PIPING INSPECTION
API 570
Piping Inspection Code
570
Matthews Engineering Training Ltd
Optional:
Water,steam and
condensate
Piping related to
mechanical equipment
(pumps/compressors
etc)
Pressure vessels
Domestic sewers etc
Everything< in dia
Non-metallic piping
INJECTION POINTS
INJECTION POINT
INSPECTION AREAS
12in or 3D upstream
This area is
known
as:The
IPC(injectio
n point
circuit)
Matthews Engineering Training Ltd
2nd change of
flow
direction
downstream
(or 7.6m after
the first
change)
Intern
al
visual
s
TMLs
(4 quadrants)
DEADLEGS
Corrosion rates are
higher
around deadlegs
Redundant deadlegs
should be removed
Deadleg
CORROSION UNDER
INSULATION (CUI)
CORROSION UNDER
INSULATION (CUI)
CORROSION UNDER
INSULATION (CUI)
CORROSION UNDER
INSULATION (CUI)
Almost total
wastage of bolts
Acid vapours
CORROSION UNDER
INSULATION (CUI)
at 4<t<120 degC
BUT
SOIL/AIR INTERFACES
CORROSION UNDER
INSULATION (CUI)
% NDT on
suspect areas
within CUI
temperature
range
Class 1
75%
50%
Class 2
50%
33%
Class 3
25%
10%
Type of
circuit
TMLS FOR
EROSION/CORROSION
Downstream of ..
EROSION/CORROSION
An
example
Erosion/Corrosio
n after flowrestriction
features
STRESS
CORROSION
CRACKING (SCC)
Rule:
In most circumstances,SCC is
due to
What is this?
Repair patch
Max D/2
Not permitted
Matthews Engineering Training Ltd
Min 2D
Medium risk
Low risk
Thickness
External
measurements visual
Class 1
5 years
5 years
Class 2
10 years
5 years
Class 3
10 years
10 years
Injection
points
3 years
By class
S/A interfaces
By class
Class 1
Class 2
Most other process piping
On-site hydrocarbons
H2, fuel gas and natural gas
On-site acid and caustics
Class 3
Fluids that will not
flash off (even if they
are flammable)
Distillate/product
storage/loading lines
Off-site acids and
caustics