHEDULE AND QUALITY
TARGETS WHEN THE MANUFACURING PROCESS
DATA IS CAPTURED EARLY
BENEFITS OF DFMA
(CONTD.)
F 18 E/F HAS 42% FEWER PARTS THAN C/D
EVEN THOUGH IT IS 25% LARGER
REDUCED
-PRODUCTION COSTS
-DEFECTS
-REWORK
BY APPLYING DFMA BDI SOFTWARE & SOURCES
OF VARIATION IN THE PROCESS
BENEFITS OF DFMA
( CONTD.)
TOMOHAWK CRUISE MISSILE
STRATEGIC
TACTICAL
PARTS
11500
7500
FASTENERS
2500
800
CIRCUIT CARDS
45
22
CONNECTORS
160
45
610
195
$1000,000
$500,000
ASSEMBLY/ TEST
HOURS
UNIT PRODUCTION
COST
ASSEMBLYTIME FOR
BALL CAGE DEVICE
REDUCED TO 15SEC
FROM 130 SEC.
8 SCREWS TO NO
SCREWS
DFMA METHOD
OF ELIMINATING
FASTENERS
ASSEMBLY
OPERATIONS
FROM 83 TO
54
TOTAL ASSY.
TIME 592SEC.
TO 277 SEC.
RIBBON BASEPLATE
DIABLO PRINTER
OLD DESIGN 77 PARTS
NEW DESIGN
36 PARTS
COMPARISON OF ORIGINAL
NEW DESIGNS OF RETICLE
ASSY.
ORIGINAL DESIGN REDESIGN
IMPROVEMENT%
2.15
0.33
84.7
24
66.7
47
12
74.5
12.63
3.65
WEIGHT LBS.
0.48
.26
71.1
45.8
ORIGINAL
OPTION 1
PILOTS INSTRUMENT
PANEL
LONG BOW APACHE
AH-64D HELICOPTER
BOEING COMPANY
OPTION 2
PILOTS INSTRUMENT
PANEL
ORIGINAL PANEL
NEW PANEL
( OPTION 1 )
PARTS COUNT
FABRICATION TIME HRS.
ASSY./INSTALLATION TIME HRS.
TOTAL TIME
HRS.
74
305
20
149/153
697
WEIGHT KG.
3.0
COST $
56000
8/153
181
2.74
15000
Advantages of DFMA
Typical results of DFMA application
Results of 88 published case studies
Decreases
51% parts count reduction
37% parts cost
50% time to market
64% in assembly time
57% in manufacturing assembly time
58% in assembly operations
69% in separate fasteners
68% in assembly defects
57% in service calls
68% in improvement in quality and reliability
Benefits of DFMA
Shorter developmental schedules and reduced
cycle times.
Better first article quality
Development of robust product designs
Easier transition of designs to production
Better supplier product integration
More effective risk management
OPTION-I
OPTION-II
OPTION - I
OPTION - II
NATURAL FREQUENCY
250 Hz
548 Hz
ESTIMATED ACCURACY
3.5 MINUTES
1.5 MINUTES
MEASURED ACCURACY
2.7 MINUTES
1.5 MINUTES
NO
YES
254 x 117 x 86 mm
254 x 117 x 78 mm
1.90 Kg
1.80 Kg
1.92 Kg
1.72 Kg
25
15
MACHINING TIME
18.1 Hours
8.3 Hours
MACHINING COST
Rs 559.17
Rs 256.75
SIZE
DFMA IN WW II
WORLD WAR II EXPERIENCE:
US AVIATION INDUSTRY GREWW TEN FOLD
P-51 MUSTANG FIGHTER
- TO FACILITATE EASE OF MANUFACTURE
STABILISERS FINS WINGTIPS SQUARED OFF
- FUSELAGE THREE SECTIONS- COMPLETE
PLUMBINGS, CABLE DISCONNECTS TO
FACILITATE ASSEMBLY AND DISASSEMBLY
FOR PACKING AND SHIPPING
DFMA IN WW II (CONTD.)
DFMA INFLUENCE ON DESIGN OF GRUMMAN F-6F
HELLCAT
- USED FEWER COMPOUND CURVES IN
EXTERNAL DESIGN-UGLY- SEVERELY
CLIPPED WINGS
- PRODUCED IN LARGE QUANTITIES
- 32 KPH SLOWER THAN F4U HERITAGE 1980
DFMA INFLUENCE PERMITTED SHIPMENT BY
BOAT OR LAND. OUT WING PANELS AND EVEN TAIL
ASSEMBLIES REMOVED AND REPLACED AT THE
DESTINATION POINT.
SPITFIRE VS.
