TRUJILLO
Formulacin y Evaluacin de Proyectos
2s.
Henry contreras
Concept
RECURSOS Vs RESERVAS
MINE DEVELOPMENT
PHASES
EXPLORACIONES MINERAS
Exploraciones
SE REALIZA CON LA FINALIDAD DE BUSCAR Y LOCALIZAR
YACIMIENTOS O LUGARES QUE PUEDAN CONTENER MINERAL
ECONMICO Y SE PUEDA CONSTRUIR UNA MINA
Exploraciones
Programa de perforacin
Geohydrologic Investigations
in the rock mass surrounding an open pit has a detrimental effect on
mining operations for the following reasons:
1. Water pressure reduces the stability of pit slopes by reducing the
shear strength of potential failure surfaces. Water pressure in tension
cracks, or similar near vertical fissures, reduces stability by
increasing the forces tending to induce sliding.
2. High moisture content results in an increased unit weight of the rock
and hence gives rise to increased transport costs. Changes in moisture
content of some rocks, particularly shakes, can cause accelerated
weathering with a resultant decrease in
3. Freezing of groundwater during winter can cause wedging in water
stability.
filled fissures due to temperature-dependent volume changes in the ice.
Freezing of surface water on slopes can block drainage paths, resulting
in a buildup of water pressure in the
slope with a consequent decrease in stability.
4. Erosion of both surface soils and fissure infilling occurs as a result of
the velocity of flow of groundwater. This erosion can give rise to a
reduction in stability and also to silting up of drainage systems
5. Discharge of groundwater into an open pit gives rise to increased
operating costs because the water must be pumped out, and also
because of the difficulties of operating heavy equipment on very wet
ground. Blasting problems and blasting costs are increased by wet
blastholes.
Estudios Proyectos
Avanzados
El ciclo de vida de un proyecto minero se define
por tres etapas claves (milestones):
Preliminary Economic Assessment (PEA)
Pre-Factibilidad (PFS)
Factibilidad (FS)
Estudio Preliminar
Econmico (Scoping Study)
Definiciones
Un Preliminary Economic Assessment (PEA) significa un estudio
que no sea de Pre-Factibilidad o Factibilidad, y que incluya un anlisis
econmico de la viabilidad potencial de recursos minerales (NI43-101
June 2011)
El Scoping Study es una evaluacin preliminar de un proyecto
minero generada con una cantidad razonable de perforacin, pruebas
limitadas metalrgicas y un diseo limitado de ingeniera (Johnson et
al, 2001)
Un estudio conceptuales el primer estudio que se
debera completar en un proyecto. Es una evaluacin preliminar de un
proyecto en base de suposiciones y factores conocidos (de experiencia).
Caractersticas de un PEA
Recursos Medidos, Indicados, y/o Inferidos
permisible
Se puede utilizar Recursos Inferidos solamente
Normalmente una mezcla de Indicados e Inferidos
Las estimaciones tcnicas y de costos se
hacen basadas en experiencia establecida
(rules of thumb)
<5% de Ingeniera
Identificar temas ambientales y regulatorios
Capex y Opex entre -20% a +50% de exactitud
Tiempo para cumplir: tpicamente 2-3 meses, con
2-3 QPs especialistas
PREFEASIBILIT EXECUTION
FEASIBILI
Y
TY
INGENIERIA
<5%
10-20%
20-50%
50-60%
NORMA AACE
FEL5
FEL4/3
FEL2
FEL1
-10% to
+25%
-10% to
+15%
PRECISION
-15% to 30%
%CAPEX
CONTINGENCIA
-5% to +10%
<0.75%
<1.5%
<3.5%
Variable
>30%
>30%
15% to
20%
10%
Item
Concept or
Scoping study
Pre-feasibility study
Feasibility study
Inferidos
Indicados
Medidos
Generar
alternativas de
Ingenieria.
Proporsiona
informacion para
justificar una
decision de
proceder a un
estudio de
prefactibilidad, se
continua
Porcentaje de la ingenieria
2% - 5%
terminada
exactitud de la estimacin en el orden de
de costos
50%
Tipica linea inferior de
en el orden de
contingencias.
