Methods
ExxonMobil Development Company
Norman Archibald
International Drilling Schools
EPMI #1
DATE
TIME
15 BBLS
1. PIT GAIN
175 PSI
2. DP PRESS
0.00
RKB
300 PSI
3. ANNULUS PR.
2195 PSI
(A) CASING
(B) FORMATION
662 PSI
162 PSI
0
4. MUD WT
Drillers method
MUD WT CHOICES
OUTSIDE CSG
9.0 PPG
INSIDE CSG
9.6 PPG
5. LAST CSG
10.75
OD
40.50
#/FT
0.00
K55
GR.
0.00
2600
FT.
3130
BURST PSI
10.3 PPG
11.1 PPG
OVERBALANCE PRESS
(A) D.C.
2600 FT MD
Assign responsibilities
pump controller
choke operator
BBL/FT
FT
BBLS
STROKES
0.0079
180
1.4
13
0.0087
500
4.4
39
0.0175
4120
72.3
640
0.0000
0
692
BBLS
STROKES
14.50 PPG
21. CAPACITIES ANN
TD to BOP
5.07
OD
0.00
19.50
#/FT
0.00
XH
TJ
0.00
4120
FT
4.250
ID
0.000
(A) D.C.
(B) D.P.
(C) C.L.
9. DRILL COLLARS
BBL/FT
FT
0.0326
180
5.9
52
0.0698
500
34.9
309
0.0698
4120
287.4
2546
0.0000
0.0
0.0000
0.0
0.0326
180
5.9
52
0.0698
500
34.9
309
0.0698
1520
106.0
939
0.0000
0.0
328
2907
OPEN HOLE
8.00
OD
5.07
2.85
ID
3.00
180
FT
500
(A) D.C.
(B) D.P.
4800 FT TVD
78
692
406
3599
800 BBL
HOLE ANGLE
9.88 " OD
0 DEG
1206 BBL
Traditional
Paper Kill Sheet
0.0
78.1
2600 FT TVD
8. DRILL PIPE
200 PSI
(B) D.P.
6. CSG SEAT
9.6 PPG
16. ORIGNAL
BAL+O.BAL
0.41
0.1129 BBLS/STR
BAL+O.BAL
499
6.50 "LINERS
VOL. INCREASE
BAL+O.BAL
33
12. PUMP
11.00 "STROKE
3 TYPE (2or3)
590 SX
39 BBL
13. INFLUX HT
0.49 SX/BBL
PSI @
311 FT TVD
311 FT LONG
20
SPM &
2.26 BPM
115 PSI
BAL/O.BAL
124
133 PSI
0.095 PSI/FT
Kill Sheet
(DP)
Drill Pipe
Casing
ICP
FCP
ICP
Casing
(DP)
Drill Pipe
Casing
FCP
Drill Pipe
Strokes Pressure
0
ICP
Drill Pipe
Strokes
FCP
FCP Constant
Strokes
Casing Pressure
Kick removed
Strokes or Time
9 Circulating Well Control Methods
70
60
50
40
30
20
10
0
0
Figure 5.4
200
400
600
800
1000
1200
BBLs Pumped
10 Circulating Well Control Methods