Outline
Background
Cases
Simulation Result
Summary
Background
The Bontang LNG has 5 trains available, with CO2 feed gas
limitation of 8% except for train H of 6.5 %.
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
2025
2026
2027
A1-A6
300
171
68
25
10
B1
1007
842
657
492
343
323
318
217
99
94
65
55
50
B2
572
567
455
331
224
221
142
58
53
39
35
32
21
B3
17
14
C1-C3
50
45
29
15
74
100
100
100
100
96
53
19
E1-E3
11
18
30
43
55
62
62
F1
51
85
80
53
21
40
F2*
396
422
422
339
216
163
124
F2**
130
160
160
160
193
267
319
357
F3
61
325
341
341
311
286
287
287
G*
48
144
144
144
144
133
61
G**
290
290
290
290
290
290
290
257
183
131
93
Total
2021
1786
1747
1487
1172
1299
1882
1658
1462
1276
1107
1049
994
GAS COMPOSITION
ALL UNITS IN % MOL
PLANT
A1-A6
B1
B2
B3
C1
F1
F2
F3
CO2
11.31
4.35
4.70
14.26
11.01
0.70
8.60
2.06
1.02
1.96
1.05
N2
0.13
0.08
0.05
0.05
0.05
0.22
0.10
0.19
0.06
0.17
0.04
CH4
78.04
86.21
86.12
73.53
81.60
97.58
85.30
88.15
96.05
88.74
97.14
C2H6
4.88
3.96
3.78
6.24
4.42
0.23
3.00
5.10
1.38
4.90
0.77
C3H8
3.22
2.91
2.88
3.23
1.61
0.42
1.20
3.03
0.81
2.83
0.47
i-C4H10
0.64
0.66
0.63
0.67
0.40
0.19
0.30
0.49
0.16
0.46
0.12
n-C4H10
0.79
0.71
0.73
0.90
0.33
0.22
0.30
0.62
0.23
0.60
0.15
i-C5H12
0.29
0.31
0.30
0.32
0.17
0.11
0.10
0.14
0.08
0.14
0.07
n-C5H12
0.41
0.19
0.20
0.21
0.09
0.07
1.10
0.10
0.06
0.10
0.05
C6H14
0.04
0.62
0.62
0.58
0.33
0.26
0.00
0.11
0.14
0.11
0.10
Neo-Pentane
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Cyclo-Hexane
0.05
0.03
0.01
0.03
0.00
0.01
0.00
0.00
0.00
0.00
0.01
Benzene
0.06
0.03
0.01
0.04
0.00
0.00
0.00
0.00
0.00
0.01
0.00
Toluene
0.03
0.02
0.00
0.02
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Ethyl-Benzene
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
M/P/O-Xylene
0.02
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
= Relatively Leaner
Badak Export
Manifold
CASES
To simulate the impact of big gas producer (>100 MMscfd)
shutdown
Case 8:
Domestic
Trip 250
MMSCFD
Case 7:
G Trip (F2
to Supply
Domestic)
Case 1:
Normal
Case
Case 2:
B1 Trip 50%
Case
Study
Case 6:
F3 Trip
Case 3:
B2 Trip
Case 4:
D Trip
Case 5:
F2 Trip (F3
to Supply
Domestic)
Case 4
2500
2000
1500
1000
Case 1
500
2500
2000
2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027
1500
Lean Gas
Rich Gas
Case 5
500
0
2500
2000
Year
Rich Gas
Lean Gas
1500
Year
Rich Gas
Lean Gas
Percentage
in each gas outlet
9.00
8.00
Other trains
7.00
Train H
6.00
5.00
Composition of CO2 (%)
4.00
3.00
2.00
1.00
0.00
2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027
Year
Case1
Case2
Case3
Case4
Case5
Case6
Case7
Case8
1.5
1
0.5
0
-0.5
2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027
-1
Case 2
Case 3
Case 4
Case 5
Case 6
Case 7
Case 8
SUMMARY
Case 5 at 2027 shows that the East Kal gas export only
for domestic industry causing Bontang LNG shutdown
due to no gas supply.