30%
Tiempo tipico requerido
3 - 6 months
para presenatr
El coste tpico para el
reporte final
5% - 15%
25% - 50%
en el orden de 30%
en el orden de 20%
en el orden de 15%
6 - 12 months
18 months
Fuente: http://www.kallpasab.com
Fuente: http://www.kallpasab.com
Fuente: http://www.tetratech.com/
Fuente: http://www.ingemmet.gob.p
Monzonite Rocks
Sedimentary Rocks
Litologa (
Alteracin
Alteracin Propiltica
Alteracin Arglica
ALTERACIN CLORTICA
Seccin 2600
(N15E)
Seccin con
Alteraciones
Seccin Geolgica
Estudio de Pre-factibilidad
lanta de Procesos
Proceso de trabajos en ensayos.
Ensayos pilotos.
muestras compositadas por tipos de mineral y zonas..
Diagramas de flujo de procesos
Diagramas de flujo y balance de masa disponible
Mayor cantidad de equipos de planta identificados
P&Ids (seleccin preliminar de equipos)
Layouts Planta
alternativas de Ubicacin / seleccin de la mejor alternativa.
sistemas de procesos conocidos, dimensionamiento preliminar y
capacidades de los equipos conocidos
Los tamaos de construccin, tipo y disposicin general de equipos,
Estudio de Factibilidad
QU ES UN ESTUDIO
DE FACTIBILIDAD?
Anlisis comprensivo
que sirve para recopilar
datos relevantes sobre
el desarrollo de un
proyecto y en base a
ello tomar la mejor
decisin y si se procede
su estudio, desarrollo o
implementacin.
21 de marzo de
2010
Estudio de Factibilidad
ESTIMATE TYPE
PRE-FEASIBILITY
FEASIBILITY
Preliminary
Preliminary
Basic
Basic
Detailed
Detailed
Assumed
Necessary
Preliminary
General
Preliminary
Assumed
Necessary
Options
General
Basic
Detailed
Necessary
Fixed
Actual
Detailed
Preliminary
Basic
Detailed
Basic
Basic
Review of Property
Lease, claims lists and
mineral rights
Basic
Basic
Basic
Detailed
Final
Secured
Geology
Introduction
Site Location Map
Topography Map
Property Ownership
Preliminary
Preliminary
Review of Property Lease
Historical Chronology
Past Production (if any)
Geology Assessment
Preliminary
Preliminary
Preliminary
Detailed
Detailed
Detailed
Estudio de Factibilidad
ESTIMATE TYPE
PRE-FEASIBILITY
FEASIBILITY
None
None
Geologic Controls
Established
Well Established
Well Established
Tonnage Factors
Preliminary Analysis
Preliminary Analysis
Detailed Analysis
Statistical Analysis
Basic
Detailed
Detailed
Geostatistical Analysis
Basic
Detailed
Detailed
Detailed
Detailed
Calculated
Optimized
Estimated
Estudio de Factibilidad
ESTIMATE TYPE
PRE-FEASIBILITY
FEASIBILITY
Mining
Geological/Block Model Preliminary
Resources
Inferred & Indicated
Advanced
Indicated & Measured
Final
Indicated and Measured
None
Status Identified
Approximate
Assumed
Assumed
Identified & Ranked
Conceptual
Preliminary
Probable
Not Completed
Areal
Preliminary
Conceptual
Selected
Preliminary
Long Range
Mine Schedule
Equipment
Waste Dumps
Mine Support Facilities
Labour
Revenue & Cost
Estimates
Tailings Disposal
Preliminary
