PROJECT

presentation on
CHARACHTERISTIC PERFORMANCE
OF PEB VS CSB
Presented By
Abhay Murde,
Omkar Rahinj,
Kadam Pawan,
Adhav Sachin

Under The Guidance of


Prof. A.A. Sengupta

PRE ENGINEERED BUILDINGS

Tailor made building based on


clients requirement & actual
design calculations using
tapered sections.

A combination of built up
section, hot rolled section,
cold
formed elements and
profiled sheets
Designing and casting is done
in factory
Building
components
are
brought to site
Then fixed/jointed at the site
All connections are bolted.

CONVENTIONAL STEEL BUILDINGS

Very common in industrial


steel structure & actual
design calculations using
plain section given by IS.

A combination of built up
section, hot rolled section,
and profiled sheets
Designing and casting is done
partially or fully factory
Then fixed/jointed at the site
Connections are welded or
bolted which is as per
requirement.

BRIEF HISTORY OF PEB

Steel was very expensive item in WORLD.


The concept of PEB originate in USA.
The idea was that section should be provided as per
B.M.D.
This lead to the saving in steel and development of
PEB concept.

APPLICATIONS OF PEB and CSB

Industrial Buildings
Warehouses
Commercial Complexes
Showrooms
Offices
Schools
Indoor Stadiums
Outdoor Stadiums with canopies
Gas Stations
Metro Stations, Bus Terminals, Parking Lots
Primary Health Centers, Angan wadis
And many more

P E B vs CSB

CONT.
Industrial Building

Railway Station

P E B vs CSB

High rise Building

.
Ware house

P E B vs CSB

ADVANTAGES of PEB over CSB

Aesthetic Appeal
Faster Completion
Economical
Seismic Resistance
Ease of Expansion
Maintenance Free
Large Clear Spans
Controlled Quality
Hassle Free

Self weight
30% lighter
Primary Member is
tapered section
Secondary members
are light weight rolled
framed Z and C
section

Self weight
More heavy
Primary members
are Hot rolled I
section
Secondary
members are I or
C section which
are heavy in weight.

Delivery average 6 to
8 weeks
Foundation-simple
design, easy to
construct & light wt.
Erection cost and timeaccurately known
Erection process is
easy, fast, step by step

Delivery- average 20
to 26 weeks
Foundation- expensive,
heavy foundation
required.
Erection cost and time20% more than PEB
Erection process is
slow and extensive
field labor is required.

Seismic Resistancelow weight flexible


frames offer higher
resistance to seismic
forces
Overall price
-30%lower
architecture-achieved
at low cast

Seismic Resistancerigid heavy weight


structures do not
perform well in
seismic zones
Overall price - Higher
Price per square
meter.
Architecture- achieved
at higher cost

P E B vs CSB

OBJECTIVES OF STUDY

To prepare a report on Characteristic


performance of Pre Engineered building Vs
Conventional Steel building.

To set the Economic advantages of both the


building.

To liberate the Strength and Durability


characteristic of both the building.

To make the comparatives studies of PEB


and CSB.

SCOPE OF STUDY

IN TODAYS CONSTRUCTION INDUSTRY, PROJECT


ARE IMPLEMENTED ON FAST TRACK BASIS.

SELECTION OF MATERIAL PLAYS CRUCIAL ROLE IN


FAST TRACK BASIS PROJECT.

STEEL IS A BEST OPTION FOR DESIGNER, IT


PROVIDE FLXIBILITY, DUCTILITY, STRENGTH ETC.

IN STEEL MATERIAL, DESIGNER CAN GO FOR PEB


OR CSB.

GUIDELINES FOR PEB DESIGN AT PROPOSAL


STAGE
ALL DESIGNS SHALL BE AS PER MBMA AMERICAN

STANDARDS UNLESS CLIENT SPECIFIES AS PER IS


CODE
LIVE

LOAD AS PER AMERICAN CODE = 0.57


KN/M^2 AND AS PER IS CODE = 0.75 KN/M^2.
(REDUCTION IN LIVE LOAD TO BE INCORPORATED
FOR BUILDINGS HAVING HIGHER SLOPES)

AS

PER
AMERICAN
CODE
:HORIZONTAL
DEFLECTION
=
L/180
&
VERTICAL
DEFLECTION=Eh/100 FOR MAIN FRAMES.

WIND TERRAIN CATEGORY 3 IS TO BE SELECTED

UNLESS MORE DATA IS AVAILABLE.

CONTD

IN AMERICAN DESIGN , WIND COEFFICIENTS TO BE


FOLLOWED AS GIVEN IN MBMA.

IN IS DESIGN, INTERNAL & EXTERNAL BUILDING


WIND COEFFICIENTS AS PER IS -875 (PART-3).

GENERALLY BUILDINGS ARE TO BE DESIGNED AS


PINNED EXCEPT FOR BUILDING SPAN >30M OR
CRANE CAPACITY OF MORE THAN 5 TONS OR HEIGHT
GREATER THAN 9 M

STANDARD PURLIN LAPS SHOULD BE 385 mm

Steps of Design

Wind load calculation


Purline Design
Girt Design
Design of Main Frame
Base Plate
Anchor Bolt design for Moment Condition
Anchor Bolt design for Shear Condition
Gable column design
Design of connection plate
Cranes Design

CONCLUSION

Steel is a versatile material that every object we


see in daily life has used steel directly or indirectly.
Steel remains and will continue to remain logical
and wide choice for construction purpose,
environmentally also, as much of the steel used is
recycled.
Its strength and large clear spans mean the
design is not constrained by the need for
intermediate support walls. As your requirements
changes over the years, you can reuse, relocate,
& modify the structure.
The major advantage of metal building is the high
speed of design and construction for buildings
of various categories.