Understanding Projects
Consider two scenarios.
1. One needs a training program while
2. The other is Construction of building.
Assume that we have realized and defined
the problem into statement and now we are
at the third stage i.e., designing a project.
WBS
Activities can be divided into subactivites and work
packages. This process is called work break down
structure (WBS).
Work
Physical and mental effort, exertion or exercise of
skill to overcome obstacles and achieve an objective
Breakdown
division into parts or categories
Structure
something arrange in a definite pattern
There are levels of activities and work packages
which are made by indent button
a sequence of activities
Contd..
Linked Tasks
Tasks are of two kinds:
To Link to Tasks
1. Select the tasks you want to link and the press
link button
on Standard Toolbar
2. In front of task name, we have predecessor
column where we enter the serial no of a task
which we want to link.
3. Drag and Drop: Click in mid of a bar (which
represent the task), hold the mouse and then drop
on other bar
Linked Tasks
Below is the FS bars for tasks
Splitting a Task
A task will start on particular date but you may
discover that a person completing the task is
going on vacations so vacation should not be
counted and we split the task