Basic on Annual Basis
Approximate
Defined
Preliminary
Basic
Preliminary
Basic
Based similar Operations In House Data
Preliminary
Basic
Preliminary
Detailed
Basic
Estudio de Factibilidad
ESTIMATE TYPE
FEASIBILITY
Detailed
Essential
Recommended
Detailed
Detailed
Basic; 80mm dia and up
Basic-Detailed
Detailed
Basic
Basic to Detailed
Detailed
Detailed
Detailed
Detailed
Detailed
Detailed
Estudio de Factibilidad
ESTIMATE TYPE
PRE-FEASIBILITY
FEASIBILITY
Environmental Assessment
Permits
Preliminary Overview
Preliminary Overview
Surface Water
Preliminary Overview
Bio-physical
Environment
Monitoring and
Reclamation Plans
Preliminary Overview
Preliminary Overview
Draft
Completed Plan
Ejemplos de Referencia
Modelo de bloques
Topografa
Precios
Recuperaciones
Costos operativos
Sectores geotecnicos
Algoritmos
Otros
Conos Minables
Vista perfil
Vista Planta
Tasa Optima de
Produccin y Estrategia
de Ley de Corte
NPV por tasa de produccin
Estrategia de Ley de
Corte y Tasa Optima de
Produccin
Leyes de
Corte Anuales
Estrategia de Ley de
Corte y Tasa Optima de
Produccin
Evaluacin
del NPV
Diseo de Botaderos
ngulos de Reposo
Rampas
Lift
ARUNTANI TUCARI
ARUNTANI TUCARI
Plan de Minado Junio 2006
Poligonos de Minado
5184
5176
5160
5168
5152
5144
5136
Ech6
o5
Bc
14 4
1.12
1.46
1.27
1.75
Bco 5128
Bco 5136
Bco 5160
1.01
Bco 5152
1.15
Bco 5160
Bco 5168
0.69
0.43
0.75
0.48
Bco 5176
0.00
Ech3 Zon
ad
eE
cha Ech2
de
r os
Zona de Morrenas
Ech1
Abra
0.35
Bco 5184
0.00
Rampa SE
ARUNTANI - TUCARI
Planeamiento
Shot
5152_008
5136_004
5152_009
5184_016
5160_011
5160_012
5144_005
5176_022
5176_023
5168_021
5160_013
5168_022
5168_023
Bench
5152
5136
5152
5184
5160
5160
5144
5176
5176
5168
5160
5168
5168
Mineral M3
41,418
47,486
72,821
0
41,373
41,718
84,716
54,191
0
19,130
22,395
34,923
83,860
TOTAL GENERAL
544,032
Mineral TM
Desmonte TM Au (g/Tn) Total TM
70,410
0
1.46
70,410
80,726
0
1.27
80,726
123,796
0
1.15
123,796
0
141,383
0.00
141,383
70,335
0
1.12
70,335
70,920
0
0.69
70,920
144,018
0
1.75
144,018
92,125
37,558
0.35
129,683
0
65,060
0.00
65,060
32,520
15,910
0.48
48,431
38,071
12,420
0.75
50,491
59,369
0
1.01
59,369
142,562
30,307
0.43
172,869
924,854
302,640
1.00
1,227,493
Onzas
3,308
3,303
4,589
0
2,535
1,566
8,085
1,047
0
499
923
1,930
1,954
0.00
0.00
0.00
0.41
0.49
0.33
0.00
0.21
29,737
Densidad Insitu:
Stripping
0.00
0.00
0.00
Area
Pit Tucari Oste
Pit Tucari Oste
Pit Tucari Oste
Pit Tucari Este
Pit Tucari Este
Pit Tucari Este
Pit Tucari Oste
Pit Tucari Este
Pit Tucari Este
Pit Tucari Este
Pit Tucari Este
Pit Tucari Este
Pit Tucari Este
Periodo
Junio 2006
Junio 2006
Junio 2006
Junio 2006
Junio 2006
Junio 2006
Junio 2006
Junio 2006
Junio 2006
Junio 2006
Junio 2006
Junio 2006
Junio 2006
0.33
2.3
TM/taladro:
785.7
Dendidad
1.7
1.7
1.7
1.7
1.7
1.7
1.7
1.7
1.7
1.7
1.7
1.7
1.7
N Talad
90
103
158
180
90
90
183
165
83
62
64
76
220
