MinProSim
Valo
r
225
% Solidos en Finos
35
% Solidos en gruesos
77
75
3.2
Finos (%)
100.00
99.97
99.96
99.96
99.96
99.96
99.96
99.96
99.96
99.88
99.51
96.67
88.97
77.00
67.59
58.13
49.52
42.27
37.96
32.78
0.00
1662.504
29.914
Tamao de
malla (mm) Descarga Molino
1.189
100.000
0.841
99.996
0.595
99.908
0.420
99.546
0.297
98.703
0.210
96.025
0.149
90.100
0.105
77.618
0.074
57.444
0.053
37.803
0.044
28.693
0.037
20.189
0.000
0.000
TPH
% slidos
?
67.196
Gruesos
Hidrocicln
100.000
99.998
99.951
99.631
97.438
90.382
79.634
62.228
39.841
20.782
13.102
6.622
0.000
Finos
Hidrocicln
100.000
99.998
99.950
99.788
99.603
99.155
98.076
94.256
82.956
68.459
59.238
43.786
0.000
?
69.595
42.260
21.049
Propiedad
Valor
5.2
1.1
Ls (m)
0.23
Propiedad
Valor
7.06
4.39
Valor
8.22
48
29
Propiedad
Valor
7.02
6.80
Caso de estudio
Dk =207 cm
dt =70 cm
Dk =311.7 cm
Sk =295 cm
ls =15 cm
Energa especfica, E
*
*
dd
d
kWh
kW
E
Ton Ton h
Tamao de partcula, d*
Donde E, es la
energa
especfica
para moler
una tonelada
de mineral por
unidad de
tiempo
n=
1.5
1
E 2k *
d
E 10Wi
P80
0.5
*
d0
0.5
F80
0.5
2k = 10 Wi
d* = P80
d0* = F80
0 .5
E 10Wi
100
E=
0.5
0.5
Modelado de la Potencia
P=10Wi [(1/P80)0.5 (1/F80)0.5 ]m
N
N
M = Peso de la carga
r =Radio al centro de gravedad
= ngulo de Levantamiento
Bond:
P=10Wi [(1/P80)0.5 (1/F80)0.5 ]m
Teora de Bond
Capacidad Mxima
Determinacin de la capacidad de
molienda
F80: 5500 micras
P80: 120 micras.
72% de velocidad crtica
38% de nivel de carga
Wi: 15.1 kWh/t
Molino de 10 X 18
% solidos en el molino : 76%
Teora de Bond
Wi Operativo
Determinacin del ndice
operativo
TPH 74.5
F80 5600 micras
P80: 150 micras.
72% de velocidad crtica
38% de nivel de carga
Molino de 10 X 18
% solidos en el molino : 76
Potencia: 653 kW
Calibracin de Angulo
de levantamiento
Determinacin de
potencia disponible
3.00
4.00
70.00
35.00
7.85
583.00
5.00
75%
F80
10000um
P80
98um
densidad
3.2g/cm3