MESSERCHMIDST
IN 1940 Mes OUTNUMBERED SPITFIRES THREE TO
ONE. DESIGN ATTRIBUTABLE TO DFMA
PHILOSOPHY. Mes 4000 LABOUR HOURS TO
SPITFIRE 13000 HOURS
AIR WAR HISTORIANS DESIGNATE SPITFIRES AS
THE BETTER AIRCRAFT, THE LONG AND
SUCCESSFUL CAREER OF ME 109s DURING ARAB
ISRAELI WAR 1948 DEMONSTRATED THAT MAJOR
ATTENTION TO DFMA PRODUCES EFFECTIVE
AIRCRAFT DESIGN EVEN AS EARLY AS 40s
SPITFIRE VS.
MESSERCHMIDST.
SPITFIRE:
DESIGNED FOR AERODYANAMIC
PERFORMANCE AND STRUCTURAL
EFFICIENCY
BEAUTIFUL ELLIPTICAL WINGS CHOSEN FOR
AERODYNAMIC PERFORMANCE WAS A
NIGHTMARE TO MASS PRODUCE
DIFFICULT TO LEARN TO FLY, HIGHLY
MANOEUVERABLE
WAS PRODUCED IN LARGE NUMBERS
BECAME A MAJOR FORCE IN BATTLE OF
BRITAIN AIR CAMPAIGN 1940-41
SPITFIRE VS.
MESSERCHMIDST
MESSERCHMIDST
DESIGN WAS A DFMA CLASSIC
A MINIMUM OF COMPOUND CURVES USED IN THE
EXTERIOR
RUDDER AND HORIZONTAL STABILISERS WERE
SQUARED OFF FOR PRODUCTION EFFICIENCY
COCKPIT CANOPY WAS MADE ALMOST ENTIRELY
OF FLAT GLASS
20 MM CANNON FIRED THROUGH A HOLLOW
PROPELLER SHAFT TO OVERCOME
COMPLEXITIESOF WING INSTALLATION AND TO
ELIMINATE SIGHTING PARALLAX
DFMA
THREE MAIN APPROACHES TO DESIGN FOR
ASSEMBLY HAVE BEEN DEVELOPED AND USED
Viz.:
DESIGN HEURISTICS
DESIGN RATINGS
DESIGN REVISION
DESIGN HEURISTICS
GENERAL SET OF RULES eg.:
MINIMIZE THE NUMBER OF PARTS &
ASSEMBLY DIRECTIONS
AVOID PARTS THAT SHINGLE TANGLE etc.
HEURISTICS CAN BE APPLIED TO A
DESIGNERS THINKING PRIOR TO ACTUAL
PRODUCT DEVELOPMENT OR ONCE AN
ASSEMBLY IS COMPLETE
USED TO SIMPLIFY PRODUCT
DESIGN RATING
PROVIDE RATINGS FOR COMPONENTS AS
WELL AS OVERALL DESIGN
ASSEMBLY RATINGS CAN BE CALCULATED
BDI HAS THEORETICAL HANDLING AND
MATING RATINGS
OTHER DFA RATING METHODS PROVIDE
DIFFERENT SCHEMES
DFMA METHODOLOGY
WALKING THROUGH A CONCEPTUAL OR
EXISTING DESIGN IN A VERY SPECIFIC
PROCEDURE THROUGH OUT
THE PROCEDURE FOLLOWED AND THE DATA
BASE SYSTEM ALLOWS A DESIGN ENGINEER OR
CROSSFUNCTIONAL TEAM TO ANALYSE AND RATE
PRODUCT DESIGNS FOR EASE OF ASSEMBLY,
DESIGN EFFICIENCY AS WELL AS PREDICT
PRODUCT ASSEMBLY AND MANUFACTURING COST
DFMA
METHODOLOGY(CONTD.)
CAD RESULTED IN POWERFUL QUANTITATIVE
OR ANALYTICAL TOOLS, PROVIDED BASIS FOR
JUDGING A DESIGNERS PERFORMANCE. DFMA
HAS GIVEN MANUFACTURING ENGINEERS SUCH A
TOOL.
DFMA IS ATTEMPTING TO FORESEE AT THE
PRODUCT CONCEPTUAL DESIGN STAGE , WHAT
MANUFACTURING ASSEMBLY AND QUALITY
PROBLEMS WILL BE TO ARRIVE AT A BETTER
PRODUCT
DFMA tools
DFM TOOLS
DFM ACTIVITY
OPTIMIZE SIMPLIFY
DFM TOOLS
DESIGN AXIOMS
DFM GUIDELINES
DESIGN FOR ASSY. METHOD
TAGUCHI METHOD
MFG. PROCESS DESIGN RULES
DESIGNERS TOOLKIT
COMPUTER AIDED DFM
GROUP TECHNOLOGY
FMEA
VALUE ANALYSIS
CONCEPT
ENSURE
PROCESS
CONFORMANCE
OPTIMIZE
PRODUCT
FUNCTION
DFMA Team
Multidisciplinary teams
Design engineers
Manufacturing engineers
Shop floor mechanics
Suppliers reps
Specialist in product support
Maintainability
Reliability
DFMA
BDI software
Is used by manufacturing team members to estimate
and predict the savings that can be obtained.
Data are entered system does its analysis in
different areas.