1.70
1562
N Talad/dia: 50.4
Dias Trabajados:
Material/dia
Celda
Celdas/Mes
Celdas/Dia
Mina TM
20,400
34,000
16.0
0.5
Recuperacion:
Mina M3
12,000
Pad TM
20,400
Desmonte TM
10,200
632,400
Total Mina TM
30,600
Viajes Min
800
Viajes Des
400
292,454
Stripping
0.50
75%
Onzas Depositadas
Onzas Recuperadas
Kgr/dia - Produccion Mina
Kgr/dia - Depositadas en Pad
Kgr/dia Recuperados
$/Oz:
400
20,334
15,251
20.40
20.40
15.30
Mineral-Cumbre
Mineral-Echadero
Desmonte
Satnd By
>=80%
>=80%
>=80%
Empuje Mineral
Carguio Mineral
Empuje a Echaderos
>=80%
Conformar Desmonte
ARUNTANI TUCARI
Plan de Minado Junio 2006
Bco 5160
Bco 5144
Bco 5152
Bco 5176
Bco 5184
Bco 5168
Bco 5136
Bco 5128
Au g/t
Zona de E
c
5184
5176
5160
5168
5152
5144
5136
haderos
5192
ARUNTANI TUCARI
Plan de Minado Junio 2006
04
5
Bco
Abra
10
184
08
09
Bc
1
o5
76
12
5
Bco
11
05
16 8
Bco 5152
13
06
60
Bco 51
03
01
07
02
Bco 5144
Bc
5184
5176
5160
5168
5152
5144
5136
Echa6
6
13
5
o
Bco 5128
ARUNTANI TUCARI
Plan de Minado Junio 2006
Au g/t
5184
Secuencia
Shot
Jun06-04
5184_016
TOTAL
Bench
5184
Mineral M3
Mineral TM
0
0
0
0
Onzas
0
0
Stripping
Dendidad
1.7
N Talad
180
180
ARUNTANI TUCARI
Plan de Minado Junio 2006
Au g/t
5176
Secuencia
Shot
Jun06-08
5176_022
Jun06-09
5176_023
TOTAL GENERAL
Bench
5176
5176
Mineral M3
54,191
0
54,191
Mineral TM
Desmonte TM Au (g/Tn) Total TM
92,125
37,558
0.35
129,683
0
65,060
0.00
65,060
92,125
102,619
0.35
194,744
Onzas
1,047
0
1,047
Stripping
0.41
1.11
Dendidad
1.7
1.7
1.70
N Talad
165
83
248
ARUNTANI TUCARI
Plan de Minado Junio 2006
Au g/t
5168
Secuencia
Shot
Jun06-10
5168_021
Jun06-12
5168_022
Jun06-13
5168_023
TOTAL GENERAL
Bench
5168
5168
5168
Mineral M3
19,130
34,923
83,860
137,913
Mineral TM
Desmonte TM Au (g/Tn) Total TM
32,520
15,910
0.48
48,431
59,369
0
1.01
59,369
142,562
30,307
0.43
172,869
234,452
46,217
0.58
280,669
Onzas
499
1,930
1,954
4,383
Stripping
0.49
0.00
0.21
0.20
Dendidad
1.7
1.7
1.7
1.70
N Talad
62
76
220
357
ARUNTANI TUCARI
Plan de Minado Junio 2006
Au g/t
5160
Secuencia
Shot
Jun06-05
5160_011
Jun06-06
5160_012
Jun06-11
5160_013
TOTAL GENERAL
Bench
5160
5160
5160
Mineral M3
41,373
41,718
22,395
105,486
Mineral TM
Desmonte TM Au (g/Tn) Total TM
70,335
0
1.12
70,335
70,920
0
0.69
70,920
38,071
12,420
0.75
50,491
179,326
12,420
0.87
191,746
Onzas
2,535
1,566
923
5,024
Stripping
0.00
0.00
0.33
0.07
Dendidad
1.7
1.7
1.7
1.70
N Talad
90
90
64
244
ARUNTANI TUCARI
Plan de Minado Junio 2006
Au g/t
5152
Secuencia
Shot
Jun06-01
5152_008
Jun06-03
5152_009
TOTAL GENERAL
Bench
5152
5152
Mineral M3
41,418
72,821
114,239
Mineral TM
Desmonte TM Au (g/Tn) Total TM
70,410
0
1.46
70,410
123,796
0
1.15
123,796
194,207
0
1.26
194,207
Onzas
3,308
4,589
7,897
Stripping
0.00
0.00
0.00
Dendidad
1.7
1.7
1.70
N Talad
90
158
247
ARUNTANI TUCARI
Plan de Minado Junio 2006
Au g/t
5144
Secuencia
Shot
Jun06-07
