Dosen Pengampu:
Ferry Hermawan, ST, MT, PhD
Pustaka Acuan
Sajekti, A. (2009) Metode Kerja Bangunan Sipil, Graha Ilmu, Yogyakarta
Hardiyatmo, H.C. (2006) Penanganan Tanah Longsor dan Erosi, Gadjahmada
University Press, Yogyakarta
Hermawan et al. (2010) Pengaruh Pembebasan Lahan Terhadap Risiko
Proyek Konstruksi (Studi Kasus Social Engineering Proyek Jalan Tol Ruas
Semarang Bawen), Jurnal TEKNIK (ISSN 0852-1697), Volume 32, Nomor 2,
Tahun 2011, 88-94.
http://ejournal.undip.ac.id/index.php/teknik/article/view/1706
Hermawan et al. (2011) Factor Influencing Decision Making Process of
Transportation Infrastructure Project in Natural Extreme Condition: A Case
Study of Semarang-Solo Toll Road Project. Proceeding ICPT7 Bangkok, Thailand
August
Hermawan, F, Rachmawati, T and Wahyono, H.L. (2015) Does
demographic pattern matter for sustainable infrastructure policy?, Procedia
Engineering Vol. 125, 481-488.
Discovery Channel (2004) We Built this City London (Indonesian Subtitles).
Video CD. Media Line.
Pertemuan Kesatu
Lokasi Pembebasan
Lahan di Lokasi StudiPaket III Tol SemarangSolo (TMJ, 2010)
Patok Tepi
Konstruksi
Patok Sumbu
Jalan
Patok Batas
Urug
Depan
1.75 /
8.25
http://www.graphicsfactory.com/
search/tripod-p1.html
12+050
Patok
Pengawas
an
Belaka
ng
Patok Tepi
Konstruksi
Patok
Pengawas
an
P
g
Pt
C
L
i
gt
a
b
d
h/
i
h
d = a+b+
h/ipatok tepi
a = jarak
konstruksi dari patok sumbu
b = lebat (atas) parit tepi
jalan
h = ketinggian titik patok
tepi galian atas ketinggian
konstruksi
i = landai tebing galian
1b
4
6
2a
3b
2b
3a
4a
4b
5a
3
5
Link: http://www.industrytap.com/10-billion-tunnel-under-the-alps-on-track-to-open-in-2016/15459