A complete listing of all the activities required to
perform the assembly including
It provides complete overview of the tasks to be
performed
DFMA TECHNIQUE
DESIGN CONCEPT
SUGGESTIONS FOR
SIMPLIFICATION FOR
PRODUCT STRUCTURE
SUGGESTIONS FOR
MORE ECONOMIC
MATERIALS AND
PROCESSES
PRODUCTION
BDI
software
It does an assembly analysis profile on a standard format where it theorizes the
number of tasks to be performed, fasteners required, connectors to be installed,
candidates for elimination, acquisition of items not in reach or in stock, requisition
of tools not in hand, standard operations, library of operations and
recommendations.
System provides suggestions for design and indicating every task with its time
saving and its percentage reduction. It indicates specific instructions to perform
the related tasks in order to obtain the suggested savings.
It also lists design for assembly analysis totals all parameters used for analysis
such as total assembly time, totally assembly cost, total assembly weight, number
of parts, sub assemblies theoretical minimum numbers of parts or unanalysed sub
assemblies and the hourly labour rate.
All suggestions and comments included in the computer generated tables are
automatically provided to aid the designers and manufacturing engineers to obtain
a better view of the job
Results of Design for Assembly (DFA) Analysis for the Motor Drive
Assembly Redesign
TYPICAL FUNCTIONAL
FLOW
1.3.2.1.1
CHARGE STORAGE
CAPACITOR
1.3.2.1.6
TRANSMIT PULSE
THROUGH LENS
1.3.2.1.2
RECEIVE PULSE
INITIAE SIGNAL
1.3.2.1.5
CREATE LASER
PULSE SHAPE
1.3.2.1.3
DISCHARGE CAPACITOR
THROUGH LASER DIODE 1
1.3.2.1.4
CREATE LASER
PULSE ENERGY.
AND
P 1.3
PRODUCE PASSIVE
RECEIVER
AND
P 1.6
ASSEMBLE INTO
UPPER HOUSING
ASSEMBLY
P 1.7
PRODUCE LOWER
HOUSING ASSEMBLY
P 1.4
PRODUCE FLEX.
ASSEMBLIES
P 1.5
PRODUCE PWB
ASSEMBLIES
P 1.3.2
CLEAN BOND
PADS
P 1.3.3
WIRE BOND
CODER
P 1.3.4
PICK AND PLACE
PbSe
INTERCONNECT
STANDOFF
P 1.3.2
CLEAN BOND PADS
P 1.3.6
INSPECT
P 1.3.5
WIRE BOND
PbSe
ACTIVITIES TO ACHIEVE
MFG. KNOWLEDGE
CONDUCT FMEA
Contd..
BEST APPROACH TO
PRODUCT DEVELOPMENT
SYSTEM
TECHNOLOGY
DEVELOPMENT
KP1
KP2
TECHNOLOGY MATURITY
DESIGN MATURITY
PRODUCTION MATURITY
KP3
PRODUCTION
CONCLUSION
THE NEED FOR DFMA DURING EARLY STAGES OF PRODUCT
DEVELOPMENT IS SEEN
TWO METHODS Viz. BDI AND FMECA APPROACHES APPEAR TO
BE YIELDING EXCELLENT RESULTS.
A COMBINATION OF THE TWO IS LIKELY TO SERVE OUR
PURPOSE BOTH IN MECHANICAL AND ELECTRONIC PRODUCTS
( INDUSTRY STD.)
1 IN 22 PARTS PRODUCED
EXAMPLES OF
PROTOTYPES USED
PROTOTYPE
PURPOSE
BUILD
ENVIRONMENT
PRODUCT
PRODUCT
INTEGRATION
DEMONSTRATION
ENGG. PROTOS.
VIRTUAL OR
PHYSICAL
PRODUCTION
PRODUCTION
REPRESENTATIVE
PROTOTYPES
INITIAL PRODUCTS
DEMONSTRATE
DEMONSTRATE
PRODUCT IS
DEMONSTRATE
FORM FIT
CAPABLE RELIABLE
READY FOR FULL
FUNCTION AND
A STABLE DESIGN AND MFG. PROCESSES SCALE PRODUCTION
IN CONTROL
ENGINEERING
PRODUCTION ALL
RATE TOOLING
Advantages of DFMA
Ford $ 1.2 billion in 87 using DFA alone
GM 30-60% on certain projects in 89
MD-11 cargo liner savings per aircraft $ 86,000, a
bulkhead cost saving $4,000
McDonnel Douglas has ranged 36-96% parts count
reduction on several of its aircraft component
assemblies
FA-18 CD bay shelf design savings
WHAT IS DFMA
DFMA IS AN EXACTING DESIGN REVIEW
METHOD
IT IDENTIFIES:
-OPTIMAL PART DESIGN
-MATERIAL CHOICE
-ASSEMBLY AND FABRICATION OPERATIONS
TO PRODUCE AN EFFICIENT AND COST
EFFECTIVE PRODUCT
IT REVEALS THAT INITIAL IDEAS MAY NOT BE