5144_005
TOTAL GENERAL
Bench
5144
Mineral M3
84,716
84,716
Mineral TM
Desmonte TM Au (g/Tn) Total TM
144,018
0
1.75
144,018
144,018
0
1.75
144,018
Onzas
8,085
8,085
Stripping
0.00
0.00
Dendidad
1.7
1.70
N Talad
183
183
ARUNTANI TUCARI
Plan de Minado Junio 2006
Au g/t
5136
Secuencia
Shot
Jun06-02
5136_004
TOTAL GENERAL
Bench
5136
Mineral M3
47,486
47,486
Mineral TM
Desmonte TM Au (g/Tn) Total TM
80,726
0
1.27
80,726
80,726
0
1.27
80,726
Onzas
3,303
3,303
Stripping
0.00
0.00
Dendidad
1.7
1.70
N Talad
103
103
ARUNTANI TUCARI
Plan de Minado Abril 2006
ARUNTANI TUCARI
Plan de Minado Abril 2006
PLAN DE LLENADO MENSUAL JUNIO 2006 PAD II
Plan Mes (Tn)
Plan Mes (Tn)
Plan Dia (Tn)
Plan Dia (m3)=
Fecha Inicio
FECHA
26/05/2006
27/05/2006
28/05/2006
29/05/2006
31/05/2006
02/06/2006
03/06/2006
04/06/2006
06/06/2006
07/06/2006
07/06/2006
09/06/2006
10/06/2006
11/06/2006
12/06/2006
13/06/2006
15/06/2006
16/06/2006
17/06/2006
19/06/2006
20/06/2006
21/06/2006
23/06/2006
24/06/2006
25/06/2006
744,000
437,647
24,000
14,118
26/05/06
LIFT N
5
5
5
5
5
5
5
5
5
5
5
5
5
6
6
6
6
6
6
6
6
6
6
6
6
CELDA N
32
31
22
21
20
19
18
23
10
11
12
3
4
35
50
49
36
24
29
23
30
31
22
37
38
Dias Trabajados:
N DIAS
1
1
1
1
2
2
1
1
1
1
0
1
2
1
1
1
1
1
1
1
1
1
1
1
1
31
31
AREA (m2)
1,000
1,000
2,460
2,500
2,829
3,329
2,500
1,548
2,500
1,897
846
2,342
2,949
1,315
1,405
2,500
2,500
2,191
2,500
2,500
2,500
2,053
2,500
2,500
2,500
54,664
VOLUMEN (m3)
8,000
8,000
19,679
20,038
22,634
26,634
20,075
12,380
20,092
15,175
6,772
18,735
23,595
10,521
11,240
20,005
20,020
17,530
20,000
20,000
20,000
16,486
20,012
20,025
20,000
437,647
Planeamiento
25/05/06
VOL ACUM (m3)
8,000
16,000
35,679
55,717
78,351
104,985
125,060
137,441
157,533
172,708
179,480
198,215
221,809
232,330
243,570
263,575
283,595
301,124
321,124
341,124
361,124
377,610
397,622
417,647
437,647
BALANCE GENERAL
Balance General
Definicin:
Es un informe contable que presenta en
forma ordenada la situacin financiera de
una empresa en un momento en el tiempo
(esttico).
Presenta y vala el valor de los recursos
que se encuentran en propiedad o posesin
de la entidad, esto es, bienes y derechos
de la empresa (activos).
Presenta y vala las deudas y obligaciones
que gravan esos activos y los derechos de
los acreedores (pasivos).
Presenta y vala la naturaleza de las
aportaciones y derechos de los accionistas
o propietario, tanto de la inversin original
(capital aportado) como de los incrementos
PRINCIPIOS DE CONTABILIDAD
GENERALMENTE ACEPTADOS - PCGA
Principios de contabilidad mas importantes:
1.
CONCEPTO DE VALUACION AL COSTO
Los activos deben registrarse a su valor de costo (de adquisicin o de
produccin).
2.
CONCEPTO DE DEVENGADO
Los ingresos, costos y gastos se reconocen a medida que se ganan o se
incurre en ellos, independientemente de si se han cobrado o pagado,
respectivamente.
3.
