Review Meeting of
Master Infrastructure Consultant
work of MBSIR
Presented to
Gujarat Industrial Corridor Corporation Ltd
(GICC)
Presented by:
Agenda
Abouttheprojectsite
ProjectObjective&Scope
ProgressofworkTilldate
Datacollection
FurtherActionPlan
Supportsoughtfromemployerandqueries
Project Objective
Assessment and
validation the
existing roads and all
utility services.
Develop strategies
for phased
development to
ensure sustainable
development
Feasibility studies of
infrastructure
components.
Prepare preliminary
and/or detailed
engineering design
and drawings for
various components.
Prepare tender
documents and assist
in selection of DB
contractors, EPC
Contractors and
Employers Engineers,
EIA Consultants
Project Scope
Conti
Conti
Meetings
A Kick Off meeting was called on 2.07.2016 by the client
for discussion on project approach and methodology,
progress of work, Role and Responsibility of various key
experts, project time line, various deliverables, way
forward etc.
Meeting with GICC and MBSIRDA official on 15.07.2016 for
progress of work after award of the work.
Also, regularly meeting with GICC and MBSIRDA official
carry out regarding the progress of work, discussion on
various deliverables, further planning on the project etc.
Conti
Site visit
Carry out site visit of the proposed MBSIR area on dated 30.06.2016 by
WAPCOS
engineers
to
understand
the
existing
topography
and
infrastructure facility.
Reconnaissance site visit with GICC and MBSIRDA official on 12.07.2016
of propose MBSIR area to understand the topography, drainage pattern,
various available source etc of the propose MBSIR area.
Carry out site visit by the our engineer to identify and measure the
existing structure crossing the drain passing from Maruti Plant (within
MBSIR).
Conti
Data collection
Secondary data i.e. Development Plan, Map of development plan,
Toposheet
purchased
from
Survey
of
India
(SoI),
Department
Data required
Progress / Status
(BSNL),
Reliance, IDEA, Airtel,
Vodafoneetc.
Gujarat
Energy Details of existing switchyard location, We have contacted Executive Engineer,
Transmission Corporation existing and proposed transmission network Construction division, GETCO. and received
Limited(GETCO)
&detailsofpowersupply.
details of concern office for get data i.e. Sh.
H.D. Sharma, Supertending Engineer,
Mehsana.
Gujarat
Industrial Details of existing and Proposed Industrial WeshallplanpersonallyvisitGIDCatMBSIR
Development Corporation AreainGIDC.
areaandcollecttherequireddata.
(GIDC)
Details of effluent location, type, quality and
quantityofindustrialwasteandeffluent.
Gujarat
State
Road
Development Corporation
(GSRDC)
GujaratWaterSupplyand
SewerageBoard(GWSSB)
IrrigationDepartment
Conti
Sr.
No.
Department
Maruti Suzuki
Limited(MSIL)
Road
&
Department
10
Data required
Progress
Building ExistingandProposedRoadDevelopment
Plan with details of road type, its section
itsconnectivityetc.
Sardar
Sarovar DetailsofexistingBranchcanalandother
Narmada
Nigam canalnetworkinproposedMBSIRarea.
Limited(SSNNL)
Salientfeatures&L-SectionofZinzuwada
&KharaghodaBranchcanalatthelocation
of off taking and boundary of proposed
MBSIRarea.
We will carry out Market survey and Demand Assessment, which covers
macro-economic study of region, opportunity assessment at global, national
and regional level, detail discussion with various stakeholder & Government
Department. Also, Identify the Availability of Human Resource and expected
employmentpotentialetc.
Also, validate all the relevant studies on the basis of assessment and
incorporate all relevant interface in the preliminary/ detailed design for the
respectiveinfrastructurecomponent.
Based on the Assessment and Validation Report, we shall prepare broad
phasingplananddemarcatepriorityareafordevelopmentofPhase-1,MBSIR
area.
ProposedLocationofTrafficandAxialLoadsurvey
LocationNo-4onMDRBecharajitoMehsana
LocationNo-1atBecharajiTown
LocationNo-2athansalpurChokdi
LocationNo-7onSH135
LocationNo-8onSH55
LocationNo-3VitthalpurChokdi
LocationNo-5onSH133
LocationNo-6onSH7
projectlikeTPconsultantetc.
Constitute steering committee to approval of the various
report,output,andvarioussubmissionsforthesaidproject.
Earlyreleaseofpaymenti.e.5%ofthetotalconsultancyvalue.