TWIN SCREW
TRIPLE SCREW
D1
Casing types
Impeller types
Pump curve
BHP
Efficiency
Total Head
Efficiency
BHP
System curve
Capacity
Operating point
PUMP INSTALLATION
PRE-INSTALLATION CHECKS
Condition of pump set-free rotation, pump internals (if
dismantled) etc
Cleaning of system piping
Piping supports
Handling facility
Foundation/base plates (cleanliness of mounting pads)
Auxiliary piping, drainage
Suction piping minimum 5D straight run
Eccentric reducer in suction piping
PUMP INSTALLATION
DURING INSTALLATION CHECKS
Pipe flanges (alignment with pipe flanges)
Coupling and alignment (cold/hot)
Auxiliary piping connections
Hydrostatic pressure test
Operation of valves
Electrical connections
PUMP COMMISIONING
COMMISSIONING CHECKS
Suction/discharge pressure (others if applicable)
Set duty point
Voltage, current, speed
Temp-bearing housing, pump body, motor body,
seal gland. seal pot
Vibration, sound level
Ensure safety operation
Corrective actions, if required.
SEAL SELECTION
If Vp <1 bara
Single seals may be used together with auxiliary device as
indicated in table.If handling dirty fluid a clean flush
should be provided or back to-back pressurized seal is
used.
If Vp > 1 bara
Single seal with a drying running back or un-pressurized tandem
seals may be used.
If Vp >1 bara and the fluid hazard > 8 Pressurised back to back
seals to be used
Max. Value of
individual rating
Summation of H,F,R
Throttle bush
FLUSHING
Removes heat generated between the rubbing faces.
Provides lubrication.
Increases margin between vapor pressure and stuffing
box pressure.
Keeps liquid inside stuffing box in constant circulation.
Incase of external fluid flushing:Flushing does not
allow abrasives to reach seal faces.
QUENCHING
API PLAN-11
API PLAN-13
API PLAN-21
API PLAN-23
Questions,
if any ?????