CONCEPTO DE REALIZACION
Los resultados econmicos se computan una vez ejecutada la operacin
mercantil, no antes.
EL BALANCE GENERAL
Balance general es un Estado Financiero que nos presenta la situacin
financiera de la empresa, a una fecha dada
Balance General
Activo
En que ha invertido la
empresa
Pasivo + Patrimonio
De donde se ha financiado
la empresa
ACTIVOS:
PASIVOS:
PATRIMONIO:
PASIVO + CAPITAL
ACTIVO - CAPITAL
ACTIVO - PASIVO
Concepto de Activo
Es el conjunto de recursos
financieros que pertenecen a una
entidad
Es el conjunto de bienes,
propiedades y derechos que tiene
una entidad.
Concepto de Pasivo
Esta constituido por las deudas u
obligaciones de carcter financiero
contradas por la entidad con
terceros, fuera de la compaa.
Concepto de Capital
Contable
Son las aportaciones hechas a una
empresa por su dueo o sus socios,
ms las utilidades retenidas o menos
las perdidas acumuladas en la
misma.
BALANCE GENERAL
al 31/12/2003
ACTIVO
PASIVO
Caja y Bancos
Valores Negociables
Existencias
PATRIMONIO
Capital
Activos fijos
Reservas
Resultados acumulados
TOTAL ACTIVO
TOTAL PASIVO Y
PATRIMONIO
Circulante
Activo
No circulante
Desembolsos que
con el transcurso
del tiempo se
transformarn en
gastos
Activo Circulante
(Principales Cuentas)
Caja
Bancos
Inversiones
temporales
Clientes
Documentos por
cobrar
Deudores diversos
Almacn de
mercancas
Seguros pagados
por anticipado
Rentas pagadas
por anticipado
Intereses pagados
por anticipado
Activo Fijo
(Principales Cuentas)
Terrenos
Edificio
Mobiliario y equipo de oficina
Equipo de transporte
Equipo de computo
Activo Diferido
(Principales Cuentas)
Gastos de Organizacin
Gastos de Instalacin
Pasivo
Crditos
Diferidos
A largo plazo o
Fijo
Proveedores
Documentos por pagar
Impuestos por pagar
Acreedores diversos
Crditos diferidos
Rentas cobradas por anticipado
Intereses cobrados por anticipado
Acreedores hipotecarios
Prestamos bancarios a largo plazo
Documentos por pagar a largo plazo
Capital Contable
Capital contribuido
Capital Social
Capital Ganado
Utilidad del ejercicio
Utilidad de ejercicios anteriores
Perdida del ejercicio
Perdida de ejercicios anteriores
El orden de presentacin se
encuentra regulado por los
siguientes criterios:
El activo se ordena por disponibilidad
El pasivo se ordena por exigibilidad
En el capital contable se presenta
primero el capital contribuido y despus
el capital ganado
Encabezado
Nombre de la entidad
Mencin de que se
trata de un estado de situacin
Financiera
Fecha de formulacin
Cuerpo mismo
Del
Estado
Ttulos descriptivos
Nombre de los rubros
Subdivisiones de los rubros
Estructura del
estado de situacin
financiera
Formatos de presentacin
del estado de situacin financiera
En forma de cuenta:
El cuerpo del balance se divide en dos
mitades. La de la izquierda se destina
a registrar el activo. En el lado
derecho se detalla primero el pasivo y
despus el capital contable.
Balance General
Ejemplo en forma de Cuenta
Formatos de presentacin
del estado de situacin financiera
En forma de reporte:
Se le conoce como forma vertical
porque los tres grupos aparecen
ordenados de esta manera; uno ms
tras otro, primero el activo, despus
el pasivo, finalmente el capital
contable.
Balance General
Ejemplo en forma de Reporte
Ejercicio No. 1
Elabore el Balance General en forma horizontal de
la Compaa Comcel S.A. Nit. 800.1654-3 con
fecha de corte diciembre 31 de 2007.
Solucin
Ejercicio No. 2
Ejercicio
No.
3
Elabore el Balance General en forma horizontal de
ARRENDAMIENTOS OGLIASTRI Nit. 800.2359-4 con
fecha de diciembre 31 de 2009.